13
|
Sat Feb 28 09:20:14 2026 |
TD | MIDAS DAQ configuration |
MIDAS DAQ configuration files
|
8x |
|
14
|
Sat Feb 28 12:09:56 2026 |
TD | Offline analysis data file R52 |
Offline data analysis of data file R52
c. 1h 2.25MeV neutrons from 10uA p+ + 410ug/cm2 |
8x |
|
8
|
Fri Feb 27 12:41:34 2026 |
SB, TD, FGI | Friday 27 February 2026 |
BNC PB-5 settings
Amplitude 5.0V
|
11x |
|
10
|
Fri Feb 27 14:38:28 2026 |
SB, TD, FGI | R51 |
start: 14:31:03 (w23 is set to GMT)
stop: 14:38:09
|
|
|
11
|
Fri Feb 27 15:17:59 2026 |
SB, TD, FGI | R52 | Start: 15:06:06 GMT
Stop: 16:13:45
Blocks: 875
|
|
|
12
|
Sat Feb 28 08:59:14 2026 |
SB, TD, FGI | R53 |
start: 16:14:44 27.2.26
stop: 08:38:26 2.3.26
|
6x |
|
2
|
Thu Jan 29 16:16:46 2026 |
Francisco García Infantes | SetUp Status | Here is a brief status update on the chamber
setup.
At the moment, we have all the |
   |
|
3
|
Fri Jan 30 15:45:48 2026 |
Francisco Garcia Infantes | DAQ and cables status | Concerning the electronic
stuff. We will need: |
    |
|
5
|
Tue Feb 10 09:03:26 2026 |
Francisco Garcia Infantes | Contents of shipment boxes | BOX
A
|
|
|
6
|
Tue Feb 10 09:31:47 2026 |
Francisco Garcia Infantes | Detector Voltage vs Current | Analysis
of how the current changes with increasing
voltage for both detectors. |
|
|
19
|
Mon Mar 2 11:11:18 2026 |
FGI, TD, SB, CLW | Second configuration. | After the first weekend, we change the
setup configuration. We removed the shadow
cone, and we placed the chamber closer to |
 |
|
22
|
Mon Mar 2 13:50:20 2026 |
FGI, TD, SB, CLW | Cabling | The cables are plug in this way.
Cable 0 connected to Preamp A,
Positive output. (n+n side, toward the sample) |
|
|
25
|
Tue Mar 3 15:28:37 2026 |
FGI, SB, CLW | Run 59 | Before this run, we change the target for
the neutron source. We are using a Triton
target of ~200 ug/cm². |
|
|
27
|
Thu Mar 5 09:21:10 2026 |
FGI, SB | Run 60 | NaCl #5 sample in beam
Starting time: 15:29:51
Stop time : 08:19:57 |
|
|
28
|
Thu Mar 5 09:22:58 2026 |
FGI, SB | Run 61 | Boron-10 #3 sample in beam
Starting time: 08:49:16
Stop time : 15:07:34 |
|
|
29
|
Thu Mar 5 09:24:21 2026 |
FGI, SB | Run62 | Gold + Mylar sample in beam
Starting time: 15:32:00
Stop time : 08:13:55 |
|
|
30
|
Thu Mar 5 09:25:45 2026 |
FGI, SB | Run 63 | LiF #8 sample in beam
Starting time: 08:34:15
Stop time : 14:53:02 |
|
|
31
|
Fri Mar 6 08:55:16 2026 |
FGI, SB | Run 64 | LiF #7 sample in beam
Starting time: 15:11:10
Stop time : 08:14:22 |
|
|
32
|
Fri Mar 6 08:56:26 2026 |
FGI, SB | Run 65 | Am-241 calibration source. Towards DSSSD
#2 (PreAmp B) upstream detector
Starting time: 08:41:21 |
|
|
15
|
Mon Mar 2 09:43:05 2026 |
FG,SB,CLW,TD | Run 54 |
start: 09:36:05 2.3.26
stop: 09:43:49
2.3.26
blocks: 14
Cu rod taken
out, run in neutron beam with NaCl target. |
|