Sun Feb 19 12:22:16 2017, td, md, Vacuum and detector test
|
------17.2.17 ------------------------------------------------------
closing chamber
|
Thu Sep 14 14:07:21 2017, pb, alignment
|
Chat with survey team
1. mauf plugs for both ends of chamber with concentric 8mmH7 holes, with nylon tipped grub screws/clamp bars
2. Manuf of target with 8mmH7 hole |
Thu Sep 14 09:47:02 2017, dk, discussion with beam operators
|
CERN side
Faraday cup at the end of SEC, ideally with automated control to insert and remove
|
Mon Sep 25 14:50:46 2017, dk, To do list before main exp. - update from meeting 28th September
|
NB: This list may be incomplete!
CERN side:
|
Thu Sep 28 03:34:20 2017, dk, heavy ion degrader foil
|
--text from email--
Using Claudia's code, I added a layer of Al foil before the heavy ion
|
Thu Sep 28 03:38:18 2017, dk, heavy ion degrader foil - updated 8x
|
--original email text--
Using Claudia's code, I added a layer of Al foil before the heavy ion
silicon detector. The attached plots correspond to the heavy ion
|
Wed Oct 4 18:57:16 2017, dk, Digitized run notes from tests at CERN
|
Transcription of paper logbook for runs. Please check as I cannot read all the writing.
Wednesday 13/9/2017
|
Sat Nov 10 18:48:04 2018, dk, Travel schedule spreadsheet
|
https://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0
or
|
Tue Nov 20 14:07:37 2018, dk, Blue Loan Book Scan
|
Scan is attached, including all items denoted in the loan book as being taken to ISOLDE.
This will be useful for a complete compilation of our inventory. |
Tue Nov 20 16:06:09 2018, dk, Projected Inventory of ISOLDE
|
(To be confirmed / finalized)
==Rack Electronics==
|
Thu Oct 19 14:41:19 2017, daid, heavy ion degrader foil - full / new 8x
|
See entry https://elog.ph.ed.ac.uk/ISOLDE/28 for a full description, but editing the same elog is altering attachment numbers etc.
Here I've added 20 um foil as well as 5.3 MeV/u (~313 MeV) 59Cu beam.
|
Sat Nov 4 14:10:20 2017, daid, Julabo chiller operation
|
This log entry contains a basic instruction on how to operate the Julabo liquid flow chiller.
There are 5 buttons (left to right): Up/Down, Enter, 1/0.
|
Wed Nov 8 22:00:00 2017, daid, Scalars
|
Present scalars:
0: Ungated
1: Gated
|
Sat Nov 11 20:27:28 2017, TD, DK, RG, MB, Run 100
|
Header: Continue CH2 at 4.0 MeV/u
Ender:
====================================================
|
Sat Nov 11 18:06:42 2017, TD, DK, Run 98
|
Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: ends OK
====================================================
|
Sat Nov 11 18:31:10 2017, TD, DK, Run 99
|
Header: 4.0MeV/u 59Cu20+ + (CH2)n, Laser #2 *on*
Ender: Normal run stop
====================================================
|
Fri Sep 8 19:03:23 2017, TD, w26 network configuration 12x
|
Network configuration files for workstation w26 (Sun Ultra 45)
|
Fri Sep 8 19:12:19 2017, TD, MIDAS DAQ configuration 7x
|
MIDAS DAQ configuration files from directories w26:/MIDAS/experiments/daq
and w26:/MIDAS/TapeServer/SunOS |
Thu Sep 14 15:40:42 2017, TD, MSL type S2 bias data
|
|
Sat Nov 4 06:29:03 2017, TD, MIDASsort online sort programs, spectrum titles, calibration s/w & READMEs  
|
|