AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 1 of 4  ELOG logo
Entry  Tue Apr 16 12:24:01 2024, Emmanuel, MWD amplitude (dE and E) 26Al_PDF.pdf
 
Entry  Mon Mar 25 12:57:30 2024, Clw, Adapters for ntof setup 20240325_125536.jpg20240325_125528.jpg
10 new Adapters for lemo to bnc on my desk
Entry  Thu Dec 7 09:48:23 2023, Emmanuel, MWDdetector and User Input UserInput_Silicons.hMWDdetector.cc
MWDdetector and UserInput
Entry  Mon Oct 2 08:53:06 2023, Emmanuel, Empty Frame Empty_Frame.jpeg
An empty frame (on the top) was placed on Friday night.
Entry  Thu Sep 28 15:32:16 2023, Emmanuel, LiF sample in 20230928_154334.jpg20230928_155923.jpg20230926_115053.jpg20230928_155747.jpg
We switched from 10B target (number 1) to LiF target (number 3). We planned to take this measurement for one day.
Entry  Wed Sep 27 09:54:06 2023, Emmanuel, 10B sample in 20230926_113136.jpg20230926_113811.jpg20230926_115036.jpg20230926_115053.jpg20230926_111737.jpg
We switched from Aluminium target to Boron Target (number 1) on Tuesday (26th of Sept.). The Aluminium target was placed in the material room
by the RP. We will change to LiF (number 3) on Thursday (28th of Sept.)
Entry  Tue Sep 5 16:09:45 2023, Emmanuel, Drop in gain for DEED 14 alndeed14.pngalndeed14b.pngalndeed14old.png
Dear all,

There was an issue with one of the strips of the deltaE detector (DEED 14), for run216644. The gain dropped to almost a factor of 3. Find attached.

Somehow, it was fixed, but still lags, when compared to other strips of deltaE. This was tested for a more recent run, run216651. Find attached.
Entry  Mon Aug 21 12:08:59 2023, TD, RAL108 +/-15V PSU test - JCMB 21.8.23 13x
PSU Calex

Setup, PSU and ac mains filter - attachments 1-3
Entry  Sat Aug 19 14:14:26 2023, TD, RAL108 +/-15V PSU test - JCMB 18.8.23 10x
PSU Calex

Setup and PSU details - attachments 1-3
Entry  Thu Aug 17 10:26:51 2023, Nikolay Sosnin, Data Processing 
To run raw2root on LXPLUS, you will need to add the following line to your .bashrc, performed using

gedit ~/.bashrc &

then paste
line at the bottome of the file
Entry  Tue Aug 15 11:41:27 2023, TD, NS, Monday 14 August - vacuum chamber pressure 20230814_083514.jpg

08.35 Vacuum chamber pressure OK - see attachment 1
Entry  Tue Aug 15 10:17:39 2023, TD, NS, RAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August 7x
On the morning of Monday 14 August 2x RAL108 +/-15V PSUs were borrowed from the Edinburgh equipment in the ISOLDE hall to check whether the same transient

noise is observed at the +/-15V PSU outputs.
Entry  Mon Aug 14 11:00:13 2023, TD, RAL108 +/-15V PSU test in ISOLDE hall 13x

This morning 2x RAL108 +/-15V PSUs were borrowed from the Edinburgh equipment in the ISOLDE hall to check whether the same transient noise is observed
at the +/-15V PSU 
Entry  Sat Aug 12 09:24:19 2023, Nikolay Sosnin, 26Al Protons 
Here is a Google spreadsheet for counting protons for the runs:

https://docs.google.com/spreadsheets/d/1INX8G9GAu-M70SdZdz55qXnMZNXKXLW7xfFH-eaLuQw/edit?usp=sharing
Entry  Fri Aug 11 16:50:58 2023, Nikolay Sosnin, EDET24 EDET24_Card.JPGEDET24_Cable.JPG
After inserting aluminium target, previously-dead channel 24 on EDET was re-plugged into a 12-bit card SPD02872. It is the only EDET on 12-bit card,
the rest are on 14-bit. From pulsers, there appears to be a 90 ns offset from this EDET to others, with EDET24 preceeding the rest. The last channel on
14-bit cards was broken, hence havng to use 12-bit.
Entry  Fri Aug 11 13:16:56 2023, Nikolay Sosnin, E Front Incorrect Cabling 
E front 2x16-way to 1x34-way IDC cable from the Junction Box to the IDC-Lemo 00 adaptor was found to be inserted upside-down - the 16-way IDC connectors
did not have polarisation keys - meaning the E detector p+n junction strip signals collected with 26Al for the first night are not working. Signals
from the dE p+n junction strips and E n+n Ohmic strips will be OK. The mistake occurred at the conclusion of the noise tests yesterday - see https://elog.ph.ed.ac.uk/nToF/52
Entry  Fri Aug 11 13:06:54 2023, Annie, Signal Spreadsheet info IMG_2920.JPGIMG_2921.JPGIMG_2922.JPG
Spreadhseet made for shifters to manually enter that they have checked each signal and that they can see gamma-flashes. It is saved as "26Al_EAR2_Signal_Checks.ods",
it is located on the second monitor on the right of the control room, next to the monitor used to see the beam intensity (same monitor used to see signals).

It will stay open throughout the campeign. Shifters have been told to check signals more than just the once to record that they're okay,
Entry  Fri Aug 11 10:12:02 2023, Annie, Pressure, voltage and current check IMG_2915.JPGIMG_2916.JPGIMG_2918.JPG
 
Entry  Thu Aug 10 16:11:57 2023, TD, NS, AR, Noise 20230810_162959.JPGIMG_2906.jpeg20230810_164219.JPG

Observe c. 2mV p to p noise with DSO ( Z_in = 50 Ohm ) c. 60us period with HF structure. DSO connected to junction box via 34-way IDC - 16x Lemo-00 adaptor.
    Reply  Fri Aug 11 10:02:08 2023, TD, NS, AR, Noise 20230811_104233.jpg20230811_104253.jpg

Check RAL108 +/-15V PSU
Entry  Fri Aug 11 09:17:28 2023, Annie, Li target scans 7Li_foil_side1_post_processed.pdf7Li_foil_side2_post_processed.pdfIMG_2914.JPG
Processed scans of both sides of the Li target showing the beam spot, and an image showing what it looks like to the eye.
ELOG V3.1.4-unknown