AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 1 of 5  ELOG logo
Entry  Thu Aug 10 16:11:57 2023, TD, NS, AR, Noise 20230810_162959.JPGIMG_2906.jpeg20230810_164219.JPG
    Reply  Fri Aug 11 10:02:08 2023, TD, NS, AR, Noise 20230811_104233.jpg20230811_104253.jpg
Entry  Tue Aug 15 10:17:39 2023, TD, NS, RAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August 7x
Entry  Tue Aug 15 11:41:27 2023, TD, NS, Monday 14 August - vacuum chamber pressure 20230814_083514.jpg
Entry  Thu Jul 27 11:53:52 2023, TD, MSL type W1 detector data for 26Al(n,X) experiment EAR2, n_TOF 
Entry  Mon Aug 14 11:00:13 2023, TD, RAL108 +/-15V PSU test in ISOLDE hall 13x
Entry  Sat Aug 19 14:14:26 2023, TD, RAL108 +/-15V PSU test - JCMB 18.8.23 10x
Entry  Mon Aug 21 12:08:59 2023, TD, RAL108 +/-15V PSU test - JCMB 21.8.23 13x
Entry  Sat Sep 14 09:30:40 2024, TD, Neutron beam profile  20240914_101751.jpg
Entry  Mon Sep 16 12:36:45 2024, TD, 34-way IDC to 37-way D connector ribbon cables 20240916_121057_(1).jpg20240916_121052_(1).jpg20240916_121047_(1).jpg20240916_121003_(1).jpg
Entry  Fri Jul 11 09:16:18 2025, TD, Silena 7710 Quad Bias Supply manual and internal configuration Silena_7710_quad_bias_supply.pdf
Entry  Sat Jul 12 11:25:35 2025, Selin, The Detector Bias-Leakage Current Data Ca-VoltageCurrent.xlsx
Entry  Sat Jul 12 11:34:31 2025, Selin, Detector-Cable Connections Detector-Cable.pdf
Entry  Wed Jul 16 08:51:06 2025, Selin, Run221136 Lithium Uncalibrated Data Li_Strip1.pngLi_Strip1_Par.pngLi_ded_2d.png
Entry  Wed Jul 16 08:55:22 2025, Selin, Run221141 Boron Uncalibrated Data B_Strip1.pngB_ded_2d.pngB_Strip22.png
Entry  Wed Jul 16 11:45:39 2025, Selin, Boron Spectra Update After Setting Change + Pulser Removed B_Strip2_ded.pngB_Strip19_ded.png
Entry  Mon Jul 21 10:30:01 2025, Selin, The 2D Energy Spectrum of Ca41 Screenshot_from_2025-07-21_08-51-09.png
Entry  Mon Oct 12 11:27:02 2015, Sarah Lonsdale, 05/10/15 - Set up notes 8x
Entry  Mon Oct 12 11:50:52 2015, Sarah Lonsdale, 05/10/15 Pulser, Wiring information and DAQ initial set up 2015-10-05_15.19.54.jpg2015-10-05_15.20.24.jpg2015-10-05_15.22.39.jpg2015-10-05_15.22.46.jpg
Entry  Mon Oct 12 12:04:51 2015, Sarah Lonsdale, 05/10/15 Photo of detector distances and layout 8x
ELOG V3.1.4-unknown