ID |
Date |
Author |
Subject |
Text |
 |
154
|
Tue Nov 14 07:04:13 2017 |
DK, MD, CL | Run 140 | Header: Protons are back, continue 3.5 MeV/u
on CH2
Ender:
|
|
13
|
Wed Aug 16 15:30:04 2017 |
DK, MD | Shipping Inventory | ==BOX A== 59kg - 600mm x 600mm x 800mm
VME crate, with power cable
|
|
150
|
Tue Nov 14 02:16:10 2017 |
DK, MD | Run 135 | Header: Back to CH2 with 3.5 MeV/u
Ender:
====================================================
|
|
153
|
Tue Nov 14 06:22:29 2017 |
DK, MD | Run 139 | Header: Continue at 3.5 MeV/u w/ CH2
Ender: No protons are coming to ISOGPS
====================================================
|
|
165
|
Wed Nov 15 01:02:59 2017 |
DK, MD | Run 151 | Header: Continue with 5.0 MeV/
Ender:
====================================================
|
|
124
|
Sun Nov 12 15:34:39 2017 |
DK, MB | Run 110 | Header: Carbon target at 4.4 MeV/u
Ender: End
====================================================
|
|
127
|
Sun Nov 12 21:27:23 2017 |
DK, MB | Run 113 | Header: Continue 4.4 MeV/u on CH2
Ender: End
====================================================
|
|
204
|
Mon Nov 5 16:26:34 2018 |
DK, CBH | Draft run plan | Please see https://elog.ph.ed.ac.uk/ISOLDE/203
for the E_cm calculations.
|
|
2
|
Fri Jan 27 11:33:10 2017 |
DK | Testing email server | Tinkering with configs for SYMPA email server
to see if the elog info is sent to the mailing
list or not
|
|
6
|
Wed Apr 26 12:10:04 2017 |
DK | Testing email header | I asked IT about putting the elog name into
the email subject line (useful for those
of us subscribed to more than one elog). |
|
10
|
Thu Jun 1 13:09:38 2017 |
DK | Testing email header, part II | Checking some server settings for the elog
system regarding the email notification.
|
|
11
|
Wed Aug 16 12:53:43 2017 |
DK | To do / missing | Photodiode
Electronics
Foil mount (12 um Al seems okay, but |
|
Draft
|
Wed Aug 16 15:29:57 2017 |
DK | Shipping Inventory | ==BOX A==
VME crate
26 ribbon cables
|
|
171
|
Wed Nov 15 14:18:30 2017 |
DK | Issues and problems encountered | Objective log on perceived issues. (As a
benchmark, I enumerated 17 such issues on
my previous RIB experiment March 2017.)
|
|
186
|
Thu Aug 23 18:23:27 2018 |
DK | Where to find (our) stuff at ISOLDE | =Overview=
Shoes, hard hats, 'underpants', spiders, |
|
187
|
Thu Aug 23 18:57:15 2018 |
DK | What daid is taking from ISOLDE to Edinburgh | 1 bolt for chamber stand structure, for reference
for new struts.
|
|
188
|
Thu Aug 30 15:14:50 2018 |
DK | Gate Valve | Some notes on the broken gate valve that should
go between SEC and our chamber at XT03. |
  |
189
|
Mon Sep 24 14:44:48 2018 |
DK | ISOLDE vacuum schematic | Attached. PDF is produced with Gnome Dia
-- source file attached as well.
|
 |
191
|
Thu Sep 27 12:41:06 2018 |
DK | Strut measurement request | For posterity
==========
|
|
194
|
Mon Oct 8 12:07:18 2018 |
DK | Gas cell check with He sniffer | Notes from an email:
Tested the chamber with the leak checker. |
|