Sat Nov 11 06:57:14 2017, MD, CLW, PJW, Run 89
|
Header: 3.99 MeV/u and CH2_30+25. Continue after Laser update (cleaning), but still no real beam
Ender:
|
Sat Nov 11 07:44:16 2017, MD, CLW, PJW, Run 90
|
Header: 3.99 MeV/u and CH2_30+25. Beam is back
Ender:
|
Fri Nov 10 07:00:14 2017, MD, CLW, ASM, TD, Run 80 
|
Header: 4.7 MeV/u and CH2_30+25.
Ender: beam stop at PS (6 hour interruption)
|
Sat Nov 11 00:24:19 2017, MD, ASM, DMK, Run 85
|
Header: 3.99 MeV/u and CH2_30+25.
Ender: primary target current (RED) down to 5V...
|
Fri Nov 10 02:12:06 2017, MD, ASM, DK, Run 77
|
Header: 4.7 MeV/u and C_09. continue after fixing IHS Cavity (part of normal conducting linac)
Ender:
|
Fri Nov 10 04:18:41 2017, MD, ASM, Run 78
|
Header: 4.7 MeV/u and Empty frame.
Ender:
====================================================
|
Fri Nov 10 04:53:34 2017, MD, ASM, Run 79
|
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
|
Sat Nov 11 03:58:58 2017, MD, ASM, Run 87
|
Header: 3.99 MeV/u and CH2_30+25.
Ender:
|
Wed May 24 15:21:37 2017, MD, Notes from visit of ISOLDE at 23rd May 2017
|
Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall) |
Wed May 24 16:09:10 2017, MD, Notes from visit of ISOLDE at 23rd May 2017 
|
Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall) |
Wed May 24 16:18:22 2017, MD, Notes from visit of ISOLDE at 23rd May 2017   
|
Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall) |
Thu Nov 9 07:15:49 2017, MD, Tips for Babysitting ISOLDE during shifts
|
| from ISOLDE webpage |
Thu Nov 9 23:10:38 2017, MD, preparation for Carbon C_09 (Run 75)
|
10/11/17: 00:03
switch target ladder to Pos #5: 82.44 mm
|
Mon Nov 13 10:01:39 2017, MB, CLW, SJL, PJW, Run 123 JUNK
|
| JUNK |
Mon Nov 13 10:10:52 2017, MB, CLW, SJL, PJW, Run 124
|
Header: CH2 #33+10+01, beam energy 3.6
Ender:
|
Mon Nov 13 12:10:18 2017, MB, CLW, SJL, Run 125
|
Header: CH2 #33+10+01, beam energy 3.6
Ender:
|
Mon Nov 13 14:25:20 2017, MB, CLW, SJL, Run 126
|
Header: CH2 #33+10+01, beam energy 3.6
Ender: no beam at the start, so start afresh with run with continuour beam (hopefully)
|
Mon Nov 13 15:06:09 2017, MB, CLW, SJL, Run 127
|
Header: CH2 #33+10+01, beam energy 3.6
Ender:
|
Mon Nov 13 07:23:23 2017, MB, CLW, Run 122
|
Header: CH2 #16, beam energy 4.4
Ender:
|
Sun Nov 12 17:44:49 2017, MB DK RG, run 111
|
Header: empty target, 4.4 MeV/u
Ender: End
====================================================
|