AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 8 of 11  ELOG logo
ID Date Authordown Subject Text Attachments
  154   Tue Nov 14 07:04:13 2017 DK, MD, CLRun 140Header: Protons are back, continue 3.5 MeV/u
on CH2
Ender: 
  
  13   Wed Aug 16 15:30:04 2017 DK, MDShipping Inventory==BOX A==  59kg - 600mm x 600mm x 800mm

VME crate, with power cable
  
  150   Tue Nov 14 02:16:10 2017 DK, MDRun 135Header: Back to CH2 with 3.5 MeV/u
Ender: 
====================================================
  
  153   Tue Nov 14 06:22:29 2017 DK, MDRun 139Header: Continue at 3.5 MeV/u w/ CH2
Ender: No protons are coming to ISOGPS
====================================================
  
  165   Wed Nov 15 01:02:59 2017 DK, MDRun 151Header: Continue with 5.0 MeV/
Ender: 
====================================================
 171115_protonquickdrop.jpg 
  124   Sun Nov 12 15:34:39 2017 DK, MBRun 110Header: Carbon target at 4.4 MeV/u
Ender: End
====================================================
  
  127   Sun Nov 12 21:27:23 2017 DK, MBRun 113Header: Continue 4.4 MeV/u on CH2
Ender: End
====================================================
  
  204   Mon Nov 5 16:26:34 2018 DK, CBHDraft run planPlease see https://elog.ph.ed.ac.uk/ISOLDE/203
for the E_cm calculations.
  
  2   Fri Jan 27 11:33:10 2017 DKTesting email serverTinkering with configs for SYMPA email server
to see if the elog info is sent to the mailing
list or not
  
  6   Wed Apr 26 12:10:04 2017 DKTesting email headerI asked IT about putting the elog name into
the email subject line (useful for those
of us subscribed to more than one elog).
  
  10   Thu Jun 1 13:09:38 2017 DKTesting email header, part IIChecking some server settings for the elog
system regarding the email notification.
  
  11   Wed Aug 16 12:53:43 2017 DKTo do / missingPhotodiode
     Electronics
     Foil mount (12 um Al seems okay, but
  
  Draft   Wed Aug 16 15:29:57 2017 DKShipping Inventory==BOX A==
VME crate
26 ribbon cables
  
  171   Wed Nov 15 14:18:30 2017 DKIssues and problems encounteredObjective log on perceived issues.  (As a
benchmark, I enumerated 17 such issues on
my previous RIB experiment March 2017.)
  
  186   Thu Aug 23 18:23:27 2018 DKWhere to find (our) stuff at ISOLDE=Overview=

Shoes, hard hats, 'underpants', spiders,
 edinburgh-notices-daid.pdf 
  187   Thu Aug 23 18:57:15 2018 DKWhat daid is taking from ISOLDE to Edinburgh1 bolt for chamber stand structure, for reference
for new struts.
  
  188   Thu Aug 30 15:14:50 2018 DKGate ValveSome notes on the broken gate valve that should
go between SEC and our chamber at XT03.
 image007.jpgS12.1_DN16-50_IOMI.PDFgv_smaller.jpg 
  189   Mon Sep 24 14:44:48 2018 DKISOLDE vacuum schematicAttached.  PDF is produced with Gnome Dia
-- source file attached as well.
 isolde-vacuum-schematic.pdfisolde-vacuum-schematic.dia 
  191   Thu Sep 27 12:41:06 2018 DKStrut measurement requestFor posterity

==========
 edinburgh-chamber-query.pdf 
  194   Mon Oct 8 12:07:18 2018 DKGas cell check with He snifferNotes from an email:

Tested the chamber with the leak checker.
  
ELOG V3.1.4-unknown