  98   Sat Nov 11 06:57:14 2017 MD, CLW, PJWRun 89
Header: 3.99 MeV/u and CH2_30+25. Continue
after Laser update (cleaning), but still
 171111_0828_beamisback.jpg 
  99   Sat Nov 11 07:44:16 2017 MD, CLW, PJWRun 90
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
 171111_0858_Laser_optimizedcondition.jpg 
  83   Fri Nov 10 07:00:14 2017 MD, CLW, ASM, TDRun 80
Header: 4.7 MeV/u and CH2_30+25.
Ender: beam stop at PS (6 hour interruption)
 171110_only2of4cycles_problemRing2.jpg171110_0821_beamstop_6hours_nobeam.jpg 
  93   Sat Nov 11 00:24:19 2017 MD, ASM, DMKRun 85
Header: 3.99 MeV/u and CH2_30+25.
Ender: primary target current (RED) down
  
  80   Fri Nov 10 02:12:06 2017 MD, ASM, DKRun 77
Header: 4.7 MeV/u and C_09. continue after
fixing IHS Cavity (part of normal conducting
  
  81   Fri Nov 10 04:18:41 2017 MD, ASMRun 78Header: 4.7 MeV/u and Empty frame.
Ender: 
====================================================
  
  82   Fri Nov 10 04:53:34 2017 MD, ASMRun 79Header: 4.7 MeV/u and CH2_30+25.
Ender: 
====================================================
 171110_only2of4cycles_problemRing2.jpg 
  96   Sat Nov 11 03:58:58 2017 MD, ASMRun 87
Header: 3.99 MeV/u and CH2_30+25.
Ender: 
 171111_0638_beamcurrentdown.jpg 
  Draft   Wed May 24 15:21:37 2017 MDNotes from visit of ISOLDE at 23rd May 2017Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will
be put in place in next two weeks. They are
  
  Draft   Wed May 24 16:09:10 2017 MDNotes from visit of ISOLDE at 23rd May 2017Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will
be put in place in next two weeks. They are
 XT03_beamline_corner-panorama.jpgscattering_chamber-not_in_place.jpg 
  9   Wed May 24 16:18:22 2017 MDNotes from visit of ISOLDE at 23rd May 2017Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will
be put in place in next two weeks. They are
 XT03_beamline_corner-panorama.jpgscattering_chamber-not_in_place.jpgcorner-possible_offline_setup-1.jpgpower_supply_near_beam-1.jpg 
  61   Thu Nov 9 07:15:49 2017 MDTips for Babysitting ISOLDE during shiftsfrom ISOLDE webpage  Babysitting_ISOLDE_from_the_CCC.pdf 
  78   Thu Nov 9 23:10:38 2017 MDpreparation for Carbon C_09 (Run 75)10/11/17: 00:03

switch target ladder to Pos #5: 82.44 mm
  
  137   Mon Nov 13 10:01:39 2017 MB, CLW, SJL, PJWRun 123 JUNKJUNK   
  138   Mon Nov 13 10:10:52 2017 MB, CLW, SJL, PJWRun 124
Header: CH2 #33+10+01, beam energy 3.6
Ender: 
  
  139   Mon Nov 13 12:10:18 2017 MB, CLW, SJLRun 125
Header: CH2 #33+10+01, beam energy 3.6
Ender: 
  
  140   Mon Nov 13 14:25:20 2017 MB, CLW, SJLRun 126
Header: CH2 #33+10+01, beam energy 3.6
Ender: no beam at the start, so start afresh
  
  141   Mon Nov 13 15:06:09 2017 MB, CLW, SJLRun 127
Header: CH2 #33+10+01, beam energy 3.6
Ender: 
  
  136   Mon Nov 13 07:23:23 2017 MB, CLWRun 122
Header: CH2 #16, beam energy 4.4
Ender: 
  
  125   Sun Nov 12 17:44:49 2017 MB DK RGrun 111Header:  empty target, 4.4 MeV/u
Ender: End
====================================================
  