AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 4 of 4  ELOG logo
Entry  Fri Oct 16 15:36:13 2015, Sarah Lonsdale, 06/10/15 Leakage, dE signal problem solving and external pulser trigger 6x
Entry  Fri Oct 16 15:41:14 2015, Sarah Lonsdale, 06/10/15 Changes to DAQ and pulser settings 2015-10-06_delay.jpg2015-10-06_trig.jpg
Entry  Fri Oct 16 15:56:01 2015, Sarah Lonsdale, 07/10/15 Alpha source in, change to pulser delay 6x
Entry  Fri Oct 16 16:01:41 2015, Sarah Lonsdale, 08/10/15 Removed source and sample, leakage current check 
Entry  Fri Oct 16 16:11:41 2015, Sarah Lonsdale, 09/10/15 Photos of detectors (reversed dE wiring) and upper level frame for future set up, leakage current 2015-10-09_09.16.16.jpg2015-10-09_09.16.22.jpg2015-10-09_09.29.23.jpg2015-10-09_09.29.35.jpg2015-10-09_09.30.02.jpg
Entry  Thu Jul 27 11:53:52 2023, TD, MSL type W1 detector data for 26Al(n,X) experiment EAR2, n_TOF 
Entry  Mon Aug 14 11:00:13 2023, TD, RAL108 +/-15V PSU test in ISOLDE hall 13x
Entry  Sat Aug 19 14:14:26 2023, TD, RAL108 +/-15V PSU test - JCMB 18.8.23 10x
Entry  Mon Aug 21 12:08:59 2023, TD, RAL108 +/-15V PSU test - JCMB 21.8.23 13x
Entry  Tue Aug 15 10:17:39 2023, TD, NS, RAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August 7x
Entry  Tue Aug 15 11:41:27 2023, TD, NS, Monday 14 August - vacuum chamber pressure 20230814_083514.jpg
Entry  Thu Aug 10 16:11:57 2023, TD, NS, AR, Noise 20230810_162959.JPGIMG_2906.jpeg20230810_164219.JPG
    Reply  Fri Aug 11 10:02:08 2023, TD, NS, AR, Noise 20230811_104233.jpg20230811_104253.jpg
ELOG V3.1.4-unknown