684
|
Thu Jan 9 12:46:43 2025 |
JB, MP, CC | AIDA timing test |
|
   |
396
|
Wed Feb 16 10:32:52 2022 |
PJCS | AIDA software changes and some suggestions | The Pi console monitor program now outputs
a full date/time to file for each line of
report. |
|
681
|
Wed Jan 8 10:08:29 2025 |
JB, GB, SD, MP, CC, JG | AIDA noise test with platform in position | Yesterday we spent time essentially performing
a dry run to get AIDA DAQ and bPlast into
the time sorter, there were some issues with |
   |
702
|
Tue Apr 8 08:52:39 2025 |
TD | AIDA grounding |
AIDA DSSSDs and FEE64-DSSSD cabling are electrically
isolated (by design) from snout, mounting |
 |
8
|
Thu Sep 20 09:39:17 2018 |
TD | AIDA downstream window |
The AIDA downstream window ('endcap' of snout)
consists of 2x 50um aluminized mylar sheets |
|
432
|
Thu May 12 10:10:51 2022 |
TD, OH | AIDA data throughput |
Attachment 1 - top aida06
|
15x |
423
|
Sat May 7 13:27:39 2022 |
TD | AIDA configuration |
Adaptor PCB link settings
|
|
696
|
Fri Jan 31 13:48:29 2025 |
JB | AIDA analysis from HI-DESPEC meeting 20.11.2024 | AIDA analysis and presentation by J. Bormans
for AIDA made in the HISPEC-DESPEC collaboration
meeting. |
|
64
|
Thu Aug 15 14:09:39 2019 |
NH | AIDA Waveforms | Noise seemed less strong today, unsure
of cause. I had re-taped snout as tape was
not sticking well. |
10x |
28
|
Thu Mar 21 13:59:08 2019 |
NH | AIDA Water | The AIDA water system has been repaired
and not leaking.
The interlock did not light immediately, |
|
418
|
Mon May 2 13:08:49 2022 |
NH | AIDA Updates 2 May | The snout endcap has been sealed with new
copper tape over the red tape
|
 |
419
|
Tue May 3 14:15:17 2022 |
NH | AIDA Updates 2 May |
PAUSE/RESUME stats are dominated by 2x FEE64s
- aida07 and aida16
|
|
516
|
Fri Dec 16 14:02:12 2022 |
NH | AIDA System off for christmas break | The AIDA NIM crate, pis and workstation have
been powered off for the Christmas break
and will not be accessible |
|
163
|
Mon Feb 1 15:19:07 2021 |
NH | AIDA Status Feb 2021 | 01.02.2021 - Four new sets of PSU, HDMI &
Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for |
|
164
|
Sat Feb 6 10:45:55 2021 |
NH | AIDA Status Feb 2021 | > 01.02.2021 - Four new sets of PSU, HDMI
& Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for |
   |
31
|
Fri Mar 22 13:32:55 2019 |
NH | AIDA Startup @ 22.03.2019 | FEEs have been on this morning, temperatures
attached
Leakage current attached |
 |
632
|
Wed May 22 20:10:19 2024 |
NH, CC, HMA, MV, ZC, KZ | AIDA Snout Remounted | AIDA and the Snout have been remounted in
S4
|
9x |
511
|
Tue Aug 30 13:48:32 2022 |
NH | AIDA Single Switch Configuration | The second switch was moved back to CARME
so AIDA has been configured back to using
a single switch
|
|
27
|
Wed Mar 20 15:35:10 2019 |
NH | AIDA Setup @ GSI | Currently
- 1 DSSD and Plastic is in the
AIDA snout, which is not mounted |
|
166
|
Mon Feb 22 18:18:47 2021 |
NH | AIDA Rates/Situation | The ground cable (LEMO00) in aida07 was disconnected,
it has been reinserted and the waveforms
now look good.
|
8x |