ID |
Date |
Author |
Subject |
Text |
|
19
|
Wed Aug 3 14:48:09 2016 |
Sarah | Leakage currents 02.08 - 03.08 | 02.08:
dE = 0.03 uA
E = 0.03 uA |
|
25
|
Fri Sep 2 12:01:57 2016 |
Sarah | Leakage currents 02.09.16 | E 0.03
dE 0.05
PHDI 0.12 |
|
20
|
Mon Aug 8 11:02:13 2016 |
Sarah | Leakage currents 08.08.16 | E 0.03 uA
dE 0.04 uA
PHDI 0.05 uA |
|
21
|
Tue Aug 9 15:57:52 2016 |
Sarah | Leakage currents 09.08.16 | Morning - 9am
E= 0.03uA
dE= 0.04uA |
|
27
|
Fri Sep 9 10:01:18 2016 |
Sarah | Leakage currents 09.09.16 | EFED 0.04uA
DEED 0.05uA
PHDI 0.13uA |
|
22
|
Thu Aug 11 08:19:37 2016 |
Sarah | Leakage currents 10.8.16 | At lunchtime (12.45)
E = 0.03 uA
dE = 0.04 uA |
|
23
|
Wed Aug 17 15:10:05 2016 |
Sarah | Leakage currents 12.08.16 | E = 0.03uA
dE = 0.04uA
PHDI = 0.06uA |
|
24
|
Tue Aug 23 15:34:38 2016 |
Claudia | Leakage currents 23.08.16 | E = 0.03uA
dE = 0.04uA
PHDI = 0.09uA |
|
17
|
Tue Aug 2 08:14:26 2016 |
Sarah | Leakage currents spreadsheet (26/07- 01/08) | Steady for dE, E. Possibly rising
on PHDI- monitor closely. |
|
55
|
Fri Aug 11 09:17:28 2023 |
Annie | Li target scans | Processed scans of both sides of the Li
target showing the beam spot, and an image
showing what it looks like to the eye. |
|
70
|
Thu Sep 28 15:32:16 2023 |
Emmanuel | LiF sample in | We switched from 10B target (number 1)
to LiF target (number 3). We planned to take
this measurement for one day. |
|
12
|
Thu Jul 28 16:00:43 2016 |
Sarah | List of to-dos | Process alpha data
- Compare pulser width and alpha width
to calibration spectra (shaping amp with |
|
43
|
Thu Jul 27 11:53:52 2023 |
TD | MSL type W1 detector data for 26Al(n,X) experiment EAR2, n_TOF | MSL type W1(SS)-20
3186-9 20um Depletion voltage 3V Operating |
|
74
|
Tue Apr 16 12:24:01 2024 |
Emmanuel | MWD amplitude (dE and E) | |
|
72
|
Thu Dec 7 09:48:23 2023 |
Emmanuel | MWDdetector and User Input | MWDdetector and UserInput |
|
64
|
Tue Aug 15 11:41:27 2023 |
TD, NS | Monday 14 August - vacuum chamber pressure |
08.35 Vacuum chamber pressure OK - see attachment
1 |
|
52
|
Thu Aug 10 16:11:57 2023 |
TD, NS, AR | Noise |
Observe c. 2mV p to p noise with DSO ( Z_in
= 50 Ohm ) c. 60us period with HF structure. |
|
56
|
Fri Aug 11 10:02:08 2023 |
TD, NS, AR | Noise |
Check RAL108 +/-15V PSU
|
|
48
|
Thu Aug 10 10:04:13 2023 |
CLW | Photos inside chamber Al26 run Aug2023 | |
8x |
47
|
Thu Aug 10 09:55:50 2023 |
CLW | Photos of Chamber, Al26 Run Aug23 | |
13x |