  42   Thu Jul 27 11:25:35 2023 ClaudiaAl-26 planning meeting summary
Start 9th August, access to EAR-2
11 am earliest but can start in rack area
before
Setup to be used: 1 dE
 DSC00366.JPGDSC00346.JPG 
  43   Thu Jul 27 11:53:52 2023 TDMSL type W1 detector data for 26Al(n,X) experiment EAR2, n_TOFMSL type W1(SS)-20

3186-9  20um Depletion voltage 3V Operating
  
  44   Mon Jul 31 10:21:41 2023 Nikolay Sosninn_TOF Data and Filtering   Al26_Filtering.pptx 
  45   Thu Aug 10 09:10:02 2023 CLWDetector Setup Al26 Run 2023dE Detector: W1-20 3186-9 20 um

E Detector: W1-150 3458-4 144 um

Voltages and Leakage Currents:
 20230809_181749.jpg20230809_181758.jpg20230809_172545.jpg20230809_172442.jpg 
  46   Thu Aug 10 09:20:37 2023 CLWDetector Signal Cabling Al26 Aug 2023
delta
E detector Cabling


 8x 
  47   Thu Aug 10 09:55:50 2023 CLWPhotos of Chamber, Al26 Run Aug23   13x 
  48   Thu Aug 10 10:04:13 2023 CLWPhotos inside chamber Al26 run Aug2023   8x 
  49   Thu Aug 10 10:05:48 2023 CLWGafchromics FoilGafchromics foil was mounted on empty brass
frame back to back with Li sample

Neutron beam goes well through
 20230809_165433.jpg20230810_085457.jpg20230809_165436.jpg 
  50   Thu Aug 10 10:50:15 2023 Nikolay SosninAl26 Chamber Cabling/Vacuum/NIM   23x 
  51   Thu Aug 10 11:30:32 2023 Nikolay SosninSilicons and LiF3+Gafchromic Target   18x 
  52   Thu Aug 10 16:11:57 2023 TD, NS, ARNoise
Observe c. 2mV p to p noise with DSO ( Z_in
= 50 Ohm ) c. 60us period with HF structure.
 20230810_162959.JPGIMG_2906.jpeg20230810_164219.JPG 
  53   Fri Aug 11 08:41:31 2023 AnnieAl target & chamber set upPhtotos of the front & back of the
Al target and what it looked like once mounted
and in the chamber.
 15x 
  54   Fri Aug 11 09:11:04 2023 AnniePulse Settings   IMG_2908.JPGIMG_2909.JPGIMG_2910.JPGIMG_2911.JPG 
  55   Fri Aug 11 09:17:28 2023 AnnieLi target scansProcessed scans of both sides of the Li
target showing the beam spot, and an image
showing what it looks like to the eye.
 7Li_foil_side1_post_processed.pdf7Li_foil_side2_post_processed.pdfIMG_2914.JPG 
  56   Fri Aug 11 10:02:08 2023 TD, NS, ARNoise
Check RAL108 +/-15V PSU
 20230811_104233.jpg20230811_104253.jpg 
  57   Fri Aug 11 10:12:02 2023 AnniePressure, voltage and current check   IMG_2915.JPGIMG_2916.JPGIMG_2918.JPG 
  58   Fri Aug 11 13:06:54 2023 AnnieSignal Spreadsheet infoSpreadhseet made for shifters to manually
enter that they have checked each signal
and that they can see gamma-flashes. It is
 IMG_2920.JPGIMG_2921.JPGIMG_2922.JPG 
  59   Fri Aug 11 13:16:56 2023 Nikolay SosninE Front Incorrect CablingE front 2x16-way to 1x34-way IDC cable
from the Junction Box to the IDC-Lemo 00
adaptor was found to be inserted upside-down
  
  60   Fri Aug 11 16:50:58 2023 Nikolay SosninEDET24After inserting aluminium target, previously-dead
channel 24 on EDET was re-plugged into a
12-bit card SPD02872. It is the only EDET
 EDET24_Card.JPGEDET24_Cable.JPG 
  61   Sat Aug 12 09:24:19 2023 Nikolay Sosnin26Al ProtonsHere is a Google spreadsheet for counting
protons for the runs:

https://docs.google.com/spreadsheets/d/1INX8G9GAu-M70SdZdz55qXnMZNXKXLW7xfFH-eaLuQw/edit?usp=sharing
  