  120   Sun Nov 12 09:16:01 2017 CLW, PJW, TDRun 106junk - ignore   
  121   Sun Nov 12 09:17:49 2017 CLW, PJW, TDRun 107Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender:
====================================================
  
  105   Sat Nov 11 15:17:24 2017 CLW, PJW, RG, TD, MD, DKRun 95Header: Continue with 4.0 MeV/u on Carbon
after laser cleaning
Ender: 
  
  102   Sat Nov 11 11:21:22 2017 CLW, PJW, RGRun 92
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
  
  103   Sat Nov 11 12:16:28 2017 CLW, PJW, RGRun 93
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
  
  104   Sat Nov 11 14:15:12 2017 CLW, PJW, RGRun94Header: 3.99 MeV/u and C_25. 
Ender: We stop because the lasers are being
cleaned, and we saw the scalars drop.  See
  
  122   Sun Nov 12 11:19:06 2017 CLW, PJWRun 108Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender:
====================================================
  
  123   Sun Nov 12 13:24:51 2017 CLW, PJWRun 109Header: 4.29MeV/u 59Cu20+ + (CH2)n #16 
Ender: End
====================================================
  
  101   Sat Nov 11 09:20:56 2017 CLW, MD, PJWRun 91
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
  
  159   Tue Nov 14 16:00:29 2017 CLW, MB, SJL,RGRun 145Header: 5 MeV/u on CH2 33,10,01
Ender:  End to allow laser cleaning
====================================================
  
  155   Tue Nov 14 08:09:31 2017 CLWRun 142Header: Protons are back, continue 3.6 MeV/u
on CH2
Ender: 
  
  158   Tue Nov 14 15:59:42 2017 CLWRun 144 JUNKvalve closed   
  185   Thu Nov 23 13:16:56 2017 CLWBeam energiesBeam energy measurements can be found in
the electronic logbook for ISO-REX-HIE

https://op-webtools.web.cern.ch/elogbook/
  
  205   Wed Nov 7 14:27:45 2018 CBH, DKBeam Plan for Miguel and Alberto (ISOLDE beam operators)




Presently,
we are scheduled for 9 days: 
  Nov 26-28
are three (3) days nominally for beam development
  
  206   Thu Nov 8 10:01:32 2018 CBH, DKNew Struts InstallationStruts arrived and were installed on Wednesday. The
holes on one side of each of the struts to
connect the wheels to were slightly too wide
 8x 
  190   Thu Sep 27 11:14:34 2018 CBHPhotos and Measurements from August CERN TripChamber frame width=65cm
Chamber frame height=146cm
Chamber frame length=230cm
 20180823_082444199_iOS.jpg20180823_082445833_iOS.jpg20180823_082457574_iOS.jpg20180823_082505693_iOS.jpg 
  203   Mon Nov 5 13:52:46 2018 CBHCoM energies for 44Ti(alpha,p) reaction for different entrance windows and beam energiesAssuming 200 Torr helium target., elastic
and reaction peaks do not have signifcant
overlap unless stated:
  
  209   Mon Nov 12 11:25:58 2018 CBHExpected Proton Energy Plots Attached are the plots from MC simulations
of the energies the detected particles are
to have, with the top plot showing the dE-E
 ti_6.00um_2.8MeVu.pngti_3um_1.88MeVu.pngal_12.5_2.8MeVu.pngMargerin2014elog.png 
  79   Fri Nov 10 01:29:51 2017 ASM, MD, DKrun 75Header: 4.7 MeV/u and C_09. PS back, but need
to check how much beam actually there was
before next issue
  
  107   Sat Nov 11 17:19:54 2017 ASM, CL, TD...halflifePlaced a hand held rad monitor near the
faraday cup and took rate readings every
20 seconds, right after inserting the gate
 Screen_Shot_2017-11-11_at_18.25.54.png 