ID |
Date |
Author |
Subject |
Text |
|
74
|
Tue Apr 16 12:24:01 2024 |
Emmanuel | MWD amplitude (dE and E) | |
|
73
|
Mon Mar 25 12:57:30 2024 |
Clw | Adapters for ntof setup | 10 new Adapters for lemo to bnc on my desk |
|
72
|
Thu Dec 7 09:48:23 2023 |
Emmanuel | MWDdetector and User Input | MWDdetector and UserInput |
|
71
|
Mon Oct 2 08:53:06 2023 |
Emmanuel | Empty Frame | An empty frame (on the top) was placed
on Friday night. |
|
70
|
Thu Sep 28 15:32:16 2023 |
Emmanuel | LiF sample in | We switched from 10B target (number 1)
to LiF target (number 3). We planned to take
this measurement for one day. |
|
69
|
Wed Sep 27 09:54:06 2023 |
Emmanuel | 10B sample in | We switched from Aluminium target to Boron
Target (number 1) on Tuesday (26th of
Sept.). The Aluminium target was placed in |
|
68
|
Tue Sep 5 16:09:45 2023 |
Emmanuel | Drop in gain for DEED 14 | Dear all,
There was an issue with one of
the strips of the deltaE detector (DEED 14), |
|
67
|
Mon Aug 21 12:08:59 2023 |
TD | RAL108 +/-15V PSU test - JCMB 21.8.23 | PSU Calex
Setup, PSU and ac mains filter - attachments |
13x |
66
|
Sat Aug 19 14:14:26 2023 |
TD | RAL108 +/-15V PSU test - JCMB 18.8.23 | PSU Calex
Setup and PSU details - attachments 1-3
|
10x |
65
|
Thu Aug 17 10:26:51 2023 |
Nikolay Sosnin | Data Processing | To run raw2root on LXPLUS, you will need
to add the following line to your .bashrc,
performed using |
|
64
|
Tue Aug 15 11:41:27 2023 |
TD, NS | Monday 14 August - vacuum chamber pressure |
08.35 Vacuum chamber pressure OK - see attachment
1 |
|
63
|
Tue Aug 15 10:17:39 2023 |
TD, NS | RAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August | On the morning of Monday 14 August 2x RAL108
+/-15V PSUs were borrowed from the Edinburgh
equipment in the ISOLDE hall to check whether |
7x |
62
|
Mon Aug 14 11:00:13 2023 |
TD | RAL108 +/-15V PSU test in ISOLDE hall |
This morning 2x RAL108 +/-15V PSUs were borrowed
from the Edinburgh equipment in the ISOLDE |
13x |
61
|
Sat Aug 12 09:24:19 2023 |
Nikolay Sosnin | 26Al Protons | Here is a Google spreadsheet for counting
protons for the runs:
https://docs.google.com/spreadsheets/d/1INX8G9GAu-M70SdZdz55qXnMZNXKXLW7xfFH-eaLuQw/edit?usp=sharing |
|
60
|
Fri Aug 11 16:50:58 2023 |
Nikolay Sosnin | EDET24 | After inserting aluminium target, previously-dead
channel 24 on EDET was re-plugged into a
12-bit card SPD02872. It is the only EDET |
|
59
|
Fri Aug 11 13:16:56 2023 |
Nikolay Sosnin | E Front Incorrect Cabling | E front 2x16-way to 1x34-way IDC cable
from the Junction Box to the IDC-Lemo 00
adaptor was found to be inserted upside-down |
|
58
|
Fri Aug 11 13:06:54 2023 |
Annie | Signal Spreadsheet info | Spreadhseet made for shifters to manually
enter that they have checked each signal
and that they can see gamma-flashes. It is |
|
57
|
Fri Aug 11 10:12:02 2023 |
Annie | Pressure, voltage and current check | |
|
56
|
Fri Aug 11 10:02:08 2023 |
TD, NS, AR | Noise |
Check RAL108 +/-15V PSU
|
|
55
|
Fri Aug 11 09:17:28 2023 |
Annie | Li target scans | Processed scans of both sides of the Li
target showing the beam spot, and an image
showing what it looks like to the eye. |
|