Entry  Tue Nov 20 16:06:09 2018, dk, Projected Inventory of ISOLDE 
(To be confirmed / finalized)

==Rack Electronics==
Entry  Tue Nov 20 14:07:37 2018, dk, Blue Loan Book Scan loan-book-scan.pdf
Scan is attached, including all items denoted in the loan book as being taken to ISOLDE.

This will be useful for a complete compilation of our inventory.
Entry  Mon Nov 12 11:25:58 2018, CBH, Expected Proton Energy Plots  ti_6.00um_2.8MeVu.pngti_3um_1.88MeVu.pngal_12.5_2.8MeVu.pngMargerin2014elog.png
Attached are the plots from MC simulations of the energies the detected particles are to have, with the top plot showing the dE-E plot and the bottom
plot showing the total energy of the particles.

Please note the height of the peaks is not indicative of the counts expected and there is a low proton background expected between the entrance
Entry  Sat Nov 10 18:48:04 2018, dk, Travel schedule spreadsheet 
https://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0

or
Entry  Thu Nov 8 10:01:32 2018, CBH, DK, New Struts Installation 8x
Struts arrived and were installed on Wednesday. The holes on one side of each of the struts to connect the wheels to were slightly too wide (11.5
cm vs 10.5 cm).
We've taken away part of the wheel holders and now they seem to be fitting in.
Entry  Wed Nov 7 14:27:45 2018, CBH, DK, Beam Plan for Miguel and Alberto (ISOLDE beam operators) 





Presently, we are scheduled for 9 days: 
  Nov 26-28
are three (3) days nominally for beam development
  Nov 29-Dec 4 are six (6) days nominally for physics data taking
  Dec 5-6: Shutdowns and important
tests are planned by ISOLDE team
  Dec 7th - power gets shut off to ISOLDE

==Run Plan==
1 day for ion source and 2.8 MeV/u beam dev
1 day for High
Entry  Mon Nov 5 16:26:34 2018, DK, CBH, Draft run plan 
Please see https://elog.ph.ed.ac.uk/ISOLDE/203 for the E_cm calculations.

Presently, we are scheduled for 9 days: 
Entry  Mon Nov 5 13:52:46 2018, CBH, CoM energies for 44Ti(alpha,p) reaction for different entrance windows and beam energies 
Assuming 200 Torr helium target., elastic and reaction peaks do not have signifcant overlap unless stated:

3um Ti, 1.88 MeV/u beam: Ecm=4.27-4.58 MeV

3um Ti, 2.2 MeV/u beam: Ecm=5.50-5.80 MeV
Entry  Fri Nov 2 17:01:16 2018, DK, Inventory going to CERN by easyJet 
Conor will take:

==Black clicker case==
Entry  Wed Oct 31 16:01:33 2018, DK, Measuring foil thickness DOC_(4).PDFDOC_(5).PDF
A couple scans from my notes which may be useful.

One discusses alpha energy loss in nominal kitchen foil (~12 um) and also introduces my technique to calibrate a thin (~20 um) SSD.  Sorry I forget which
Entry  Wed Oct 31 14:50:36 2018, DK, Strut shipping info 
http://www.dhl.com/en/express/tracking.html?AWB=1647723055&brand=DHL
Entry  Thu Oct 25 13:25:16 2018, KG, Current gas cell status 
(Wrapped up)

    Cell b : 15um Al exit, 12.5um Al entrance.  L/R ~0.4Torr/hr overnight (in vacuum)
Entry  Wed Oct 10 10:57:33 2018, DK, Chamber wheel bolt spacing WhatsApp_Image_2018-10-10_at_09.14.43.jpeg
From Ruchi's friend Rob.
Entry  Tue Oct 9 14:25:54 2018, DK, Au foil request to STFC NPG_-_Online_Target_Request.pdf
http://npg.dl.ac.uk/TargetRequests/

https://www.technologysi.stfc.ac.uk/Pages/Target-frames.aspx
Entry  Tue Oct 9 10:40:13 2018, DK, To-do Meeting Notes: July, August, September, October 6x
Each month's notes are attached.  Unfinished business naturally carries over to the next month.

This elog will be updated with new notes as necessary.
Entry  Mon Oct 8 17:02:47 2018, DK, Target ladder photo from previous experiment IMG_1274.jpg
From Alex, attached.
Entry  Mon Oct 8 12:07:18 2018, DK, Gas cell check with He sniffer 
Notes from an email:

Tested the chamber with the leak checker.  We got 3.7 x 10^-6 mbar
Entry  Mon Oct 8 12:05:25 2018, DK, PB, Gas cell supports gas_cell_support.PDF
These are used to connect the gas cell to the target ladder.  We only had the one, and it would be more convenient if each gas cell has its own, to avoid
swapping them back and forth.
Entry  Thu Oct 4 13:07:33 2018, KG, Schematics for gas-cell tests in_atmosphere.pngFeedthrough.png
in_atmosphere.png : schematic for testing gas-cell in atmosphere

Feedthrough.png : feed through schematic for testing vacuum chamber and gas cell
Entry  Thu Sep 27 12:41:06 2018, DK, Strut measurement request edinburgh-chamber-query.pdf
For posterity

==========