  138   Thu Jan 7 13:55:24 2016 CGRIKEN progress - 15/12/15 (late) Tues 15/12/15
Swapped previously tripped detector
(3131-11) on to kaptons already in place
 AIDA_measurements_-_Dec2015.pdfAIDA_measurements_-_Dec2015.pptx 
  137   Wed Jan 6 16:06:32 2016 CG, TD, PJCSReport: Low - RPi power cable can't be fully inserted due to case conflict - solved


   
        
            
  
  136   Tue Dec 15 11:17:05 2015 TDSTFC DL tests - 14-15.12.15BNC PB-5 Pulser

Fall time 1.0ms
 13x 
  135   Mon Dec 14 19:25:35 2015 AE, CG ,PhongMerger/TapeServer trouble reportSat. 12/12/15

Working with a 8-FEE setup (as in https://elog.ph.ed.ac.uk/AIDA/133).
 master_no_data_transfer.pngmaster_no_data_transfer.pngerror_when_stop_daq_merger_running.pngerror_show_1_3_8_kaput.pngout_term.txt 
  134   Mon Dec 14 07:56:27 2015 CGRIKEN progress13/12/15
Current jumper setup:
     - detector
 10x 
  133   Sat Dec 12 03:30:50 2015 Alfred, Chris, Phongchange configuration of NNAIDA modules in setupWe want to reduce the configuration of
the setup to 4 FEE cards (8 NNAIDA modules),
so we only have to isolate 4 of them from
  
  132   Sat Dec 12 02:12:17 2015 CG, AE, VHRIKEN progressStripped down contents of AIDA NIM bins
to only what is required by AIDA.
Now have BNC PB-5 pulser, sum and
 9x 
  131   Thu Dec 10 04:56:08 2015 CG, AERIKEN progress - first day and a half08/12/15 - Day 0.5
Test fitted new snout to snout base
     - the holes
 2015-12-08_16.19.16.jpg2015-12-08_16.16.30.jpg 
  130   Thu Dec 3 16:28:46 2015 CG, TDNew Kapton cable tests at DLSpent whole day trying to isolate mezzanines
from cooling crate.
Finally managed to increase resistance
 18x 
  129   Thu Dec 3 10:12:08 2015 CG, TDReport: Low - RPi power cable can't be fully inserted due to case conflictThe RPi power cable cannot sit fully in
the connector, and the lock pins can't engage,
because the case gets in the way of the plastic
  
  128   Wed Dec 2 18:39:44 2015 CGNew Kapton cable tests at DLPowered on system ok.
Electrical connection between crate
and mezzanines still persists, but only to
 nnaida14_wav_noHVnoDetNoShielding.pngnnaida14_wav_noHVnoDetWithShielding.pngall1.8.L_noDetShaping2us.png 
  127   Thu Nov 26 16:32:52 2015 CG, TDNew Kapton cable tests at DLPowered on system without issue. biased
detector to -200V. Leakage current not stable,
bouncing around between ~3.66 - 3.74uA. Room
 9x 
  126   Wed Nov 25 19:24:39 2015 CG, TD, PJCSNew Kapton cable tests at DLPowered system on and biased to +200V at
room temp of 22.4oC. Leakage current of 3.37uA.
Waveforms very noisy and spectra
 6x 
  125   Fri Nov 20 16:29:49 2015 CGNew Kapton cable tests at DLPowered system up from state it was left
in last night. Biased to +200V with leakage
current 3.9uA @ room temp 23.3oC.
 nnaida14_goodGNDbetweenAll.png 
  124   Thu Nov 19 17:31:24 2015 CG, TDNew Kapton cable tests at DLPowered system on from the state it was
in last night. Biased to +200V with leakage
current 3.9uA at room temp 22.8oC.
 nnaida11_wav.pngIMG_20151119_162831.jpg 
  123   Thu Nov 19 12:23:03 2015 CG, TDReport: Low - Error message when selecting Act on all FEE64s for FADC calibrateWhen trying to calibrate FADCs in FADC
Align and Control page, ticked 'Act on ALL
FEE64 modules'.
 FADC_actOnAll.png 
  122   Thu Nov 19 12:19:15 2015 CG, TDReport: Low - nnaida12 ASIC4 not functioningCurrent nnaida12 (MAC address 2b:09:e8)
has several noisy channels in ASICs 1-3,
whilst ASIC4 does not work at all.
 nnaida12_stats.pngnnaida12_ASIC4_checkError.png 
  121   Wed Nov 18 18:18:26 2015 CG, TDNew Kapton cable tests at DLNote: kapton #7 may have broken pins next
to (deliberately) broken ground pin. Unclear,
but should not be used for bias until certain.
 nnaida11_noJumpers.pngnnaida14_detectorGNDjumper.pngnnaida14_shortDrainWires.pngnnaida14_shortDrainWiresSinglePoint_8us.pngIMG_20151118_164436.jpg 
  120   Sat Nov 14 20:19:43 2015 CG, TD, PJCS13 Nov 2015 - new Kapton cable tests at DL

    

       
            
  
  119   Fri Nov 13 16:17:14 2015 CG, TD13 Nov 2015 - new Kapton cable tests at DLPowered system up with 4 bare 45cm kaptons
connected and nothing seems to have changed
from where we left last night
 6x 