AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 9 of 11  ELOG logo
Entry  Mon Nov 6 16:12:47 2017, Peter Black, chamber drawings FullAssemb2.PDFsection.PDF
work in progress. 
Entry  Mon Nov 6 10:52:58 2017, Peter Black, alignment hardware drawings ladder_alignment_block.PDFS2_alignment_bar.PDFalignment_plug_70mm.PDFalignment_plug.PDF
 
Entry  Mon Nov 6 10:50:33 2017, Peter Black, foil mount drawings SiPD_foil_mount.PDFfOIL_HOLDER.PDF
 
Entry  Mon Nov 6 10:46:53 2017, Peter Black, Faraday cup drawings Farady_cup.PDFcup.PDFsupressor.PDFFarady_cup_main.PDF
Note that the removal of the supressor reqires the special allen key.
Entry  Sun Nov 5 20:25:10 2017, Ruchi, Circuit diagram and cable mapping Cabling.pdfPreampsPCBs.pdfCircuit.pdf
 
Entry  Sat Nov 4 14:10:20 2017, daid, Julabo chiller operation 
This log entry contains a basic instruction on how to operate the Julabo liquid flow chiller.

There are 5 buttons (left to right): Up/Down, Enter, 1/0.  
Entry  Sat Nov 4 06:29:03 2017, TD, MIDASsort online sort programs, spectrum titles, calibration s/w & READMEs IS607.tar.gzCalibration.tar.gzREADMEs.tar.gz
 
Entry  Mon Oct 30 09:46:04 2017, Peter Black, Notes on iris install/operation 
The iris mounts have 2 superimposed constellations of 3mm mounting holes on them that correspond to those of the S2 detector, however the 85x85 square
is missing one hole and the 110x40 rectangle is rotated by 45°. Either constellation may be used. Fixing is intended with M3x16 bolts into 10mm standoffs
used to attach the detector to its mount.
Entry  Tue Oct 24 09:27:24 2017, Peter Black, DK, Safety words  


Plate 1.  Contents of chamber

Entry  Thu Oct 19 14:41:19 2017, daid, heavy ion degrader foil - full / new 8x
See entry https://elog.ph.ed.ac.uk/ISOLDE/28 for a full description, but editing the same elog is altering attachment numbers etc.

Here I've added 20 um foil as well as 5.3 MeV/u (~313 MeV) 59Cu beam.
Entry  Thu Oct 19 10:55:54 2017, Claudia, Meeting 19.10. 
CERN-Edinburgh Liaison


FC at end of SEC: manual
Network access: port free.
N2 gas ? 
-date for connection of SEC to our
chamber: week 30. October, 2nd November alignment. 
collimator in front of chamber ?? contact Jorge Alberto about beam tuning in general
Entry  Thu Oct 12 12:45:54 2017, Claudia, Meeting 12.10.17 
Email sent to Karl and Olof about 


FC at end of SEC
Gain resistor package
Network access
N2 gas
date for connection of SEC to
our chamber
collimator in front of chamber ?


Next week call Karl. Daid will look at old Olof emails
Entry  Thu Oct 5 11:34:34 2017, Claudia, Meeting 5.10.17 
POINTS FOR DISCUSSION

 


Email sent to Karl and Olof about 
FC at end of SEC
Gain resistor package
Network access
N2
Entry  Wed Oct 4 18:57:16 2017, dk, Digitized run notes from tests at CERN 
Transcription of paper logbook for runs.  Please check as I cannot read all the writing.

Wednesday 13/9/2017
Entry  Thu Sep 28 03:38:18 2017, dk, heavy ion degrader foil - updated 8x
--original email text--
Using Claudia's code, I added a layer of Al foil before the heavy ion
silicon detector.  The attached plots correspond to the heavy ion
Entry  Thu Sep 28 03:34:20 2017, dk, heavy ion degrader foil degrader.pdf

--text from email--
Using Claudia's code, I added a layer of Al foil before the heavy ion
Entry  Mon Sep 25 14:50:46 2017, dk, To do list before main exp. - update from meeting 28th September 
NB: This list may be incomplete!

CERN side: 
Entry  Thu Sep 21 14:54:00 2017, Claudia, Alpha Calibration Spectra Screenshot_from_2017-09-21_14-43-48.pngScreenshot_from_2017-09-21_14-43-17.png
Alpha Calibration Runs (need to check settings in logbook)

0-63: dE detector and 32-47 is n+n;  64-127 E detector and 96-111 is n+n; 128-191 HI detector

Run 13:  alpha source in fromt of dE detector (0-63). All detectors connected.
Entry  Tue Sep 19 14:54:47 2017, Claudia, Toby, Setup Photos 14x
 
Entry  Thu Sep 14 15:40:42 2017, TD, MSL type S2 bias data MSLtypeS2.txt
 
ELOG V3.1.4-unknown