|
ID |
Date |
Author |
Subject |
|
26
|
Sun Feb 3 16:01:49 2019 |
TD | Updated analyses GSIJan19/R1_0 - R10_0 |
Summary statistics for WR test data files R1_0, R2_0, R3_0, R4_0, R7_0 and R10_0 (attachments 1-6)
Latest version of WR TDR data analyser (attachment 7) |
|
25
|
Fri Jan 25 12:33:03 2019 |
NH | aida-gsi Access | If you have a GSI account it should be possible to connect to aida-gsi remotely via the following
SSH into lx-pool.gsi.de with GSI Linux username/password (ssh username@lx-pool.gsi.de)
Then SSH into aida-gsi via ssh npg@aida-3 |
|
24
|
Fri Jan 25 12:26:17 2019 |
NH | Raspberry Pi Startup & Information | Two raspberry pis:
nnrpi1 - FEE64 system consoles
nnrpi2 - AC Mains Relay & CAEN HV
Startup:
1. Plug in micro-USB on pis
2. Connect via ssh: ssh pi@nnrpi1 or ssh pi@nnrpi2
3. Start MIDAS:
cd /MIDAS/TclHttpd/Linux-arm
./TclHttpd-server
4. Connect from aida-gsi web browser
http://nnrpi2:8015 - For AC Relay Control
http://nnrpi1:8015 - For Pi Monitoring (Get list of USB terminals, Connect)
-> Parse USB log for details to check if all FEEs have finished booting completely or not
5. For CAEN HV connect via ssh/X (ssh -X pi@nnrpi2) and run
putty &
Opens putty window to connect to the CAEN HV module (Serial /dev/ttyACM0) |
|
23
|
Fri Jan 25 09:54:12 2019 |
CA, TD, NH, VP | 25th January 2019 | 09.30: AIDA still running, not writing to file
Still running ok
No water leaks
09.45: FEE64 temperatures ok (attachment 1)
Good event statistics ok (attachment 2)
10.00: Results of System Wide Checks
ADC Calibration check (attachment 3)
Clock Status (attachment 4)
Sync error counter (attachment 5)
White Rabbit Decoder status (attachment 7)
Memory Information (attachment 8)
10.30: Clock ReSync performed (attachment 6)
Start writing to file TapeData/NULL/R7_0
11.50: DAQ stopped, TapeServer stopped
TapeServer restarted, DAQ restarted
Writing to file TapeData/NULL/R9_0 with Clock ReSync at start.
Wasn't writing to disk, restarting (DAQ stop, TapeServer stop, TapeServer start TO DISK, DAQ Start)
Writing to file TapeData/NULL/R10_0
12.04: DAQ stopped, TapeServer stopped, merger stopped
FEE64 power relay switched off
Raspberry PIs switched off and disconnected
water cooler stopped
Mains IEC cables removed from relay
|
|
22
|
Thu Jan 24 17:16:32 2019 |
CA, TD, NH, VP | MACB time switch settings | AIDA@DESPEC MACB time switch settings before and after WR are as follows.
Attachment 1 - MACB 1-4 from left to right
MACB number: 1 2 3 4
100MHZ clock setting (before WR): 0 2 2 2
White Rabbit setting (after WR): 3 3 3 3 |
|
21
|
Thu Jan 24 14:53:26 2019 |
TD | Analyses GSIJan19/R2_0 - R4_0 |
Attachment 1 - summary analysis R2_0
increased slow comparator & LEC/MEC fast comparators cf. R1_0 to minimise random noise
Attachment 2 - summary analysis R3_0
per R2_0 but BNC PB-5 pulser frequency increased from c. 2Hz to c. 1kHz
pulser to *all* channels 12x FEE64s
Attachment 3 - summary analysis R4_0
open TapeSever file, DAQ GO, Start ASIC Readout (*correct* DAQ start sequence)
Observations
- some RESUME but *zero* PAUSE data items observed
- information types 4 & 5 not equal for R2_0 and almost, but not quite, equal for R3_0 & R4_0
- information types 4 & 5 start data file with 'correct' DAQ start sequence
|
|
20
|
Thu Jan 24 13:29:40 2019 |
TD | Analysis of GSIJan19/R1_0 |
Analysis of file GSIJan19/R1_0 (white rabbit data)
attachment 1 - overall statistics
attachment 2 - verbose output listing all data around first six identified timewarps
attachment 3 - analyser.f (old version for 48 bit timestamp)
attachment 4 - analyser.f (new version for 64 bit WR timestamp)
Observations
1) File does not commence with information type 4 & 5 data items
DAQ/TapeServer start sequence issue??
