AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 7 of 11  ELOG logo
ID Date Author Subjectdown Text Attachments
  144   Mon Nov 13 19:09:53 2017 SL RGRun 129Junk - double pressed stop acquisition   
  142   Mon Nov 13 17:23:16 2017 RG SLRun 128Header: CH2 #33_10_01, beam energy 3.5 MeV/u
Ender: Stop for laser optimisation
====================================================
  
  141   Mon Nov 13 15:06:09 2017 MB, CLW, SJLRun 127
Header: CH2 #33+10+01, beam energy 3.6
Ender: 
  
  140   Mon Nov 13 14:25:20 2017 MB, CLW, SJLRun 126
Header: CH2 #33+10+01, beam energy 3.6
Ender: no beam at the start, so start afresh
  
  139   Mon Nov 13 12:10:18 2017 MB, CLW, SJLRun 125
Header: CH2 #33+10+01, beam energy 3.6
Ender: 
  
  138   Mon Nov 13 10:10:52 2017 MB, CLW, SJL, PJWRun 124
Header: CH2 #33+10+01, beam energy 3.6
Ender: 
  
  137   Mon Nov 13 10:01:39 2017 MB, CLW, SJL, PJWRun 123 JUNKJUNK   
  136   Mon Nov 13 07:23:23 2017 MB, CLWRun 122
Header: CH2 #16, beam energy 4.4
Ender: 
  
  135   Mon Nov 13 06:08:52 2017 MD, RGRun 121
Header: CH2 #16, beam energy 4.4
Ender: 
  
  134   Mon Nov 13 06:06:23 2017 MD, RGRun 120 - junkDouble klick on stopp, so it jumped to 121.
R120 file should be empty or non existing.
  
  133   Mon Nov 13 03:52:48 2017 MD, RGRun 119
Header: CH2 #16, beam energy 4.4
Ender: 
  
  132   Mon Nov 13 02:59:37 2017 RG MDRun 118 - shortHeader: CH2 #16, beam energy 4.4
Ender: IHS tripped (third time tonight)
====================================================
  
  131   Mon Nov 13 00:57:24 2017 MD, DK, RGRun 117Header: 4.4 MeV/u on @ CH2
Ender: 
====================================================
  
  130   Mon Nov 13 00:12:24 2017 RG MD DKRun 116Header: CH2 #16, beam energy 4.4 MeV/u
Ender: Run stopped short - IHS tripped
====================================================
  
  129   Sun Nov 12 23:52:10 2017 DK, MD, RGRun 115 - shortHeader: Continue 4.4 MeV / u @ CH2
Ender: Run stopped short as the IHS tripped
====================================================
  
  128   Sun Nov 12 23:51:34 2017 MD, DK, RGRun 114 - JunkDouble clicked the start / stop so it is blank.   
  127   Sun Nov 12 21:27:23 2017 DK, MBRun 113Header: Continue 4.4 MeV/u on CH2
Ender: End
====================================================
  
  124   Sun Nov 12 15:34:39 2017 DK, MBRun 110Header: Carbon target at 4.4 MeV/u
Ender: End
====================================================
  
  123   Sun Nov 12 13:24:51 2017 CLW, PJWRun 109Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender: End
====================================================
  
  122   Sun Nov 12 11:19:06 2017 CLW, PJWRun 108Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender:
====================================================
  
ELOG V3.1.4-unknown