AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 2 of 11  ELOG logo
Entry  Sat Nov 11 00:01:41 2017, Daid. Mirco, Trigger and scalars for 4.0 MeV/u 
Tom et al. tuned the trigger this evening, before we began the runs.  (Run 82, or Run 83??)

===TRIGGER===
Entry  Sat Nov 10 18:48:04 2018, dk, Travel schedule spreadsheet 
https://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0

or
Entry  Tue Oct 9 10:40:13 2018, DK, To-do Meeting Notes: July, August, September, October 6x
Each month's notes are attached.  Unfinished business naturally carries over to the next month.

This elog will be updated with new notes as necessary.
Entry  Mon Sep 25 14:50:46 2017, dk, To do list before main exp. - update from meeting 28th September 
NB: This list may be incomplete!

CERN side: 
Entry  Wed Aug 16 12:53:43 2017, DK, To do / missing 
Photodiode
     Electronics
     Foil mount (12 um Al seems okay, but check more carefully)
Entry  Thu Nov 9 07:15:49 2017, MD, Tips for Babysitting ISOLDE during shifts Babysitting_ISOLDE_from_the_CCC.pdf
from ISOLDE webpage
Entry  Fri Jan 27 11:33:10 2017, DK, Testing email server 
Tinkering with configs for SYMPA email server to see if the elog info is sent to the mailing list or not

Normally it is sent by ELog@jast.ph.ed.ac.uk and I changed it to "restricted to local domain and subscribers" from "restricted to subscribers" under Edit
Entry  Thu Jun 1 13:09:38 2017, DK, Testing email header, part II 
Checking some server settings for the elog system regarding the email notification.

And testing updating an elog.
Entry  Wed Apr 26 12:10:04 2017, DK, Testing email header 
I asked IT about putting the elog name into the email subject line (useful for those of us subscribed to more than one elog).  They said they enabled it
for ISOLDE.  Let's test 
to see!
Entry  Mon Oct 8 17:02:47 2018, DK, Target ladder photo from previous experiment IMG_1274.jpg
From Alex, attached.
Entry  Tue Nov 7 14:38:25 2017, Ruchi Garg, Target ladder configuration TargetLadder.pdf
 
Entry  Thu Nov 9 12:15:33 2017, SL, TIMBER: Faraday Cup Measurements 
Faraday Cup (at end of Edinburgh chamber) measurements recorded in TIMBER (from approx 10.00 9/11/17).
Entry  Wed Oct 31 14:50:36 2018, DK, Strut shipping info 
http://www.dhl.com/en/express/tracking.html?AWB=1647723055&brand=DHL
Entry  Thu Sep 27 12:41:06 2018, DK, Strut measurement request edinburgh-chamber-query.pdf
For posterity

==========
Entry  Thu Nov 9 06:30:35 2017, Daid, Mirco, Spectra (Shift 1) 12x
Screen shots for accumulated data before the target went down.  Should be (at least) runs 53 & 54 inclusive, possibly back to the start of RI beam on CH2
target.
Entry  Wed Aug 16 15:29:57 2017, DK, Shipping Inventory 
==BOX A==
VME crate
26 ribbon cables
Entry  Wed Aug 16 15:30:04 2017, DK, MD, Shipping Inventory 
==BOX A==  59kg - 600mm x 600mm x 800mm

VME crate, with power cable
Entry  Tue Apr 18 11:05:43 2017, Mirco / Claudia, Setup Preparation ISOLDE_-_chamber_status070417.pdfISOLDE_-_chamber_status210417.pdf
status of the setup - 07/04/2017

status of the setup - 21/04/2017
Entry  Tue Sep 19 14:54:47 2017, Claudia, Toby, Setup Photos 14x
 
Entry  Thu Oct 4 13:07:33 2018, KG, Schematics for gas-cell tests in_atmosphere.pngFeedthrough.png
in_atmosphere.png : schematic for testing gas-cell in atmosphere

Feedthrough.png : feed through schematic for testing vacuum chamber and gas cell
ELOG V3.1.4-unknown