AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
nToF, Page 1 of 4
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
77 Entries
Goto page 1,
2
,
3
,
4
Next
All
ID
Date
Author
Subject
Text
80
Mon Sep 16 12:36:45 2024
TD
34-way IDC to 37-way D connector ribbon cables
The 2x sets of 34-way IDC to 37-way D connctor
ribbon cables used at GSI for the two-alpha
79
Sat Sep 14 09:30:40 2024
TD
Neutron beam profile
Neutron beam profile - film exposure overnight
12/13.9.24
78
Thu Sep 12 15:26:30 2024
Nick
EAR2 Periodic Noise
76
Thu Sep 12 11:07:29 2024
Nick
40K Borrowed Items
We borrowed from n_TOF:
1x O-ring for circular side-flanges
on the chamber (the borrowed part has a small
74
Tue Apr 16 12:24:01 2024
Emmanuel
MWD amplitude (dE and E)
73
Mon Mar 25 12:57:30 2024
Clw
Adapters for ntof setup
10 new Adapters for lemo to bnc on my desk
72
Thu Dec 7 09:48:23 2023
Emmanuel
MWDdetector and User Input
MWDdetector and UserInput
71
Mon Oct 2 08:53:06 2023
Emmanuel
Empty Frame
An empty frame (on the top) was placed
on Friday night.
70
Thu Sep 28 15:32:16 2023
Emmanuel
LiF sample in
We switched from 10B target (number 1)
to LiF target (number 3). We planned to take
this measurement for one day.
69
Wed Sep 27 09:54:06 2023
Emmanuel
10B sample in
We switched from Aluminium target to Boron
Target (number 1) on Tuesday (26th of
Sept.). The Aluminium target was placed in
68
Tue Sep 5 16:09:45 2023
Emmanuel
Drop in gain for DEED 14
Dear all,
There was an issue with one of
the strips of the deltaE detector (DEED 14),
67
Mon Aug 21 12:08:59 2023
TD
RAL108 +/-15V PSU test - JCMB 21.8.23
PSU Calex
Setup, PSU and ac mains filter - attachments
13x
66
Sat Aug 19 14:14:26 2023
TD
RAL108 +/-15V PSU test - JCMB 18.8.23
PSU Calex
Setup and PSU details - attachments 1-3
10x
65
Thu Aug 17 10:26:51 2023
Nikolay Sosnin
Data Processing
To run raw2root on LXPLUS, you will need
to add the following line to your .bashrc,
performed using
64
Tue Aug 15 11:41:27 2023
TD, NS
Monday 14 August - vacuum chamber pressure
08.35 Vacuum chamber pressure OK - see attachment
1
63
Tue Aug 15 10:17:39 2023
TD, NS
RAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August
On the morning of Monday 14 August 2x RAL108
+/-15V PSUs were borrowed from the Edinburgh
equipment in the ISOLDE hall to check whether
7x
62
Mon Aug 14 11:00:13 2023
TD
RAL108 +/-15V PSU test in ISOLDE hall
This morning 2x RAL108 +/-15V PSUs were borrowed
from the Edinburgh equipment in the ISOLDE
13x
61
Sat Aug 12 09:24:19 2023
Nikolay Sosnin
26Al Protons
Here is a Google spreadsheet for counting
protons for the runs:
https://docs.google.com/spreadsheets/d/1INX8G9GAu-M70SdZdz55qXnMZNXKXLW7xfFH-eaLuQw/edit?usp=sharing
60
Fri Aug 11 16:50:58 2023
Nikolay Sosnin
EDET24
After inserting aluminium target, previously-dead
channel 24 on EDET was re-plugged into a
12-bit card SPD02872. It is the only EDET
59
Fri Aug 11 13:16:56 2023
Nikolay Sosnin
E Front Incorrect Cabling
E front 2x16-way to 1x34-way IDC cable
from the Junction Box to the IDC-Lemo 00
adaptor was found to be inserted upside-down
Goto page 1,
2
,
3
,
4
Next
All
ELOG V3.1.4-unknown