AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 1 of 11  ELOG logo
ID Date Author Subject Text Attachments
  211   Tue Nov 20 16:06:09 2018 dkProjected Inventory of ISOLDE(To be confirmed / finalized)

==Rack Electronics==
  
  210   Tue Nov 20 14:07:37 2018 dkBlue Loan Book ScanScan is attached, including all items denoted
in the loan book as being taken to ISOLDE.
 loan-book-scan.pdf 
  209   Mon Nov 12 11:25:58 2018 CBHExpected Proton Energy Plots Attached are the plots from MC simulations
of the energies the detected particles are
to have, with the top plot showing the dE-E
 ti_6.00um_2.8MeVu.pngti_3um_1.88MeVu.pngal_12.5_2.8MeVu.pngMargerin2014elog.png 
  208   Sat Nov 10 18:48:04 2018 dkTravel schedule spreadsheethttps://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0

or
  
  206   Thu Nov 8 10:01:32 2018 CBH, DKNew Struts InstallationStruts arrived and were installed on Wednesday. The
holes on one side of each of the struts to
connect the wheels to were slightly too wide
 8x 
  205   Wed Nov 7 14:27:45 2018 CBH, DKBeam Plan for Miguel and Alberto (ISOLDE beam operators)




Presently,
we are scheduled for 9 days: 
  Nov 26-28
are three (3) days nominally for beam development
  
  204   Mon Nov 5 16:26:34 2018 DK, CBHDraft run planPlease see https://elog.ph.ed.ac.uk/ISOLDE/203
for the E_cm calculations.
  
  203   Mon Nov 5 13:52:46 2018 CBHCoM energies for 44Ti(alpha,p) reaction for different entrance windows and beam energiesAssuming 200 Torr helium target., elastic
and reaction peaks do not have signifcant
overlap unless stated:
  
  202   Fri Nov 2 17:01:16 2018 DKInventory going to CERN by easyJetConor will take:

==Black clicker case==
  
  201   Wed Oct 31 16:01:33 2018 DKMeasuring foil thicknessA couple scans from my notes which may be
useful.
 DOC_(4).PDFDOC_(5).PDF 
  200   Wed Oct 31 14:50:36 2018 DKStrut shipping infohttp://www.dhl.com/en/express/tracking.html?AWB=1647723055&brand=DHL   
  199   Thu Oct 25 13:25:16 2018 KGCurrent gas cell status(Wrapped up)

    Cell b : 15um Al exit, 12.5um Al entrance. 
  
  198   Wed Oct 10 10:57:33 2018 DKChamber wheel bolt spacingFrom Ruchi's friend Rob.  WhatsApp_Image_2018-10-10_at_09.14.43.jpeg 
  197   Tue Oct 9 14:25:54 2018 DKAu foil request to STFChttp://npg.dl.ac.uk/TargetRequests/

https://www.technologysi.stfc.ac.uk/Pages/Target-frames.aspx
 NPG_-_Online_Target_Request.pdf 
  196   Tue Oct 9 10:40:13 2018 DKTo-do Meeting Notes: July, August, September, OctoberEach month's notes are attached.  Unfinished
business naturally carries over to the next
month.
 6x 
  195   Mon Oct 8 17:02:47 2018 DKTarget ladder photo from previous experimentFrom Alex, attached.  IMG_1274.jpg 
  194   Mon Oct 8 12:07:18 2018 DKGas cell check with He snifferNotes from an email:

Tested the chamber with the leak checker.
  
  193   Mon Oct 8 12:05:25 2018 DK, PBGas cell supportsThese are used to connect the gas cell to
the target ladder.  We only had the one,
and it would be more convenient if each gas
 gas_cell_support.PDF 
  192   Thu Oct 4 13:07:33 2018 KGSchematics for gas-cell testsin_atmosphere.png : schematic for testing
gas-cell in atmosphere
 in_atmosphere.pngFeedthrough.png 
  191   Thu Sep 27 12:41:06 2018 DKStrut measurement requestFor posterity

==========
 edinburgh-chamber-query.pdf 
ELOG V3.1.4-unknown