Thu Aug 10 16:11:57 2023, TD, NS, AR, Noise  
|
Observe c. 2mV p to p noise with DSO ( Z_in = 50 Ohm ) c. 60us period with HF structure. DSO connected to junction box via 34-way IDC - 16x Lemo-00 adaptor.
|
Fri Aug 11 10:02:08 2023, TD, NS, AR, Noise 
|
Check RAL108 +/-15V PSU
|
Fri Aug 11 09:17:28 2023, Annie, Li target scans  
|
Processed scans of both sides of the Li target showing the beam spot, and an image showing what it looks like to the eye. |
Fri Aug 11 09:11:04 2023, Annie, Pulse Settings   
|
|
Fri Aug 11 08:41:31 2023, Annie, Al target & chamber set up 15x
|
Phtotos of the front & back of the Al target and what it looked like once mounted and in the chamber. |
Thu Aug 10 11:30:32 2023, Nikolay Sosnin, Silicons and LiF3+Gafchromic Target 18x
|
|
Thu Aug 10 10:50:15 2023, Nikolay Sosnin, Al26 Chamber Cabling/Vacuum/NIM 23x
|
|
Thu Aug 10 10:05:48 2023, CLW, Gafchromics Foil  
|
Gafchromics foil was mounted on empty brass frame back to back with Li sample
Neutron beam goes well through the sample. Centered ~1 cm from sample center. Conclusion: no changes needed (too risky to make it worse and it
is ok now) |
Thu Aug 10 10:04:13 2023, CLW, Photos inside chamber Al26 run Aug2023 8x
|
|
Thu Aug 10 09:55:50 2023, CLW, Photos of Chamber, Al26 Run Aug23 13x
|
|
Thu Aug 10 09:20:37 2023, CLW, Detector Signal Cabling Al26 Aug 2023 8x
|
delta E detector Cabling
Lemo Box Output Number
Signal Cable Bunker
Patch Panel Number
Signal
Cable Rack Area
FADC Number
DAQ Channel
0
72
2204803
9
02911
DEED-1
1
73
2204804
10
02911
DEED-2
2
74
2204805
11
02911
DEED-3
3
75
2204806
12
02911
DEED-4
4
76
2204807
13
02914
DEED-5
5
77
2204808
14
02914
DEED-6
6
80
2204809
15
02914
DEED-7
7
81
2204810
16
02914
DEED-8
8
82
2204811
17 |
Thu Aug 10 09:10:02 2023, CLW, Detector Setup Al26 Run 2023   
|
dE Detector: W1-20 3186-9 20 um
E Detector: W1-150 3458-4 144 um
Voltages and Leakage Currents: |
Mon Jul 31 10:21:41 2023, Nikolay Sosnin, n_TOF Data and Filtering
|
|
Thu Jul 27 11:53:52 2023, TD, MSL type W1 detector data for 26Al(n,X) experiment EAR2, n_TOF
|
MSL type W1(SS)-20
3186-9 20um Depletion voltage 3V Operating voltage 6V
|
Thu Jul 27 11:25:35 2023, Claudia, Al-26 planning meeting summary 
|
Start 9th August, access to EAR-2 11 am earliest but can start in rack area before
Setup to be used: 1 dE (16 strips, 20 um thickness)
+ 1 E (16x16 strips, 150 um thickness. We have a spare for each thickness
Sample and detectors to be mounted on the same flange
Things
to check: |
Mon Jul 3 13:01:30 2023, Emmanuel, Boxes for nTOF experiments to CERN
|
Box 1
1. RC412 Cables
2. Screws and parts for rails |
Sun Oct 9 21:07:02 2022, Nikolay Sosnin, Boron Sample 3 Measurement 14x
|
21:15 Changed from detectors in-beam to boron-10 sample 3 in-beam (in-beam measurement got 1000 triggers, 500 of which were dedicated). The sample was
mounted identically to LiF 3. An attempt was made to replace the 20-micron dE detector with a 50-micron one, but the screwholes on the 50-micron detector
did not match the 300-micron E-detector ones and therefore could not be mounted. 20-micron detector was therefore re-attached. Planning to run for 12 hours |
Sun Oct 9 20:57:54 2022, Nikolay Sosnin, Detectors in-beam, no target 12x
|
After long beam-off, changed detector mount by moving it 2 cm forward into the beam, after removing LiF 3. |
Sat Oct 8 11:57:36 2022, Nikolay Sosnin, Change of Detector-Target Separation 17x
|
Increased detector-target (LiF 3) separation by 1.5 cm. Had to replace the support strut under the detectors due to the previous one being fuly retracted
even for minimal target-detector separation. This change may affect detector rotation relative to the target. |
Sat Oct 8 11:56:49 2022, Nikolay Sosnin, Silicon Strips of Concern
|
DEED 6 and 9 no signal throughout the campaign.
EFED 27 high oscillations in baseline throughout the campaign. |
Fri Oct 7 20:04:30 2022, Nikolay Sosnin, Change of Pulser Setting
|
The pulser has been switched from triggering from beam trigger to running at a 10 Hz rate, and will now appear in random places in signal traces. Planned