AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 4 of 4  ELOG logo
ID Date Authordown Subject Text Attachments
  74   Tue Apr 16 12:24:01 2024 EmmanuelMWD amplitude (dE and E)   26Al_PDF.pdf 
  82   Tue Mar 18 13:28:30 2025 EmmanuelB10 and LiF data with Fast Fourier TransformAttached is the B10 and LiF data with
Fast Fourier Transform and varying time
constants.
 B10.pdfLi.pdf 
  73   Mon Mar 25 12:57:30 2024 ClwAdapters for ntof setup10 new Adapters for lemo to bnc on my desk  20240325_125536.jpg20240325_125528.jpg 
  5   Tue Oct 13 21:04:49 2015 Claudia LedererPhotos of Test Setup 5-10 October 2015some photos in high resolution of the test
setup 5-10 October 2015
 DSC00042.JPGDSC00048.JPGDSC00056.JPGDSC00065.JPG 
  24   Tue Aug 23 15:34:38 2016 ClaudiaLeakage currents 23.08.16 E = 0.03uA
dE = 0.04uA
PHDI = 0.09uA
  
  29   Thu Oct 6 09:28:33 2022 ClaudiaItems to be replaced for next runMissing/broken items identified

- long rails for fixing chamber
on support
 20221005_122654.pdf 
  30   Thu Oct 6 09:34:30 2022 ClaudiaTest setup Photos and cablingSetup 5.10.22

dE 20 um (ID 2837-33) and 494 um
double sided (ID 1194-9)
 20221005_174742.jpg20221005_174759.jpg20221005_184752.jpg20221005_184801.jpg20221005_174742.jpg 
  42   Thu Jul 27 11:25:35 2023 ClaudiaAl-26 planning meeting summary
Start 9th August, access to EAR-2
11 am earliest but can start in rack area
before
Setup to be used: 1 dE
 DSC00366.JPGDSC00346.JPG 
  45   Thu Aug 10 09:10:02 2023 CLWDetector Setup Al26 Run 2023dE Detector: W1-20 3186-9 20 um

E Detector: W1-150 3458-4 144 um

Voltages and Leakage Currents:
 20230809_181749.jpg20230809_181758.jpg20230809_172545.jpg20230809_172442.jpg 
  46   Thu Aug 10 09:20:37 2023 CLWDetector Signal Cabling Al26 Aug 2023
delta
E detector Cabling


 8x 
  47   Thu Aug 10 09:55:50 2023 CLWPhotos of Chamber, Al26 Run Aug23   13x 
  48   Thu Aug 10 10:04:13 2023 CLWPhotos inside chamber Al26 run Aug2023   8x 
  49   Thu Aug 10 10:05:48 2023 CLWGafchromics FoilGafchromics foil was mounted on empty brass
frame back to back with Li sample

Neutron beam goes well through
 20230809_165433.jpg20230810_085457.jpg20230809_165436.jpg 
  81   Wed Feb 12 13:51:02 2025 CLWexpected counts B and LiThe rootfiles countsB.root and countsLi.root
contain histograms of count spectra that
would be expected at n_TOF for a 10B and
 6x 
  53   Fri Aug 11 08:41:31 2023 AnnieAl target & chamber set upPhtotos of the front & back of the
Al target and what it looked like once mounted
and in the chamber.
 15x 
  54   Fri Aug 11 09:11:04 2023 AnniePulse Settings   IMG_2908.JPGIMG_2909.JPGIMG_2910.JPGIMG_2911.JPG 
  55   Fri Aug 11 09:17:28 2023 AnnieLi target scansProcessed scans of both sides of the Li
target showing the beam spot, and an image
showing what it looks like to the eye.
 7Li_foil_side1_post_processed.pdf7Li_foil_side2_post_processed.pdfIMG_2914.JPG 
  57   Fri Aug 11 10:12:02 2023 AnniePressure, voltage and current check   IMG_2915.JPGIMG_2916.JPGIMG_2918.JPG 
  58   Fri Aug 11 13:06:54 2023 AnnieSignal Spreadsheet infoSpreadhseet made for shifters to manually
enter that they have checked each signal
and that they can see gamma-flashes. It is
 IMG_2920.JPGIMG_2921.JPGIMG_2922.JPG 
ELOG V3.1.4-unknown