Sat Nov 11 00:01:41 2017, Daid. Mirco, Trigger and scalars for 4.0 MeV/u
|
Tom et al. tuned the trigger this evening, before we began the runs. (Run 82, or Run 83??)
===TRIGGER===
|
Sat Nov 10 18:48:04 2018, dk, Travel schedule spreadsheet
|
https://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0
or
|
Tue Oct 9 10:40:13 2018, DK, To-do Meeting Notes: July, August, September, October 6x
|
Each month's notes are attached. Unfinished business naturally carries over to the next month.
This elog will be updated with new notes as necessary.
|
Mon Sep 25 14:50:46 2017, dk, To do list before main exp. - update from meeting 28th September
|
NB: This list may be incomplete!
CERN side:
|
Wed Aug 16 12:53:43 2017, DK, To do / missing
|
Photodiode
Electronics
Foil mount (12 um Al seems okay, but check more carefully)
|
Thu Nov 9 07:15:49 2017, MD, Tips for Babysitting ISOLDE during shifts
|
from ISOLDE webpage |
Fri Jan 27 11:33:10 2017, DK, Testing email server
|
Tinkering with configs for SYMPA email server to see if the elog info is sent to the mailing list or not
Normally it is sent by ELog@jast.ph.ed.ac.uk and I changed it to "restricted to local domain and subscribers" from "restricted to subscribers" under Edit |
Thu Jun 1 13:09:38 2017, DK, Testing email header, part II
|
Checking some server settings for the elog system regarding the email notification.
And testing updating an elog.
|
Wed Apr 26 12:10:04 2017, DK, Testing email header
|
I asked IT about putting the elog name into the email subject line (useful for those of us subscribed to more than one elog). They said they enabled it
for ISOLDE. Let's test
to see!
|
Mon Oct 8 17:02:47 2018, DK, Target ladder photo from previous experiment
|
From Alex, attached. |
Tue Nov 7 14:38:25 2017, Ruchi Garg, Target ladder configuration
|
|
Thu Nov 9 12:15:33 2017, SL, TIMBER: Faraday Cup Measurements
|
Faraday Cup (at end of Edinburgh chamber) measurements recorded in TIMBER (from approx 10.00 9/11/17). |
Wed Oct 31 14:50:36 2018, DK, Strut shipping info
|
http://www.dhl.com/en/express/tracking.html?AWB=1647723055&brand=DHL |
Thu Sep 27 12:41:06 2018, DK, Strut measurement request
|
For posterity
==========
|
Thu Nov 9 06:30:35 2017, Daid, Mirco, Spectra (Shift 1) 12x
|
Screen shots for accumulated data before the target went down. Should be (at least) runs 53 & 54 inclusive, possibly back to the start of RI beam on CH2
target. |
Wed Aug 16 15:29:57 2017, DK, Shipping Inventory
|
==BOX A==
VME crate
26 ribbon cables
|
Wed Aug 16 15:30:04 2017, DK, MD, Shipping Inventory
|
==BOX A== 59kg - 600mm x 600mm x 800mm
VME crate, with power cable
|
Tue Apr 18 11:05:43 2017, Mirco / Claudia, Setup Preparation 
|
status of the setup - 07/04/2017
status of the setup - 21/04/2017 |
Tue Sep 19 14:54:47 2017, Claudia, Toby, Setup Photos 14x
|
|
Thu Oct 4 13:07:33 2018, KG, Schematics for gas-cell tests 
|
in_atmosphere.png : schematic for testing gas-cell in atmosphere
Feedthrough.png : feed through schematic for testing vacuum chamber and gas cell |