  167   Sat Feb 27 12:47:57 2021 NHAIDA Rates/Situation Updated figures as of 27 Feb 2021 - S4 is
now closed for experiments but may open on
Wednesday.
 10x 
  564   Mon Apr 8 10:23:16 2024 TD, JBAIDA Noise optimisationIn the morning we reinstalled FEE64s aida06,
aida13, aida07. The rails of the FEE64 boards
were found to be incorrect (that of the rails
 30x 
  402   Fri Mar 4 08:40:36 2022 OH, NHAIDA Noise and grounding tests 3rd March - ResultsGrounding implemented


Each
FEE given direct connection to heavy duty
earth bar via adaptor board lemo ground
Earth
 9x 
  401   Thu Mar 3 08:45:03 2022 OH, NHAIDA Noise and grounding tests 3rd MarchPulser spectra


Changes
to the nn pulser circuit yesterday have improved
the peak widths on the p+n side
p+n
 8x 
  121   Mon Jan 20 14:01:23 2020 NHAIDA Noise 20.01.2019> Checking noise

> DESPEC crate entirely offline except:
 6x 
  125   Fri Feb 14 12:50:29 2020 NHAIDA Noise 14.02.2020Electricians changed the grounding for the
DESPEC platform to a large pillar that goes
deep into soil
 6x 
  120   Wed Jan 15 14:53:41 2020 NHAIDA Noise 14.01.2019Checking noise

DESPEC crate entirely offline except:
 6x 
  385   Wed Oct 20 13:26:08 2021 NH, OHAIDA Noise + FilteringTurn on AIDA (SL6) to investigate noise situation
and impact of new RC filters on bias input
 6x 
  213   Fri Apr 9 16:45:29 2021 NH, HA. GA, GZ, OH, TDAIDA NoiseAIDA snout was reconnected and we saw originally
a very good reduction in noise from S452
(fig 1)
 6x 
  375   Tue Aug 17 12:39:25 2021 NH, TDAIDA NoiseInvestigate noise situation of AIDA (no DSSSDs
connected)
 16x 
  376   Thu Aug 19 10:37:50 2021 TDAIDA Noise
11:30 BNC PB-5 pulser polarity chnaged from
positive to negative (using LOCAL control)
  
  378   Fri Aug 20 14:33:24 2021 TDAIDA Noise
> 11:30 BNC PB-5 pulser polarity chnaged
from positive to negative (using LOCAL control)
 6x 
  379   Sun Aug 22 18:40:08 2021 TDAIDA Noise> > 
> > 11:30 BNC PB-5 pulser polarity chnaged
from positive to negative (using LOCAL control)
  
  66   Mon Sep 16 12:24:46 2019 NHAIDA Monitoringhttps://docs.google.com/spreadsheets/d/1fZBybHodSvacUdKpDM_VKznqTrh49CKnqKVQVMEDWGs/edit?usp=sharing

A spreadsheet of ambient conditions
and water temperature in S4 for AIDA.
  
  53   Tue Jun 4 09:19:10 2019 NHAIDA InterlockCurrently AIDA's interlock is off (no
lights) and hence AIDA cannot be powered
on. Under investigation - power supply has
  
  138   Tue Mar 10 10:16:56 2020 OHAIDA Implant Range ScanA range scan was performed using AIDA.
See the GSI elog: https://elog.gsi.de/despec/S480/19
  
  530   Thu Mar 7 15:15:29 2024 JB, NH, CCAIDA HV Bias Test IV Curve
AIDA I-V
Test


Voltage
  
  404   Mon Mar 7 12:20:26 2022 NH, TDAIDA Grounding Checks Mon 7 MarRemove all DSSD ribbon cable braid ground
from FEE64s to check n+n ground loops
 14x 
  47   Wed Apr 10 12:33:58 2019 NH VPAIDA Firmware UpdateAll AIDA modules have been updated to a
new firmware 0xd330701 which should fix the
merger issues.
 20191004-FeeTemps.png20191004-GSIWR.png 
  277   Sat Apr 24 13:25:23 2021 NH, TDAIDA FEE64 crash log for S460
https://docs.google.com/spreadsheets/d/1CyL5L-WLsh9fsS7CN989GC3ktqiPQOkG8YIDJrrGxYA/edit#gid=0
  