AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 4 of 4  ELOG logo
Entry  Tue Oct 13 21:04:49 2015, Claudia Lederer, Photos of Test Setup 5-10 October 2015 DSC00042.JPGDSC00048.JPGDSC00056.JPGDSC00065.JPG
Entry  Fri Aug 11 10:12:02 2023, Annie, Pressure, voltage and current check IMG_2915.JPGIMG_2916.JPGIMG_2918.JPG
Entry  Fri Aug 11 09:11:04 2023, Annie, Pulse Settings IMG_2908.JPGIMG_2909.JPGIMG_2910.JPGIMG_2911.JPG
Entry  Sat Aug 19 14:14:26 2023, TD, RAL108 +/-15V PSU test - JCMB 18.8.23 10x
Entry  Mon Aug 21 12:08:59 2023, TD, RAL108 +/-15V PSU test - JCMB 21.8.23 13x
Entry  Tue Aug 15 10:17:39 2023, TD, NS, RAL108 +/-15V PSU test at EAR2, n_TOF Monday 14 August 7x
Entry  Mon Aug 14 11:00:13 2023, TD, RAL108 +/-15V PSU test in ISOLDE hall 13x
Entry  Fri Sep 2 12:03:40 2016, Sarah, SPD card changed 
Entry  Fri Aug 11 13:06:54 2023, Annie, Signal Spreadsheet info IMG_2920.JPGIMG_2921.JPGIMG_2922.JPG
Entry  Sat Oct 8 11:56:49 2022, Nikolay Sosnin, Silicon Strips of Concern 
Entry  Thu Aug 10 11:30:32 2023, Nikolay Sosnin, Silicons and LiF3+Gafchromic Target 18x
Entry  Thu Oct 6 09:34:30 2022, Claudia, Test setup Photos and cabling 20221005_174742.jpg20221005_174759.jpg20221005_184752.jpg20221005_184801.jpg20221005_174742.jpg
Entry  Mon Jul 31 10:21:41 2023, Nikolay Sosnin, n_TOF Data and Filtering Al26_Filtering.pptx
ELOG V3.1.4-unknown