Entry  Wed Nov 15 07:39:26 2017, MD, DK, CLW, End of beamtime, modules reading before turning off 
Header: end of beamtime - modules reading
Ender: 
==================================================== 
Entry  Mon Nov 5 16:26:34 2018, DK, CBH, Draft run plan 
Please see https://elog.ph.ed.ac.uk/ISOLDE/203 for the E_cm calculations.

Presently, we are scheduled for 9 days: 
Entry  Wed Oct 4 18:57:16 2017, dk, Digitized run notes from tests at CERN 
Transcription of paper logbook for runs.  Please check as I cannot read all the writing.

Wednesday 13/9/2017
Entry  Thu Sep 14 08:37:27 2017, Claudia, Detector installation 8x
dE detector: 2083-9, 74 um thick, V_depletion=12V; V_operating=24 V

E detector:  3080-23, 1012 um thick, V_d=110; V_o=350 V

HI detector: 2410-23, 65 um; V_d=7 ; V_o=14 V
Entry  Thu Sep 14 10:24:34 2017, Claudia, Detector - ADC connection 
ADC#1 0-31: p+n dE

ADC#2 32-48: n+n dE

ADC#2 49-64: p+n dE
Entry  Thu Oct 25 13:25:16 2018, KG, Current gas cell status 
(Wrapped up)

    Cell b : 15um Al exit, 12.5um Al entrance.  L/R ~0.4Torr/hr overnight (in vacuum)
Entry  Mon Nov 5 13:52:46 2018, CBH, CoM energies for 44Ti(alpha,p) reaction for different entrance windows and beam energies 
Assuming 200 Torr helium target., elastic and reaction peaks do not have signifcant overlap unless stated:

3um Ti, 1.88 MeV/u beam: Ecm=4.27-4.58 MeV

3um Ti, 2.2 MeV/u beam: Ecm=5.50-5.80 MeV
Entry  Sun Nov 5 20:25:10 2017, Ruchi, Circuit diagram and cable mapping Cabling.pdfPreampsPCBs.pdfCircuit.pdf
 
Entry  Sat Nov 11 07:45:34 2017, Claudia, Checking Laser quality 
There is an option to see when the beam is gone if it is due to lasers or due to the accelerator.

- window next to proton requestion switch

- put middle faraday cup in
Entry  Wed Nov 8 23:46:32 2017, Daid, Charge State Distributions  charge-state-distribution-3.6.jpgcharge-state-distribution-4.0.jpgcharge-state-distribution-4.4.jpgcharge-state-distribution-4.7.jpgcharge-state-distribution-5.0.jpg
Faraday cup readout at the end of our chamber should change based on whether or not the target is in and also the 59Cu beam energy.

The effect could be as much as 10 to 20%.  At some point, we should check the Faraday cup reading with the CH2 target and with the empty target.
    Reply  Thu Nov 9 05:33:50 2017, TD, Charge State Distributions  
> Faraday cup readout at the end of our chamber should change based on whether or not the target is in and also the 59Cu 
beam energy.
Entry  Wed Oct 10 10:57:33 2018, DK, Chamber wheel bolt spacing WhatsApp_Image_2018-10-10_at_09.14.43.jpeg
From Ruchi's friend Rob.
Entry  Fri Nov 10 14:48:22 2017, TD, Calibration 18x

ADC offsets calculated using data files R42-r47
Entry  Fri Nov 10 08:31:06 2017, TD, CAEN V767 TDC trigger/channel 0 logic change 
Approximately 5-10% of events overnight were 'bad' i.e. missing TDC data

Checked the CAEN V767 trigger/channel 0 logic (without beam) this morning
Entry  Thu Nov 9 17:01:49 2017, TD, CAEN V560 Scalers added to datastream 
CAEN V560 Scaler channels #0-7 have been added to the EbyE datastream by adding
per event readout of defined VME registers identified as group 31, items 0-15
Entry  Tue Nov 20 14:07:37 2018, dk, Blue Loan Book Scan loan-book-scan.pdf
Scan is attached, including all items denoted in the loan book as being taken to ISOLDE.

This will be useful for a complete compilation of our inventory.
Entry  Wed Nov 8 22:21:35 2017, Ruchi, Beam transmission 
By the end of beam tuning (around 6pm), beam transmission between Faraday cups at the end of SEC and at end of Edinburgh chamber:
~100% through 10mm collimator (empty target frame)
> 50% thought 3mm collimator
Entry  Thu Nov 23 13:16:56 2017, CLW, Beam energies 
Beam energy measurements can be found in the electronic logbook for ISO-REX-HIE

https://op-webtools.web.cern.ch/elogbook/

measurements for all energies were:
Entry  Wed Nov 7 14:27:45 2018, CBH, DK, Beam Plan for Miguel and Alberto (ISOLDE beam operators) 





Presently, we are scheduled for 9 days: 
  Nov 26-28
are three (3) days nominally for beam development
  Nov 29-Dec 4 are six (6) days nominally for physics data taking
  Dec 5-6: Shutdowns and important
tests are planned by ISOLDE team
  Dec 7th - power gets shut off to ISOLDE

==Run Plan==
1 day for ion source and 2.8 MeV/u beam dev
1 day for High
Entry  Tue Oct 9 14:25:54 2018, DK, Au foil request to STFC NPG_-_Online_Target_Request.pdf
http://npg.dl.ac.uk/TargetRequests/

https://www.technologysi.stfc.ac.uk/Pages/Target-frames.aspx