AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 33 of 33  ELOG logo
Entry  Thu Dec 6 15:31:40 2018, TD, CA, NH, December 6th 2018 11x
15.32 1.8.W spectra for aida01, aida09, aida10, aida11, aida12 (attachments 1, 2, 3)
      2 and 3 expanded in Y and X direction respectively
Entry  Sat Dec 1 16:43:47 2018, TD, Analysis of WRTest28Nov18.dat analyser.fWRTest28Nov18.outCapture.PNG

Attachment 1 - analyser.f 
Entry  Sat Oct 13 17:26:53 2018, TD, Analysis of 3 October 2018 T4 tests 7x
 
Entry  Thu Sep 20 09:39:17 2018, TD, AIDA downstream window 

The AIDA downstream window ('endcap' of snout) consists of 2x 50um aluminized mylar sheets
Entry  Thu Sep 20 09:16:31 2018, TD, Images of AIDA setup for DESPEC 9x
Attachment 1 - detail of MSL type BB18(DS)-1000 p+n junction side strips, bias ring, multiple guard rings, filed 
plates and bond wires
Entry  Thu Sep 20 08:57:48 2018, OH, Thursday 20th September 180920_0958_Temp.png180920_1007_Stats.png180920_1042_LowEPulser.png180920_1117_HighEPulser.png
09:57 Alpha run stoppped R2_0 -> R2_2

      Thresholds dropped from 0x64 to 0xa
Entry  Wed Sep 19 12:40:41 2018, OH, TD, Single DSSD Installation and Tests 21x
On the 18th of September we installed DSSD 3208-14

Was found to have problems including exponential leakage behavior
Entry  Thu Sep 13 17:21:59 2018, TD, AIDA upstream window 

The upstream window of the AIDA detector assembly consists of 2x 50um aluminized mylar
Entry  Thu Sep 6 15:42:53 2018, OH, TD, FEE64 system console logs logs.tar

Kernel panics during boot cab be observed in files ttyUSB1 and ttyUSB5
Entry  Thu Sep 6 15:25:19 2018, OH, TD, AIDA@DESPEC Setup Photos 
 
Entry  Thu Sep 6 15:11:17 2018, OH, TD, Tuesday 4 September - Thursday 6 September 19x
Attachment 1 - FEE64 temperatures illustrating (we assume) a faulty PSU temperature sensor for aida07

Attachment 2 - FEE64 temperatures following replacement of aida07
ELOG V3.1.4-unknown