AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 40 of 44  ELOG logo
Entry  Sun May 3 01:32:18 2015, JA, TD, AE, CG, VP & JLT, Sunday 3 May 2015 
Entry  Sat May 2 19:20:59 2015, AE, run R51 online spectra ADClow_vs_Ch_R51online.pngADChigh_vs_Ch_R51online.pngX_implant_R51online.pngE_implant_R51online.pngTraking_implant_R51online.png
Entry  Sat May 2 19:17:25 2015, AE, time-stamp for event reconstruction time_stamp_dist_disc.pngevt_time_stamp_disc_R51.pngXY_implant_disc_R51.pngevt_time_stamp_slowcomp_R51.pngXY_implant_slowcomp_R51.png
Entry  Sat May 2 14:41:20 2015, JA, TD, AE, CG, VP & JLT, MUSIC detector signals MUSIC_lowE.pngMUSIC_highE_log.png
Entry  Sat May 2 02:04:50 2015, JA, TD, AE, CG, VP & JLT, Saturday 2 May 2015 50x
Entry  Thu Apr 30 15:28:25 2015, Patrick Coleman-Smith, High Energy Spectra from LYCCA with pulser LYCCA_High_Energy.png
    Reply  Thu Apr 30 17:43:36 2015, Patrick Coleman-Smith, High Energy Spectra from LYCCA with pulser 
       Reply  Thu Apr 30 20:21:20 2015, Patrick Coleman-Smith, High Energy Spectra from LYCCA with pulser 
Entry  Thu Apr 30 16:20:54 2015, JA, LHB, TD, AE, CG & VP, Friday 1 May 2015 
Entry  Thu Apr 30 03:00:48 2015, TD, Degrader changes 
Entry  Thu Apr 30 02:11:19 2015, TD, Example waveforms with heavy-ion beam 7x
Entry  Thu Apr 30 01:06:44 2015, JA, LHB, TD, AE, CG & VP, Thursday 30 April 2015 16x
Entry  Wed Apr 29 18:12:02 2015, AE, online analysis code 8x
Entry  Wed Apr 29 11:34:09 2015, Patrick Coleman-Smith, Fast Trigger timings against Pulser Input and LEC/MEC Fast Comparator threshold setting 
Entry  Wed Apr 29 11:00:29 2015, TD, Wednesday 29 April 2015 - R20 screenshots 10x
Entry  Wed Apr 29 10:01:27 2015, Patrick Coleman-Smith, Fast Trigger output fault in FEE64 FPGA logic 
Entry  Wed Apr 29 01:03:41 2015, JA, LHB, TD, AE, CG & VP, Wednesday 29 April 2015 16x
Entry  Tue Apr 28 11:22:25 2015, VP, RPI 
Entry  Tue Apr 28 06:25:13 2015, JA, LHB, TD, AE & CG, Tuesday 28th April progress 6x
Entry  Tue Apr 28 05:59:48 2015, AE, "beta" trigger from MACB Trigger outputs 6x
Entry  Mon Apr 27 04:54:02 2015, VFEP & TD, [How To] Remote control of CAEN N1419 Programmable HV Power Supply N1419_rev4.pdf30.png
Entry  Mon Apr 27 01:48:59 2015, JA, LHB, TD, VP, AE & CG, Monday 27 April 2015 8x
ELOG V3.1.4-unknown