Entry  Thu Aug 10 11:30:32 2023, Nikolay Sosnin, Silicons and LiF3+Gafchromic Target 18x
 
Entry  Thu Aug 10 10:50:15 2023, Nikolay Sosnin, Al26 Chamber Cabling/Vacuum/NIM 23x
 
Entry  Thu Aug 10 10:05:48 2023, CLW, Gafchromics Foil 20230809_165433.jpg20230810_085457.jpg20230809_165436.jpg
Gafchromics foil was mounted on empty brass frame back to back with Li sample

Neutron beam goes well through the sample. Centered ~1 cm from sample center. Conclusion: no changes needed (too risky to make it worse and it
is ok now)
Entry  Thu Aug 10 10:04:13 2023, CLW, Photos inside chamber Al26 run Aug2023 8x
 
Entry  Thu Aug 10 09:55:50 2023, CLW, Photos of Chamber, Al26 Run Aug23 13x
 
Entry  Thu Aug 10 09:20:37 2023, CLW, Detector Signal Cabling Al26 Aug 2023 8x

delta E detector Cabling


Lemo Box Output Number
Signal Cable Bunker
Patch Panel Number
Signal
Cable Rack Area
FADC Number
DAQ Channel




0
72
2204803
9
02911
DEED-1


1
73
2204804
10
02911
DEED-2


2
74
2204805
11
02911
DEED-3


3
75
2204806
12
02911
DEED-4


4
76
2204807
13
02914
DEED-5


5
77
2204808
14
02914
DEED-6


6
80
2204809
15
02914
DEED-7


7
81
2204810
16
02914
DEED-8


8
82
2204811
17
Entry  Thu Aug 10 09:10:02 2023, CLW, Detector Setup Al26 Run 2023 20230809_181749.jpg20230809_181758.jpg20230809_172545.jpg20230809_172442.jpg
dE Detector: W1-20 3186-9 20 um

E Detector: W1-150 3458-4 144 um

Voltages and Leakage Currents:
Entry  Mon Jul 31 10:21:41 2023, Nikolay Sosnin, n_TOF Data and Filtering Al26_Filtering.pptx
 
Entry  Thu Jul 27 11:53:52 2023, TD, MSL type W1 detector data for 26Al(n,X) experiment EAR2, n_TOF 
MSL type W1(SS)-20

3186-9  20um Depletion voltage 3V Operating voltage 6V
Entry  Thu Jul 27 11:25:35 2023, Claudia, Al-26 planning meeting summary DSC00366.JPGDSC00346.JPG

Start 9th August, access to EAR-2 11 am earliest but can start in rack area before
Setup to be used: 1 dE (16 strips, 20 um thickness)
+ 1 E (16x16 strips, 150 um thickness. We have a spare for each thickness
Sample and detectors to be mounted on the same flange


Things
to check:
Entry  Mon Jul 3 13:01:30 2023, Emmanuel, Boxes for nTOF experiments to CERN 
Box 1

1. RC412 Cables

2. Screws and parts for rails
Entry  Sun Oct 9 21:07:02 2022, Nikolay Sosnin, Boron Sample 3 Measurement 14x
21:15 Changed from detectors in-beam to boron-10 sample 3 in-beam (in-beam measurement got 1000 triggers, 500 of which were dedicated). The sample was
mounted identically to LiF 3. An attempt was made to replace the 20-micron dE detector with a 50-micron one, but the screwholes on the 50-micron detector
did not match the 300-micron E-detector ones and therefore could not be mounted. 20-micron detector was therefore re-attached. Planning to run for 12 hours
Entry  Sun Oct 9 20:57:54 2022, Nikolay Sosnin, Detectors in-beam, no target 12x
After long beam-off, changed detector mount by moving it 2 cm forward into the beam, after removing LiF 3.
Entry  Sat Oct 8 11:57:36 2022, Nikolay Sosnin, Change of Detector-Target Separation 17x
Increased detector-target (LiF 3) separation by 1.5 cm. Had to replace the support strut under the detectors due to the previous one being fuly retracted
even for minimal target-detector separation. This change may affect detector rotation relative to the target.
Entry  Sat Oct 8 11:56:49 2022, Nikolay Sosnin, Silicon Strips of Concern 
DEED 6 and 9 no signal throughout the campaign.

EFED 27 high oscillations in baseline throughout the campaign.
Entry  Fri Oct 7 20:04:30 2022, Nikolay Sosnin, Change of Pulser Setting 
The pulser has been switched from triggering from beam trigger to running at a 10 Hz rate, and will now appear in random places in signal traces. Planned
to run overnight measuring LiF3, switch to empty + detector in beam in the morning.
Entry  Fri Oct 7 17:17:08 2022, Nikolay Sosnin, Change of Pulser Delay 
Still using pulser triggered from protons. 12 microsecond delay from protons to gamma-flash + 11 microsecond delay from gamma flash to pulser. 20 mV
pulser output into 50 ohm impedance (10 mV final output) of both polarities (using two pulsers, one NE pulser and one BNC PB5 pulser). Changed pulser setting
to run with 11 microsecond delay for approx. 2 hour, then change to an overnight run with pulser running NOT triggered from beam.
Entry  Thu Oct 6 14:58:29 2022, Nikolay Sosnin, Change of Pulser Delay 
Still using pulser triggered from protons. 12 microsecond delay from protons to gamma-flash + 1.75 microsecond delay from gamma flash to pulser. 20 mV
pulser output into 50 ohm impedance (10 mV final output) of both polarities (using two pulsers, one NE pulser and one BNC PB5 pulser). Changed pulser setting
to run with 5 microsecond delay for approx. 1 hour, then change to 10 microsecond delay.
Entry  Thu Oct 6 11:45:39 2022, Nikolay Sosnin, Assembly Setup Days 1 and 2 25x
Photographs of assembly up to the first pulser test with LiF3.
Entry  Thu Oct 6 11:07:47 2022, Nikolay Sosnin, Change of sample/Addition of pulser 
Changed from LiF 4 to LiF 3 after running with LiF 4 overnight (run title on n_TOF DAQ was not updated to refelect the change, and still says LiF 4,
but the material setting of the run states correctly that hte run is with LiF 3).

Added pulser triggered from protons. 12 microsecond delay from protons to gamma-flash + 1.75 microsecond delay from gamma flash to pulser. 20