2) DAQ RESUMEs observed for all FEE64s - DAQ PAUSEs *not* observed
3) Number of information type 4 & 5 data items for each FEE64 *not* the same
4) reported idle & elapsed times incorrect - presumably analyser.f bug
|
|
19
|
Thu Jan 24 10:26:09 2019 |
VP, TD, CA, NH | Start up Merger | 1) Click on item "Merger MK2" in top panel
This kills any existing Merger existence and loads a new copy.
2) Start (if needed) browser conection to localhost:8115.
3) Click on "NewMerger Control"
4) In NewMerger Control, click "Reload"
5) If MergerState = IDLE, click "SETUP".
6) Wait until state = STOPed
7) If links shown are correct, click "GO"
8) Wait until popup about "Resume Merger" appears and click OK
9) when writing to disk, click "Forward Output to Data" |
|
18
|
Thu Jan 24 10:21:26 2019 |
CA, TD, NH, VP | January 24th 2019 | 10.30 AIDA setup and DAQ start complete
writing to file TapeData/NULL/R1
FEE64 Temperatures and Good event statistics ok (attachments 1 and 2)
11.00 results of analyser - shows significant number of timewarps in aida07, and a few in aida01-04
11.24 compared timestamps between mbs and AIDA, agree to 8 digits (attachment 3)
12.49 DAQ and Merger stopped and restarted
Raised slow comparator threshold from 0xa to 0x64
Raised fast comparator threshold (LEC/MEC) from 0xf to 0xff
12.51 Good event statistics: aida08 running at a normal rate
pulser peak (1.8.L) no longer has noise shoulder (attachment 4)
writing to file TapeData/NULL/R2
13.58 stopped writing to file. Pulser frequency increased to 1 kHz
writing to file TapeData/NULL/R3
15.00 file R4 - DAQ startup
17.58 trimmed and re-crimped ground wire on aida08
lowered pulser freq back to 50Hz
reduced slow comparator threshold to 0xa, fast comparator threshold (LEC) to 0xf
good event stats ok, aida08 no longer running hot (attachment 6)
1.8.L and 1.8.W spectra of aida08 (attachment 5)
pulser peak width now at 55.71
FEE64 temperatures ok (attachment 7) |
|
17
|
Wed Jan 23 17:03:08 2019 |
CA, TD, NH, VP | January 23rd 2019 | Post White Rabbit update
Attachment 1 - 1.8.W pulser waveform spectra for all FEE64
- pulser signals observed in all FEE64
Attachment 2 - good event statistics - aida08 has significant noise
Attachment 3 - FEE64 temperatures - all ok, but firmware version not displayed
Attachment 4 - 1.8.L pulser peak spectra
- widths:
aida01 - 23.66
aida02 - 19.76
aida03 - 20.43
aida04 - 18.82
aida05 - 20.05
aida06 - 41.04
aida07 - 21.24
aida08 - 205.02 (noisy FEE64)
aida09 - 24.81
aida10 - 22.85
aida11 - 13.98
aida12 - 19.90
Attachment 5 - New Merger statistics
Attachment 6 - Raw data stream |
|
16
|
Wed Jan 23 09:25:55 2019 |
CA, TD, NH, VP | MACB and setup pics 23.01.19 | Pictures of leaking cooling pipe
MACB switch settings
AIDA mount - needs rotated
Attachment 11 - AIDA@DESPEC MACB settings - 100MHz and WR |
|
15
|
Wed Jan 23 08:12:01 2019 |
CA, TD, NH, VP | January 22nd 2019 | Attachment 1 - 1.8.W waveform spectra with pulser signal
Attachment 2 - 1.8.L pulser peak spectra
widths: aida01 - 16.06
aida04 - 20.68
aida05 - 14.03
aida08 - 73.02
aida09 - 669.29
aida11 - 405.35
aida12 - 397.6
Attachment 3 - good event statistics
fast comparator threshold (LEC) at 0xff
FEEs 8,9,11,12 running hot
