|
ID |
Date |
Author |
Subject |
Text |
 |
|
98
|
Sat Nov 11 06:57:14 2017 |
MD, CLW, PJW | Run 89 |
Header: 3.99 MeV/u and CH2_30+25. Continue
after Laser update (cleaning), but still |
|
|
99
|
Sat Nov 11 07:44:16 2017 |
MD, CLW, PJW | Run 90 |
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
|
|
|
83
|
Fri Nov 10 07:00:14 2017 |
MD, CLW, ASM, TD | Run 80 |
Header: 4.7 MeV/u and CH2_30+25.
Ender: beam stop at PS (6 hour interruption)
|
 |
|
93
|
Sat Nov 11 00:24:19 2017 |
MD, ASM, DMK | Run 85 |
Header: 3.99 MeV/u and CH2_30+25.
Ender: primary target current (RED) down |
|
|
80
|
Fri Nov 10 02:12:06 2017 |
MD, ASM, DK | Run 77 |
Header: 4.7 MeV/u and C_09. continue after
fixing IHS Cavity (part of normal conducting |
|
|
81
|
Fri Nov 10 04:18:41 2017 |
MD, ASM | Run 78 | Header: 4.7 MeV/u and Empty frame.
Ender:
====================================================
|
|
|
82
|
Fri Nov 10 04:53:34 2017 |
MD, ASM | Run 79 | Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
|
|
|
96
|
Sat Nov 11 03:58:58 2017 |
MD, ASM | Run 87 |
Header: 3.99 MeV/u and CH2_30+25.
Ender:
|
|
|
Draft
|
Wed May 24 15:21:37 2017 |
MD | Notes from visit of ISOLDE at 23rd May 2017 | Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will
be put in place in next two weeks. They are |
|
|
Draft
|
Wed May 24 16:09:10 2017 |
MD | Notes from visit of ISOLDE at 23rd May 2017 | Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will
be put in place in next two weeks. They are |
 |
|
9
|
Wed May 24 16:18:22 2017 |
MD | Notes from visit of ISOLDE at 23rd May 2017 | Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will
be put in place in next two weeks. They are |
   |
|
61
|
Thu Nov 9 07:15:49 2017 |
MD | Tips for Babysitting ISOLDE during shifts | from ISOLDE webpage |
|
|
78
|
Thu Nov 9 23:10:38 2017 |
MD | preparation for Carbon C_09 (Run 75) | 10/11/17: 00:03
switch target ladder to Pos #5: 82.44 mm
|
|
|
137
|
Mon Nov 13 10:01:39 2017 |
MB, CLW, SJL, PJW | Run 123 JUNK | JUNK |
|
|
138
|
Mon Nov 13 10:10:52 2017 |
MB, CLW, SJL, PJW | Run 124 |
Header: CH2 #33+10+01, beam energy 3.6
Ender:
|
|
|
139
|
Mon Nov 13 12:10:18 2017 |
MB, CLW, SJL | Run 125 |
Header: CH2 #33+10+01, beam energy 3.6
Ender:
|
|
|
140
|
Mon Nov 13 14:25:20 2017 |
MB, CLW, SJL | Run 126 |
Header: CH2 #33+10+01, beam energy 3.6
Ender: no beam at the start, so start afresh |
|
|
141
|
Mon Nov 13 15:06:09 2017 |
MB, CLW, SJL | Run 127 |
Header: CH2 #33+10+01, beam energy 3.6
Ender:
|
|
|
136
|
Mon Nov 13 07:23:23 2017 |
MB, CLW | Run 122 |
Header: CH2 #16, beam energy 4.4
Ender:
|
|
|
125
|
Sun Nov 12 17:44:49 2017 |
MB DK RG | run 111 | Header: empty target, 4.4 MeV/u
Ender: End
====================================================
|
|
|