  547   Thu Mar 30 16:12:21 2017 DK, OH, CGFriday, March 31 run status00:11 BigRIPS has started a new run at 00:10:42
run 0165.
      AIDA subrun R16_357 was about halfway
 14x 
  22   Thu Jan 22 13:50:33 2015 Alfredo and TomFurther measurements with filtered PSUJan 20, 2015

Test settings: DSSD biased at 100V, with
  
  840   Thu Jun 13 05:49:37 2019 CAFurther tests of calibration on Alpha dataAlpha data used: /May19/{R1,R2,R7,R8,R9,R11}
(c. 380 hr.)
 27x 
  288   Tue Jun 7 05:48:13 2016 TD, AE, ML & PJWHEC spectra & implant profile
DSSSD#1 and DSSSD#6 ADC hit patterns (profile)
and 1*H (ASIC#1 20GeV FSR) energy spectra
 30.png36.png40.png 
  790   Fri Nov 16 06:01:47 2018 CAHigh Energy Channel Ex vs Ey for different degrader thicknesses15.04 Plots of X Energy vs Y Energy for each
detector, and for 4 different Al degrader
thicknesses, as indicated
 2_3HECexey.png2_8HECexey.png3_0HECexey.png3_3HECexey.png 
  86   Thu Apr 30 15:28:25 2015 Patrick Coleman-SmithHigh Energy Spectra from LYCCA with pulserI have an eight FEE64 system now in place
on the LYCCA chamber with a PB-5 pulser going
into the adapter cards test input. The test
 LYCCA_High_Energy.png 
  88   Thu Apr 30 17:43:36 2015 Patrick Coleman-SmithHigh Energy Spectra from LYCCA with pulserI have an eight FEE64 system now in place
on the LYCCA chamber with a PB-5 pulser going
into the adapter cards 
  
  89   Thu Apr 30 20:21:20 2015 Patrick Coleman-SmithHigh Energy Spectra from LYCCA with pulser> I have an eight FEE64 system now in place
on the LYCCA chamber with a PB-5 pulser going
into the adapter cards 
  
  30   Tue Feb 10 16:01:50 2015 Chris Griffin, Alfredo EstradeHigh data rate - Pause/Resume06/02/15
 A look at the data rate at
which Pause/Resumes start to cause missing
 6x 
  894   Sat Sep 30 16:37:06 2023 TDHoneywell HSS-DPS fault
The Honeywell HSS-DPS dew point sensor indicator
( red LED ) is flashing c. 0.5Hz indicating
  
  42   Fri Feb 20 10:48:09 2015 TDHow To Connect the FEE64 System Console Using PuTTY
Set permissions for the USB-serial device
using the command
  
  98   Mon May 4 02:32:29 2015 VFEP & TDHow to fix DAQ stalls at GOIt has been observed that when starting the
AIDA data acquisition (select 'GO' from the
'Data Acquisition Run
  
  307   Sat Jun 11 13:57:09 2016 lauraHow to monitor and check synchronisation of FEESAlfredo has written a program to check
the synchronisation of the FEES, which need
to be checked regularly
 eg1.pngeg2.pngeg3.pngeg4.png 
  31   Sun Feb 15 06:12:00 2015 TD, AEV & CGHow to mount USB disk with NTFS
Mount external USB expansion disk with NTFS
filesystems 
  
  20   Wed Dec 3 12:13:03 2014 Alfredo EstradeIV curve with CAEN N1419Measured IV curve for BB18 DSSD with new CAEN
HV supply. Settings as in previous elog entry:
 IV_dec14.PNG 
  372   Thu Oct 6 12:39:14 2016 TDImages of setup at F11   IMG_6687.JPGIMG_6689.JPGIMG_6690.JPG 
  373   Thu Oct 6 13:09:50 2016 TDImages of setup at F11 - 2   IMG_6692.JPGIMG_6693.JPGIMG_6694.JPG 
  375   Thu Oct 6 13:20:34 2016 TDImages of setup at F11 - 3   IMG_6695.JPGIMG_6696.JPGIMG_6701.JPG 
  377   Thu Oct 6 13:22:24 2016 TDImages of setup at F11 - 4   IMG_6702.JPG 
  502   Wed Nov 30 06:31:04 2016 PV, TD, RCF, LiuImplantation profile in AIDA R39 2 to 9, after changing degrader at 13:30Degrader setting was:
Variable degrader:
0.5 mm W + 1 mm Al : in
 29.png22.png12.png 