AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 1 of 5  ELOG logo
Entry  Thu Aug 10 16:11:57 2023, TD, NS, AR, Noise 20230810_162959.JPGIMG_2906.jpeg20230810_164219.JPG

Observe c. 2mV p to p noise with DSO ( Z_in = 50 Ohm ) c. 60us period with HF structure. DSO connected to junction box via 34-way IDC - 16x Lemo-00 adaptor.
    Reply  Fri Aug 11 10:02:08 2023, TD, NS, AR, Noise 20230811_104233.jpg20230811_104253.jpg

Check RAL108 +/-15V PSU
Entry  Tue Aug 15 10:17:39 2023, TD, NS, RAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August 7x
On the morning of Monday 14 August 2x RAL108 +/-15V PSUs were borrowed from the Edinburgh equipment in the ISOLDE hall to check whether the same transient

noise is observed at the +/-15V PSU outputs.
Entry  Tue Aug 15 11:41:27 2023, TD, NS, Monday 14 August - vacuum chamber pressure 20230814_083514.jpg

08.35 Vacuum chamber pressure OK - see attachment 1
Entry  Thu Jul 27 11:53:52 2023, TD, MSL type W1 detector data for 26Al(n,X) experiment EAR2, n_TOF 
MSL type W1(SS)-20

3186-9  20um Depletion voltage 3V Operating voltage 6V
Entry  Mon Aug 14 11:00:13 2023, TD, RAL108 +/-15V PSU test in ISOLDE hall 13x

This morning 2x RAL108 +/-15V PSUs were borrowed from the Edinburgh equipment in the ISOLDE hall to check whether the same transient noise is observed
at the +/-15V PSU 
Entry  Sat Aug 19 14:14:26 2023, TD, RAL108 +/-15V PSU test - JCMB 18.8.23 10x
PSU Calex

Setup and PSU details - attachments 1-3
Entry  Mon Aug 21 12:08:59 2023, TD, RAL108 +/-15V PSU test - JCMB 21.8.23 13x
PSU Calex

Setup, PSU and ac mains filter - attachments 1-3
Entry  Sat Sep 14 09:30:40 2024, TD, Neutron beam profile  20240914_101751.jpg

Neutron beam profile - film exposure overnight 12/13.9.24
Entry  Mon Sep 16 12:36:45 2024, TD, 34-way IDC to 37-way D connector ribbon cables 20240916_121057_(1).jpg20240916_121052_(1).jpg20240916_121047_(1).jpg20240916_121003_(1).jpg

The 2x sets of 34-way IDC to 37-way D connctor ribbon cables used at GSI for the two-alpha decay measurement have been located - see attachments 1-4.
Entry  Fri Jul 11 09:16:18 2025, TD, Silena 7710 Quad Bias Supply manual and internal configuration Silena_7710_quad_bias_supply.pdf
Manual - see attachment 1

Entry  Sat Jul 12 11:25:35 2025, Selin, The Detector Bias-Leakage Current Data Ca-VoltageCurrent.xlsx
This Excel sheet has the detector bias-leakage current data and plot for both detectors.

Detector 2 has lower leakage current and a flatter plateau region.
Entry  Sat Jul 12 11:34:31 2025, Selin, Detector-Cable Connections Detector-Cable.pdf
List of the detectors and the connections.
Entry  Wed Jul 16 08:51:06 2025, Selin, Run221136 Lithium Uncalibrated Data Li_Strip1.pngLi_Strip1_Par.pngLi_ded_2d.png
Plots of Lithium #3 run (221136) from the Ca41 campaign with the right voltage applied (11.07.2025).

1- Uncalibrated amplitude spectra of strip 1 (dedicated).

2- Uncalibrated amplitude spectra of strip 1 (parasitic).
Entry  Wed Jul 16 08:55:22 2025, Selin, Run221141 Boron Uncalibrated Data B_Strip1.pngB_ded_2d.pngB_Strip22.png
Plots of Boron #1 run (221141) from the Ca41 campaign with the right voltage applied (11.07.2025).

1- Uncalibrated amplitude spectra of strip 1 (dedicated).

2- Uncalibrated 2d energy plot of Boron dedicated data.
Entry  Wed Jul 16 11:45:39 2025, Selin, Boron Spectra Update After Setting Change + Pulser Removed B_Strip2_ded.pngB_Strip19_ded.png
Uncalibrated amplitude spectra of Boron (run221188) after the settings were changed, the pulser was removed, and the threshold in the UserInput has been
lowered. Both alphas can be seen in the front and back strips. The ratios between the alphas are similar for front (0.066) and back (0.063) strips.

1- Uncalibrated amplitude spectra of strip 2.
Entry  Mon Jul 21 10:30:01 2025, Selin, The 2D Energy Spectrum of Ca41 Screenshot_from_2025-07-21_08-51-09.png
The 2D energy spectrum of Ca41 (36 runs). The expected alpha energies are 4.8 MeV (alpha_0) and 2.7 MeV (alpha_1).
Entry  Mon Aug 4 16:32:56 2025, Selin, Lithium Consistency Check Li1-8.pngLi9-16.pngLi17-24.pngLi25-32.png
These are the consistency checks done for Lithium sample.

Please note that in the earlier runs, the cables 22 and 23 were switched.
Entry  Mon Aug 4 16:44:06 2025, Selin, Boron-1 Consistency Check B1-1-8.pngB1-9-16.pngB1-17-24.pngB1-25-32.png
These are the consistency checks done for Boron-1 sample.
Entry  Mon Aug 4 16:45:43 2025, Selin, Boron-3 Consistency Check B3-1-8.pngB3-9-16.pngB3-17-24.pngB3-25-32.png
These are the consistency checks done for Boron-3 sample.

Please note that the back strips for the first run are mismatched due to the settings in DAQ.
ELOG V3.1.4-unknown