ID |
Date |
Author |
Subject |
Text |
 |
70
|
Thu Nov 9 15:55:56 2017 |
SL | Run 65 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (E - corrected, not HI, now ~50%
live time)
Ender:
====================================================
Run |
|
71
|
Thu Nov 9 16:30:15 2017 |
SL | Run 66 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender:
====================================================
Run |
|
74
|
Thu Nov 9 18:56:13 2017 |
SL | Run 72 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run
number : 72
Date : 09/11
Start time : |
|
75
|
Thu Nov 9 19:06:08 2017 |
SL | Run 68-71 | JUNK |
|
76
|
Thu Nov 9 20:46:29 2017 |
SL | Run 73 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
NO BEAM FROM PSB - called CCC and stopped
run.
====================================================
Run |
|
77
|
Thu Nov 9 21:31:16 2017 |
SL | Run 74 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
STOP due to PSB fire.
====================================================
Run
number : 74
Date : 09/11
Start time : |
  |
85
|
Fri Nov 10 10:46:54 2017 |
SL | Investigation of E detector thickness | While changing HI degrader foil to 10um
Al, the E detector was investigated, due
to previously observed alpha punch-through. |
|
88
|
Fri Nov 10 19:01:13 2017 |
SL | Run 81 |
Header: 3.99 MeV/u and CH2_30+25.
Ender:
Stopped to check E hardware.
====================================================
Run |
|
89
|
Fri Nov 10 19:57:49 2017 |
SL | Run 82 |
Header: 3.99 MeV/u and CH2_30+25.
Ender:
====================================================
Run
number : 82
Date : 10/11
Start time : |
|
90
|
Fri Nov 10 20:30:57 2017 |
SL | Run 83 |
Header: 3.99 MeV/u and CH2_30+25.
Ender:
Recompiling sort code.
====================================================
Run |
|
157
|
Tue Nov 14 14:30:51 2017 |
SL | Photos inside chamber (detectors, IRIS, etc) | |
|
48
|
Wed Nov 8 21:21:31 2017 |
Ruchi Garg, Daid | RunLogTemplate | Header:
Ender:
====================================================
|
|
44
|
Tue Nov 7 14:38:25 2017 |
Ruchi Garg | Target ladder configuration | |
|
38
|
Sun Nov 5 20:25:10 2017 |
Ruchi | Circuit diagram and cable mapping | |
  |
51
|
Wed Nov 8 22:21:35 2017 |
Ruchi | Beam transmission | By the end of beam tuning (around 6pm),
beam transmission between Faraday cups at
the end of SEC and at end of Edinburgh chamber: |
|
179
|
Thu Nov 16 15:37:35 2017 |
RG, MD, CLW | Run 167 JUNK | |
|
106
|
Sat Nov 11 17:08:50 2017 |
RG, DK, CL, TD, AM, MD | Run 96 | Header: Continue with 4.0 MeV/u Empty Frame
Ender:
====================================================
|
|
142
|
Mon Nov 13 17:23:16 2017 |
RG SL | Run 128 | Header: CH2 #33_10_01, beam energy 3.5 MeV/u
Ender: Stop for laser optimisation
====================================================
|
|
130
|
Mon Nov 13 00:12:24 2017 |
RG MD DK | Run 116 | Header: CH2 #16, beam energy 4.4 MeV/u
Ender: Run stopped short - IHS tripped
====================================================
|
|
132
|
Mon Nov 13 02:59:37 2017 |
RG MD | Run 118 - short | Header: CH2 #16, beam energy 4.4
Ender: IHS tripped (third time tonight)
====================================================
|
|