ID |
Date |
Author |
Subject |
Text |
|
|
211
|
Tue Nov 20 16:06:09 2018 |
dk | Projected Inventory of ISOLDE | (To be confirmed / finalized)
==Rack Electronics==
|
|
|
210
|
Tue Nov 20 14:07:37 2018 |
dk | Blue Loan Book Scan | Scan is attached, including all items denoted
in the loan book as being taken to ISOLDE.
|
|
|
209
|
Mon Nov 12 11:25:58 2018 |
CBH | Expected Proton Energy Plots | Attached are the plots from MC simulations
of the energies the detected particles are
to have, with the top plot showing the dE-E |
|
|
208
|
Sat Nov 10 18:48:04 2018 |
dk | Travel schedule spreadsheet | https://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0
or
|
|
|
206
|
Thu Nov 8 10:01:32 2018 |
CBH, DK | New Struts Installation | Struts arrived and were installed on Wednesday. The
holes on one side of each of the struts to
connect the wheels to were slightly too wide |
8x |
|
205
|
Wed Nov 7 14:27:45 2018 |
CBH, DK | Beam Plan for Miguel and Alberto (ISOLDE beam operators) |
Presently,
we are scheduled for 9 days:
Nov 26-28
are three (3) days nominally for beam development
|
|
|
204
|
Mon Nov 5 16:26:34 2018 |
DK, CBH | Draft run plan | Please see https://elog.ph.ed.ac.uk/ISOLDE/203
for the E_cm calculations.
|
|
|
203
|
Mon Nov 5 13:52:46 2018 |
CBH | CoM energies for 44Ti(alpha,p) reaction for different entrance windows and beam energies | Assuming 200 Torr helium target., elastic
and reaction peaks do not have signifcant
overlap unless stated: |
|
|
202
|
Fri Nov 2 17:01:16 2018 |
DK | Inventory going to CERN by easyJet | Conor will take:
==Black clicker case==
|
|
|
201
|
Wed Oct 31 16:01:33 2018 |
DK | Measuring foil thickness | A couple scans from my notes which may be
useful.
|
|
|
200
|
Wed Oct 31 14:50:36 2018 |
DK | Strut shipping info | http://www.dhl.com/en/express/tracking.html?AWB=1647723055&brand=DHL |
|
|
199
|
Thu Oct 25 13:25:16 2018 |
KG | Current gas cell status | (Wrapped up)
Cell b : 15um Al exit, 12.5um Al entrance. |
|
|
198
|
Wed Oct 10 10:57:33 2018 |
DK | Chamber wheel bolt spacing | From Ruchi's friend Rob. |
|
|
197
|
Tue Oct 9 14:25:54 2018 |
DK | Au foil request to STFC | http://npg.dl.ac.uk/TargetRequests/
https://www.technologysi.stfc.ac.uk/Pages/Target-frames.aspx
|
|
|
196
|
Tue Oct 9 10:40:13 2018 |
DK | To-do Meeting Notes: July, August, September, October | Each month's notes are attached. Unfinished
business naturally carries over to the next
month.
|
6x |
|
195
|
Mon Oct 8 17:02:47 2018 |
DK | Target ladder photo from previous experiment | From Alex, attached. |
|
|
194
|
Mon Oct 8 12:07:18 2018 |
DK | Gas cell check with He sniffer | Notes from an email:
Tested the chamber with the leak checker. |
|
|
193
|
Mon Oct 8 12:05:25 2018 |
DK, PB | Gas cell supports | These are used to connect the gas cell to
the target ladder. We only had the one,
and it would be more convenient if each gas |
|
|
192
|
Thu Oct 4 13:07:33 2018 |
KG | Schematics for gas-cell tests | in_atmosphere.png : schematic for testing
gas-cell in atmosphere
|
|
|
191
|
Thu Sep 27 12:41:06 2018 |
DK | Strut measurement request | For posterity
==========
|
|