AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 1 of 11  ELOG logo
Entry  Sun Feb 19 12:22:16 2017, td, md, Vacuum and detector test 
------17.2.17 ------------------------------------------------------

closing chamber 
Entry  Thu Sep 14 14:07:21 2017, pb, alignment  2017.11.02_HISO_XT03_EdinburghChamber.pdf
Chat with survey team

1. mauf plugs for both ends of chamber with concentric 8mmH7 holes, with nylon tipped grub screws/clamp bars

2. Manuf of target with 8mmH7 hole
Entry  Thu Sep 14 09:47:02 2017, dk, discussion with beam operators 
CERN side
     Faraday cup at the end of SEC, ideally with automated control to insert and remove
Entry  Mon Sep 25 14:50:46 2017, dk, To do list before main exp. - update from meeting 28th September 
NB: This list may be incomplete!

CERN side: 
Entry  Thu Sep 28 03:34:20 2017, dk, heavy ion degrader foil degrader.pdf

--text from email--
Using Claudia's code, I added a layer of Al foil before the heavy ion
Entry  Thu Sep 28 03:38:18 2017, dk, heavy ion degrader foil - updated 8x
--original email text--
Using Claudia's code, I added a layer of Al foil before the heavy ion
silicon detector.  The attached plots correspond to the heavy ion
Entry  Wed Oct 4 18:57:16 2017, dk, Digitized run notes from tests at CERN 
Transcription of paper logbook for runs.  Please check as I cannot read all the writing.

Wednesday 13/9/2017
Entry  Sat Nov 10 18:48:04 2018, dk, Travel schedule spreadsheet 
https://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0

or
Entry  Tue Nov 20 14:07:37 2018, dk, Blue Loan Book Scan loan-book-scan.pdf
Scan is attached, including all items denoted in the loan book as being taken to ISOLDE.

This will be useful for a complete compilation of our inventory.
Entry  Tue Nov 20 16:06:09 2018, dk, Projected Inventory of ISOLDE 
(To be confirmed / finalized)

==Rack Electronics==
Entry  Thu Oct 19 14:41:19 2017, daid, heavy ion degrader foil - full / new 8x
See entry https://elog.ph.ed.ac.uk/ISOLDE/28 for a full description, but editing the same elog is altering attachment numbers etc.

Here I've added 20 um foil as well as 5.3 MeV/u (~313 MeV) 59Cu beam.
Entry  Sat Nov 4 14:10:20 2017, daid, Julabo chiller operation 
This log entry contains a basic instruction on how to operate the Julabo liquid flow chiller.

There are 5 buttons (left to right): Up/Down, Enter, 1/0.  
Entry  Wed Nov 8 22:00:00 2017, daid, Scalars 
Present scalars:
0: Ungated
1: Gated
Entry  Sat Nov 11 20:27:28 2017, TD, DK, RG, MB, Run 100 
Header: Continue CH2 at 4.0 MeV/u
Ender: 
====================================================
Entry  Sat Nov 11 18:06:42 2017, TD, DK, Run 98 
Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: ends OK
====================================================
Entry  Sat Nov 11 18:31:10 2017, TD, DK, Run 99 
Header: 4.0MeV/u 59Cu20+ + (CH2)n, Laser #2 *on*
Ender: Normal run stop
====================================================
Entry  Fri Sep 8 19:03:23 2017, TD, w26 network configuration 12x

Network configuration files for workstation w26 (Sun Ultra 45)
Entry  Fri Sep 8 19:12:19 2017, TD, MIDAS DAQ configuration 7x

MIDAS DAQ configuration files from directories w26:/MIDAS/experiments/daq
and w26:/MIDAS/TapeServer/SunOS
Entry  Thu Sep 14 15:40:42 2017, TD, MSL type S2 bias data MSLtypeS2.txt
 
Entry  Sat Nov 4 06:29:03 2017, TD, MIDASsort online sort programs, spectrum titles, calibration s/w & READMEs IS607.tar.gzCalibration.tar.gzREADMEs.tar.gz
 
ELOG V3.1.4-unknown