AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 9 of 11  ELOG logo
Entry  Tue Mar 14 10:57:20 2017, Claudia , Meeting Edinburgh 14 March 10 am 2017 
1) DAQ

We have 192 channels to DAQ working. Mirco will test the silicon detectors with an alpha source in the next 2 weeks. 

2) Vacuum
Entry  Thu Oct 5 11:34:34 2017, Claudia, Meeting 5.10.17 
POINTS FOR DISCUSSION

 


Email sent to Karl and Olof about 
FC at end of SEC
Gain resistor package
Network access
N2
Entry  Thu Oct 19 10:55:54 2017, Claudia, Meeting 19.10. 
CERN-Edinburgh Liaison


FC at end of SEC: manual
Network access: port free.
N2 gas ? 
-date for connection of SEC to our
chamber: week 30. October, 2nd November alignment. 
collimator in front of chamber ?? contact Jorge Alberto about beam tuning in general
Entry  Thu Oct 12 12:45:54 2017, Claudia, Meeting 12.10.17 
Email sent to Karl and Olof about 


FC at end of SEC
Gain resistor package
Network access
N2 gas
date for connection of SEC to
our chamber
collimator in front of chamber ?


Next week call Karl. Daid will look at old Olof emails
Entry  Wed Oct 31 16:01:33 2018, DK, Measuring foil thickness DOC_(4).PDFDOC_(5).PDF
A couple scans from my notes which may be useful.

One discusses alpha energy loss in nominal kitchen foil (~12 um) and also introduces my technique to calibrate a thin (~20 um) SSD.  Sorry I forget which
Entry  Thu Sep 14 15:40:42 2017, TD, MSL type S2 bias data MSLtypeS2.txt
 
Entry  Sat Nov 4 06:29:03 2017, TD, MIDASsort online sort programs, spectrum titles, calibration s/w & READMEs IS607.tar.gzCalibration.tar.gzREADMEs.tar.gz
 
Entry  Wed Nov 8 17:12:01 2017, TD, MIDAS logs snoop.logvmecpu.log
Attachment 1 - snoop -d bge1 log following MVME CPU reset

Attachment 2 - VME CPU system console
Entry  Sat Nov 11 19:35:28 2017, TD, MIDAS DAQ configuration & MIDAS logs 1-11.11.17 16x
 
Entry  Fri Sep 8 19:12:19 2017, TD, MIDAS DAQ configuration 7x

MIDAS DAQ configuration files from directories w26:/MIDAS/experiments/daq
and w26:/MIDAS/TapeServer/SunOS
Entry  Sat Nov 4 14:10:20 2017, daid, Julabo chiller operation 
This log entry contains a basic instruction on how to operate the Julabo liquid flow chiller.

There are 5 buttons (left to right): Up/Down, Enter, 1/0.  
Entry  Wed Nov 15 14:18:30 2017, DK, Issues and problems encountered 
Objective log on perceived issues.  (As a benchmark, I enumerated 17 such issues on my previous RIB experiment March 2017.)

In no particular order...
Entry  Fri Nov 10 10:46:54 2017, SL, Investigation of E detector thickness 
While changing HI degrader foil to 10um Al, the E detector was investigated, due to previously observed alpha punch-through.
On visual inspection, the E detector appeared to be 1mm in thickness, leading us to believe that instead we were not fully depleting the detector.

The bias supply was investigated, and was found to be supplying a lower voltage (on all channels) than was shown on the display (14V -> 2V
Entry  Fri Nov 2 17:01:16 2018, DK, Inventory going to CERN by easyJet 
Conor will take:

==Black clicker case==
Entry  Mon Sep 24 14:44:48 2018, DK, ISOLDE vacuum schematic isolde-vacuum-schematic.pdfisolde-vacuum-schematic.dia
Attached.  PDF is produced with Gnome Dia -- source file attached as well.

Bellow near GV is not depicted.  None of SEC components are depicted (as they would be irrelevant with the GV in place).
Entry  Thu Aug 30 15:14:50 2018, DK, Gate Valve image007.jpgS12.1_DN16-50_IOMI.PDFgv_smaller.jpg
Some notes on the broken gate valve that should go between SEC and our chamber at XT03.
Entry  Mon Oct 8 12:05:25 2018, DK, PB, Gas cell supports gas_cell_support.PDF
These are used to connect the gas cell to the target ladder.  We only had the one, and it would be more convenient if each gas cell has its own, to avoid
swapping them back and forth.
Entry  Mon Oct 8 12:07:18 2018, DK, Gas cell check with He sniffer 
Notes from an email:

Tested the chamber with the leak checker.  We got 3.7 x 10^-6 mbar
Entry  Mon Nov 6 10:46:53 2017, Peter Black, Faraday cup drawings Farady_cup.PDFcup.PDFsupressor.PDFFarady_cup_main.PDF
Note that the removal of the supressor reqires the special allen key.
Entry  Mon Nov 12 11:25:58 2018, CBH, Expected Proton Energy Plots  ti_6.00um_2.8MeVu.pngti_3um_1.88MeVu.pngal_12.5_2.8MeVu.pngMargerin2014elog.png
Attached are the plots from MC simulations of the energies the detected particles are to have, with the top plot showing the dE-E plot and the bottom
plot showing the total energy of the particles.

Please note the height of the peaks is not indicative of the counts expected and there is a low proton background expected between the entrance
ELOG V3.1.4-unknown