ID |
Date |
Author |
Subject |
Text |
 |
36
|
Sat Oct 8 11:56:49 2022 |
Nikolay Sosnin | Silicon Strips of Concern | DEED 6 and 9 no signal throughout the campaign.
EFED 27 high oscillations in baseline
throughout the campaign. |
|
37
|
Sat Oct 8 11:57:36 2022 |
Nikolay Sosnin | Change of Detector-Target Separation | Increased detector-target (LiF 3) separation
by 1.5 cm. Had to replace the support strut
under the detectors due to the previous one |
17x |
38
|
Sun Oct 9 20:57:54 2022 |
Nikolay Sosnin | Detectors in-beam, no target | After long beam-off, changed detector mount
by moving it 2 cm forward into the beam,
after removing LiF 3. |
12x |
40
|
Sun Oct 9 21:07:02 2022 |
Nikolay Sosnin | Boron Sample 3 Measurement | 21:15 Changed from detectors in-beam to
boron-10 sample 3 in-beam (in-beam measurement
got 1000 triggers, 500 of which were dedicated). |
14x |
44
|
Mon Jul 31 10:21:41 2023 |
Nikolay Sosnin | n_TOF Data and Filtering | |
|
50
|
Thu Aug 10 10:50:15 2023 |
Nikolay Sosnin | Al26 Chamber Cabling/Vacuum/NIM | |
23x |
51
|
Thu Aug 10 11:30:32 2023 |
Nikolay Sosnin | Silicons and LiF3+Gafchromic Target | |
18x |
59
|
Fri Aug 11 13:16:56 2023 |
Nikolay Sosnin | E Front Incorrect Cabling | E front 2x16-way to 1x34-way IDC cable
from the Junction Box to the IDC-Lemo 00
adaptor was found to be inserted upside-down |
|
60
|
Fri Aug 11 16:50:58 2023 |
Nikolay Sosnin | EDET24 | After inserting aluminium target, previously-dead
channel 24 on EDET was re-plugged into a
12-bit card SPD02872. It is the only EDET |
 |
61
|
Sat Aug 12 09:24:19 2023 |
Nikolay Sosnin | 26Al Protons | Here is a Google spreadsheet for counting
protons for the runs:
https://docs.google.com/spreadsheets/d/1INX8G9GAu-M70SdZdz55qXnMZNXKXLW7xfFH-eaLuQw/edit?usp=sharing |
|
65
|
Thu Aug 17 10:26:51 2023 |
Nikolay Sosnin | Data Processing | To run raw2root on LXPLUS, you will need
to add the following line to your .bashrc,
performed using |
|
28
|
Thu May 26 09:20:32 2022 |
Nick / Claudia | Inventory of Items at n_TOF for (n,cp) experiments | Detectors currently in the boxes:
2x MSL type W1(SS)-50, 2902-4 (53um),
2940-6 (55um) |
 |
76
|
Thu Sep 12 11:07:29 2024 |
Nick | 40K Borrowed Items | We borrowed from n_TOF:
1x O-ring for circular side-flanges
on the chamber (the borrowed part has a small |
|
78
|
Thu Sep 12 15:26:30 2024 |
Nick | EAR2 Periodic Noise | |
|
41
|
Mon Jul 3 13:01:30 2023 |
Emmanuel | Boxes for nTOF experiments to CERN | Box 1
1. RC412 Cables
2. Screws and parts for rails |
|
68
|
Tue Sep 5 16:09:45 2023 |
Emmanuel | Drop in gain for DEED 14 | Dear all,
There was an issue with one of
the strips of the deltaE detector (DEED 14), |
  |
69
|
Wed Sep 27 09:54:06 2023 |
Emmanuel | 10B sample in | We switched from Aluminium target to Boron
Target (number 1) on Tuesday (26th of
Sept.). The Aluminium target was placed in |
    |
70
|
Thu Sep 28 15:32:16 2023 |
Emmanuel | LiF sample in | We switched from 10B target (number 1)
to LiF target (number 3). We planned to take
this measurement for one day. |
   |
71
|
Mon Oct 2 08:53:06 2023 |
Emmanuel | Empty Frame | An empty frame (on the top) was placed
on Friday night. |
|
72
|
Thu Dec 7 09:48:23 2023 |
Emmanuel | MWDdetector and User Input | MWDdetector and UserInput |
 |