AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DTAS, Page 6 of 8  ELOG logo
Entry  Mon May 27 07:18:26 2019, A. Algora, AIDA Plastik 
Entry  Mon May 27 07:34:58 2019, A. Algora, HV status 
Entry  Mon May 27 08:26:20 2019, A. Algora, Co source on top of Aida 201905271703_60Co_AIDA_in.root
Entry  Mon May 27 09:12:22 2019, A. Algora, Background, with AIDA Screenshot_from_2019-05-27_17-50-45.pngScreenshot_from_2019-05-27_17-51-02.png201905271803_background_AIDA_in.root
Entry  Mon May 27 12:54:48 2019, A. Algora, Reference detector Screenshot_from_2019-05-27_20-54-21.png
Entry  Mon May 27 13:50:54 2019, A. Algora, preparation directory moved 
Entry  Mon May 27 13:58:03 2019, A. Algora, Background, no lmd, AIDA in, no sources around 201905281315_background_AIDA_in.root
Entry  Tue May 28 05:30:03 2019, A. Algora, Reference detector threshold changed Screenshot_from_2019-05-28_13-29-46.png
Entry  Tue May 28 05:43:41 2019, A. Algora, 133Ba source. (IR052 from the third floor) 
Entry  Tue May 28 06:13:27 2019, A. Algora, Background, Aida in 
Entry  Tue May 28 07:49:51 2019, A. Algora, Background, no lmd 
Entry  Wed May 29 02:07:20 2019, A. Algora, Irradiation for 24Na 
Entry  Wed May 29 07:04:19 2019, A. Algora, F11 plastic connected 
Entry  Wed May 29 08:29:26 2019, A. Algora, latest conf file 20190528_Conf.xlsx
Entry  Wed May 29 09:08:11 2019, A. Algora, AIDA plastic setting changed 
Entry  Wed May 29 09:49:25 2019, A. Algora, New configuration file 20190529_Conf.xlsx
Entry  Wed May 29 10:01:10 2019, A. Algora, Background, no lmd, AIDA in 201905291833_background_AIDA_in.root201905300953_background_AIDA_in.root
Entry  Thu May 30 02:03:33 2019, A. Algora, Ref detector position changed, AIDA plastik HV changed 20190530_Conf.xlsx
Entry  Thu May 30 02:44:56 2019, A. Algora, Background, just a test 20190530_Conf.xlsx
Entry  Thu May 30 06:41:18 2019, A. Algora, Background with the beam 
ELOG V3.1.4-unknown