Fri Jan 25 12:26:17 2019, NH, Raspberry Pi Startup & Information
|
Two raspberry pis:
nnrpi1 - FEE64 system consoles
nnrpi2 - AC Mains Relay & CAEN HV |
Fri Jan 25 09:54:12 2019, CA, TD, NH, VP, 25th January 2019 8x
|
09.30: AIDA still running, not writing to file
Still running ok
No water leaks
|
Thu Jan 24 17:16:32 2019, CA, TD, NH, VP, MACB time switch settings 
|
AIDA@DESPEC MACB time switch settings before and after WR are as follows.
Attachment 1 - MACB 1-4 from left to right
|
Thu Jan 24 14:53:26 2019, TD, Analyses GSIJan19/R2_0 - R4_0   
|
Attachment 1 - summary analysis R2_0
|
Thu Jan 24 13:29:40 2019, TD, Analysis of GSIJan19/R1_0   
|
Analysis of file GSIJan19/R1_0 (white rabbit data)
|
Thu Jan 24 10:26:09 2019, VP, TD, CA, NH, Start up Merger
|
1) Click on item "Merger MK2" in top panel
This kills any existing Merger existence and loads a new copy.
|
Thu Jan 24 10:21:26 2019, CA, TD, NH, VP, January 24th 2019 7x
|
10.30 AIDA setup and DAQ start complete
writing to file TapeData/NULL/R1
|
Wed Jan 23 17:03:08 2019, CA, TD, NH, VP, January 23rd 2019 6x
|
Post White Rabbit update
Attachment 1 - 1.8.W pulser waveform spectra for all FEE64
|
Wed Jan 23 09:25:55 2019, CA, TD, NH, VP, MACB and setup pics 23.01.19 11x
|
Pictures of leaking cooling pipe
MACB switch settings
|
Wed Jan 23 08:12:01 2019, CA, TD, NH, VP, January 22nd 2019   
|
Attachment 1 - 1.8.W waveform spectra with pulser signal
Attachment 2 - 1.8.L pulser peak spectra
|
Mon Dec 10 11:09:53 2018, CA, TD, Scintillator pictures/system checks for 07.12.18 14x
|
11.12 System wide checks ok (attachment 1)
FEE temperatures ok (attachment 2)
bias/leakage currents ok (attachment 3)
|
Sat Dec 8 15:22:52 2018, TD, Raspberry Pi startup
|
nnrpi1 - FEE64 system consoles
nnrpi2 - USB-controlled ac mains relay, CAEN N1419ET
|
Thu Dec 6 20:45:47 2018, TD, Analysis of R2_0 
|
Analysis of data file R2_0
|
Thu Dec 6 15:31:40 2018, TD, CA, NH, December 6th 2018 11x
|
15.32 1.8.W spectra for aida01, aida09, aida10, aida11, aida12 (attachments 1, 2, 3)
2 and 3 expanded in Y and X direction respectively
|
Sat Dec 1 16:43:47 2018, TD, Analysis of WRTest28Nov18.dat  
|
Attachment 1 - analyser.f
|
Sat Oct 13 17:26:53 2018, TD, Analysis of 3 October 2018 T4 tests 7x
|
| |
Thu Sep 20 09:39:17 2018, TD, AIDA downstream window
|
The AIDA downstream window ('endcap' of snout) consists of 2x 50um aluminized mylar sheets |
Thu Sep 20 09:16:31 2018, TD, Images of AIDA setup for DESPEC 9x
|
Attachment 1 - detail of MSL type BB18(DS)-1000 p+n junction side strips, bias ring, multiple guard rings, filed
plates and bond wires
|
Thu Sep 20 08:57:48 2018, OH, Thursday 20th September   
|
09:57 Alpha run stoppped R2_0 -> R2_2
Thresholds dropped from 0x64 to 0xa
|
Wed Sep 19 12:40:41 2018, OH, TD, Single DSSD Installation and Tests 21x
|
On the 18th of September we installed DSSD 3208-14
Was found to have problems including exponential leakage behavior
|