Mon Nov 13 19:09:53 2017, SL RG, Run 129
|
| Junk - double pressed stop acquisition |
Mon Nov 13 17:23:16 2017, RG SL, Run 128
|
Header: CH2 #33_10_01, beam energy 3.5 MeV/u
Ender: Stop for laser optimisation
====================================================
|
Mon Nov 13 15:06:09 2017, MB, CLW, SJL, Run 127
|
Header: CH2 #33+10+01, beam energy 3.6
Ender:
|
Mon Nov 13 14:25:20 2017, MB, CLW, SJL, Run 126
|
Header: CH2 #33+10+01, beam energy 3.6
Ender: no beam at the start, so start afresh with run with continuour beam (hopefully)
|
Mon Nov 13 12:10:18 2017, MB, CLW, SJL, Run 125
|
Header: CH2 #33+10+01, beam energy 3.6
Ender:
|
Mon Nov 13 10:10:52 2017, MB, CLW, SJL, PJW, Run 124
|
Header: CH2 #33+10+01, beam energy 3.6
Ender:
|
Mon Nov 13 10:01:39 2017, MB, CLW, SJL, PJW, Run 123 JUNK
|
| JUNK |
Mon Nov 13 07:23:23 2017, MB, CLW, Run 122
|
Header: CH2 #16, beam energy 4.4
Ender:
|
Mon Nov 13 06:08:52 2017, MD, RG, Run 121
|
Header: CH2 #16, beam energy 4.4
Ender:
|
Mon Nov 13 06:06:23 2017, MD, RG, Run 120 - junk
|
| Double klick on stopp, so it jumped to 121. R120 file should be empty or non existing. |
Mon Nov 13 03:52:48 2017, MD, RG, Run 119
|
Header: CH2 #16, beam energy 4.4
Ender:
|
Mon Nov 13 02:59:37 2017, RG MD, Run 118 - short
|
Header: CH2 #16, beam energy 4.4
Ender: IHS tripped (third time tonight)
====================================================
|
Mon Nov 13 00:57:24 2017, MD, DK, RG, Run 117
|
Header: 4.4 MeV/u on @ CH2
Ender:
====================================================
|
Mon Nov 13 00:12:24 2017, RG MD DK, Run 116
|
Header: CH2 #16, beam energy 4.4 MeV/u
Ender: Run stopped short - IHS tripped
====================================================
|
Sun Nov 12 23:52:10 2017, DK, MD, RG, Run 115 - short
|
Header: Continue 4.4 MeV / u @ CH2
Ender: Run stopped short as the IHS tripped
====================================================
|
Sun Nov 12 23:51:34 2017, MD, DK, RG, Run 114 - Junk
|
| Double clicked the start / stop so it is blank. |
Sun Nov 12 21:27:23 2017, DK, MB, Run 113
|
Header: Continue 4.4 MeV/u on CH2
Ender: End
====================================================
|
Sun Nov 12 15:34:39 2017, DK, MB, Run 110
|
Header: Carbon target at 4.4 MeV/u
Ender: End
====================================================
|
Sun Nov 12 13:24:51 2017, CLW, PJW, Run 109
|
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender: End
====================================================
|
Sun Nov 12 11:19:06 2017, CLW, PJW, Run 108
|
Header: 4.29MeV/u 59Cu20+ + (CH2)n #16
Ender:
====================================================
|