Attachment 4 - FEE64 temperatures - all ok
System wide checks ok, except aida02 fails ADC calibration
Leak found in seal on cooling pipe, switched power off |
|
14
|
Mon Dec 10 11:09:53 2018 |
CA, TD | Scintillator pictures/system checks for 07.12.18 | 11.12 System wide checks ok (attachment 1)
FEE temperatures ok (attachment 2)
bias/leakage currents ok (attachment 3)
11.13 1.8.W spectra for naida 1,9,10,11,12 (attachment 4)
1.8.W spectra expanded in Y direction (attachment 5)
pulser peaks (attachment 6)
11.20 pulser peak widths:
Aida10 -> 98.82
Aida09 -> 109.17
Aida11 -> 71.72
Aida12 -> 92.82
Aida01 -> 24.05
11.23 hit rates (attachment 7)
11.41 pictures of setup with scintillator mounted (attachment 8-14) |
|
13
|
Sat Dec 8 15:22:52 2018 |
TD | Raspberry Pi startup | nnrpi1 - FEE64 system consoles
nnrpi2 - USB-controlled ac mains relay, CAEN N1419ET
username: pi
password: *******
To startup TclHttpd server for web access via port 8015 execute
/MIDAS/TclHttpd/Linux-arm/TclHttpd-server
Update - 9 March 2020 command line should be
/MIDAS/TclHttpd/linux-arm/TclHttpd-server |
|
12
|
Thu Dec 6 20:45:47 2018 |
TD | Analysis of R2_0 |
Analysis of data file R2_0
Attachment 1 - summary output of TDR analyser
Attachment 2 - verbose output of TDR analyser |
|
11
|
Thu Dec 6 15:31:40 2018 |
TD, CA, NH | December 6th 2018 | 15.32 1.8.W spectra for aida01, aida09, aida10, aida11, aida12 (attachments 1, 2, 3)
2 and 3 expanded in Y and X direction respectively
15.35 good event statistics (attachment 4)
FEE temperatures (attachment 5)
leakage currents/bias (attachment 6)
17.20 attachment 7 - loose ground wire
attachment 8,9,10 - pictures of wire connections
attachment 11 - side on view of dsssd mounted in aida snout
17.28 Pulser widths:
aida10 -> 101.24
aida09 -> 136.22
aida11 -> 66.31
aida12 -> 87.17
aida01 -> 15.29 |
|
10
|
Sat Dec 1 16:43:47 2018 |
TD | Analysis of WRTest28Nov18.dat |
Attachment 1 - analyser.f
Modified version of TDR format analyser program to handle 64 bit WR timestamps
Attachment 2 - analyser program output
12092 blocks = 773888kb
8 timewarps
0 information code 5 data items
data file does not commence with either information codes 5 or 4
times/rates not correctly calculated - program assumes 10ns/tick
Attachment 3 - od -x output |
|
9
|
Sat Oct 13 17:26:53 2018 |
TD | Analysis of 3 October 2018 T4 tests | |
|
8
|
Thu Sep 20 09:39:17 2018 |
TD | AIDA downstream window |
The AIDA downstream window ('endcap' of snout) consists of 2x 50um aluminized mylar sheets |
|
7
|
Thu Sep 20 09:16:31 2018 |
TD | Images of AIDA setup for DESPEC | Attachment 1 - detail of MSL type BB18(DS)-1000 p+n junction side strips, bias ring, multiple guard rings, filed
plates and bond wires
Attachment 2 - MSL type BB18(DS)-1000 with Kapton PCBs attached
Attachment 3 - MSL type BB18(DS)-1000 with Kapton PCBs + 3M 1245 copper foil-screened Samtec FTSH ribbon cables
attached
Attachment 4 - AIDA snout installed (with 1x DSSSD) with cabling to 4x FEE64s in AIDA support assembly
Attachment 5 - AIDA + FATIMA array
Attachment 6 - AIDA FEE64 PSUs, network switch, USB-controlled ac mains relay
Attachment 7 - AIDA MACBs, pulser, detector bias
Attachment 8 - FATIMA DAQ
Attachment 9 - DESPEC 19" racks on detector platform |
|