|
ID |
Date |
Author |
Subject |
Text |
 |
|
52
|
Thu Aug 10 16:11:57 2023 |
TD, NS, AR | Noise |
Observe c. 2mV p to p noise with DSO ( Z_in
= 50 Ohm ) c. 60us period with HF structure. |
  |
|
56
|
Fri Aug 11 10:02:08 2023 |
TD, NS, AR | Noise |
Check RAL108 +/-15V PSU
|
 |
|
63
|
Tue Aug 15 10:17:39 2023 |
TD, NS | RAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August | On the morning of Monday 14 August 2x RAL108
+/-15V PSUs were borrowed from the Edinburgh
equipment in the ISOLDE hall to check whether |
7x |
|
64
|
Tue Aug 15 11:41:27 2023 |
TD, NS | Monday 14 August - vacuum chamber pressure |
08.35 Vacuum chamber pressure OK - see attachment
1 |
|
|
43
|
Thu Jul 27 11:53:52 2023 |
TD | MSL type W1 detector data for 26Al(n,X) experiment EAR2, n_TOF | MSL type W1(SS)-20
3186-9 20um Depletion voltage 3V Operating |
|
|
62
|
Mon Aug 14 11:00:13 2023 |
TD | RAL108 +/-15V PSU test in ISOLDE hall |
This morning 2x RAL108 +/-15V PSUs were borrowed
from the Edinburgh equipment in the ISOLDE |
13x |
|
66
|
Sat Aug 19 14:14:26 2023 |
TD | RAL108 +/-15V PSU test - JCMB 18.8.23 | PSU Calex
Setup and PSU details - attachments 1-3
|
10x |
|
67
|
Mon Aug 21 12:08:59 2023 |
TD | RAL108 +/-15V PSU test - JCMB 21.8.23 | PSU Calex
Setup, PSU and ac mains filter - attachments |
13x |
|
79
|
Sat Sep 14 09:30:40 2024 |
TD | Neutron beam profile |
Neutron beam profile - film exposure overnight
12/13.9.24 |
|
|
80
|
Mon Sep 16 12:36:45 2024 |
TD | 34-way IDC to 37-way D connector ribbon cables |
The 2x sets of 34-way IDC to 37-way D connctor
ribbon cables used at GSI for the two-alpha |
   |
|
85
|
Fri Jul 11 09:16:18 2025 |
TD | Silena 7710 Quad Bias Supply manual and internal configuration | Manual - see attachment 1
|
|
|
87
|
Sat Jul 12 11:25:35 2025 |
Selin | The Detector Bias-Leakage Current Data | This Excel sheet has the detector bias-leakage
current data and plot for both detectors.
Detector 2 has lower leakage current |
|
|
88
|
Sat Jul 12 11:34:31 2025 |
Selin | Detector-Cable Connections | List of the detectors and the connections. |
|
|
89
|
Wed Jul 16 08:51:06 2025 |
Selin | Run221136 Lithium Uncalibrated Data | Plots of Lithium #3 run (221136) from the
Ca41 campaign with the right voltage applied
(11.07.2025). |
  |
|
90
|
Wed Jul 16 08:55:22 2025 |
Selin | Run221141 Boron Uncalibrated Data | Plots of Boron #1 run (221141) from
the Ca41 campaign with the right voltage
applied (11.07.2025). |
  |
|
92
|
Wed Jul 16 11:45:39 2025 |
Selin | Boron Spectra Update After Setting Change + Pulser Removed | Uncalibrated amplitude spectra of Boron
(run221188) after the settings were changed,
the pulser was removed, and the threshold |
 |
|
95
|
Mon Jul 21 10:30:01 2025 |
Selin | The 2D Energy Spectrum of Ca41 | The 2D energy spectrum of Ca41 (36 runs). The
expected alpha energies are 4.8 MeV (alpha_0)
and 2.7 MeV (alpha_1). |
|
|
1
|
Mon Oct 12 11:27:02 2015 |
Sarah Lonsdale | 05/10/15 - Set up notes | |
8x |
|
2
|
Mon Oct 12 11:50:52 2015 |
Sarah Lonsdale | 05/10/15 Pulser, Wiring information and DAQ initial set up | |
   |
|
3
|
Mon Oct 12 12:04:51 2015 |
Sarah Lonsdale | 05/10/15 Photo of detector distances and layout | Fairly self explanatory, note that images
with time-stamps before 13.08.29 were taken
before fitting the o-ring on the flange and |
8x |