Entry  Tue Mar 18 13:28:30 2025, Emmanuel, B10 and LiF data with Fast Fourier Transform B10.pdfLi.pdf
Attached is the B10 and LiF data with Fast Fourier Transform and varying time constants.
Entry  Wed Feb 12 13:51:02 2025, CLW, expected counts B and Li 6x
The rootfiles countsB.root and countsLi.root contain histograms of count spectra that would be expected at n_TOF for a 10B and a 6Li target,
respectively. The units in y are arbitrary. This can be used to check, if we can reproduce the expected trend with our Li and B measurements. So the histograms
called "counts" can be directly compared to the histograms called "energy" in Sili_deed.c (they should have the same binning). You
Entry  Mon Sep 16 12:36:45 2024, TD, 34-way IDC to 37-way D connector ribbon cables 20240916_121057_(1).jpg20240916_121052_(1).jpg20240916_121047_(1).jpg20240916_121003_(1).jpg

The 2x sets of 34-way IDC to 37-way D connctor ribbon cables used at GSI for the two-alpha decay measurement have been located - see attachments 1-4.
Entry  Sat Sep 14 09:30:40 2024, TD, Neutron beam profile  20240914_101751.jpg

Neutron beam profile - film exposure overnight 12/13.9.24
Entry  Thu Sep 12 15:26:30 2024, Nick, EAR2 Periodic Noise IMG_20240912_161937023_HDR.jpg
 
Entry  Thu Sep 12 11:07:29 2024, Nick, 40K Borrowed Items 
We borrowed from n_TOF:

1x O-ring for circular side-flanges on the chamber (the borrowed part has a small green marker cross on it)

10x LIMO-to-BNC connectors (BNC female) from electronics lab outside EAR1
Entry  Tue Apr 16 12:24:01 2024, Emmanuel, MWD amplitude (dE and E) 26Al_PDF.pdf
 
Entry  Mon Mar 25 12:57:30 2024, Clw, Adapters for ntof setup 20240325_125536.jpg20240325_125528.jpg
10 new Adapters for lemo to bnc on my desk
Entry  Thu Dec 7 09:48:23 2023, Emmanuel, MWDdetector and User Input UserInput_Silicons.hMWDdetector.cc
MWDdetector and UserInput
Entry  Mon Oct 2 08:53:06 2023, Emmanuel, Empty Frame Empty_Frame.jpeg
An empty frame (on the top) was placed on Friday night.
Entry  Thu Sep 28 15:32:16 2023, Emmanuel, LiF sample in 20230928_154334.jpg20230928_155923.jpg20230926_115053.jpg20230928_155747.jpg
We switched from 10B target (number 1) to LiF target (number 3). We planned to take this measurement for one day.
Entry  Wed Sep 27 09:54:06 2023, Emmanuel, 10B sample in 20230926_113136.jpg20230926_113811.jpg20230926_115036.jpg20230926_115053.jpg20230926_111737.jpg
We switched from Aluminium target to Boron Target (number 1) on Tuesday (26th of Sept.). The Aluminium target was placed in the material room
by the RP. We will change to LiF (number 3) on Thursday (28th of Sept.)
Entry  Tue Sep 5 16:09:45 2023, Emmanuel, Drop in gain for DEED 14 alndeed14.pngalndeed14b.pngalndeed14old.png
Dear all,

There was an issue with one of the strips of the deltaE detector (DEED 14), for run216644. The gain dropped to almost a factor of 3. Find attached.

Somehow, it was fixed, but still lags, when compared to other strips of deltaE. This was tested for a more recent run, run216651. Find attached.
Entry  Mon Aug 21 12:08:59 2023, TD, RAL108 +/-15V PSU test - JCMB 21.8.23 13x
PSU Calex

Setup, PSU and ac mains filter - attachments 1-3
Entry  Sat Aug 19 14:14:26 2023, TD, RAL108 +/-15V PSU test - JCMB 18.8.23 10x
PSU Calex

Setup and PSU details - attachments 1-3
Entry  Thu Aug 17 10:26:51 2023, Nikolay Sosnin, Data Processing 
To run raw2root on LXPLUS, you will need to add the following line to your .bashrc, performed using

gedit ~/.bashrc &

then paste
line at the bottome of the file
Entry  Tue Aug 15 11:41:27 2023, TD, NS, Monday 14 August - vacuum chamber pressure 20230814_083514.jpg

08.35 Vacuum chamber pressure OK - see attachment 1
Entry  Tue Aug 15 10:17:39 2023, TD, NS, RAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August 7x
On the morning of Monday 14 August 2x RAL108 +/-15V PSUs were borrowed from the Edinburgh equipment in the ISOLDE hall to check whether the same transient

noise is observed at the +/-15V PSU outputs.
Entry  Mon Aug 14 11:00:13 2023, TD, RAL108 +/-15V PSU test in ISOLDE hall 13x

This morning 2x RAL108 +/-15V PSUs were borrowed from the Edinburgh equipment in the ISOLDE hall to check whether the same transient noise is observed
at the +/-15V PSU 
Entry  Sat Aug 12 09:24:19 2023, Nikolay Sosnin, 26Al Protons 
Here is a Google spreadsheet for counting protons for the runs:

https://docs.google.com/spreadsheets/d/1INX8G9GAu-M70SdZdz55qXnMZNXKXLW7xfFH-eaLuQw/edit?usp=sharing