621
|
Thu Jun 1 08:49:39 2017 |
LHB, PV | Thursday 1 June Evening Shift | 16.44 DAQ stop BigRIPS, BRIKEN
AIDA file RIBF127R1/R1_886
|
27x |
|
619
|
Wed May 31 16:48:54 2017 |
TD | Thursday 1 June 00.00-08.00 | 00.48 BigRIPS DAQ now running
BRIKEN start run 48
|
42x |
|
508
|
Wed Nov 30 21:26:52 2016 |
CG, DK, TD | Thursday 1 December | 00.51 BigRIPS data file 1112.
01.50 BigRIPS data file 1113.
|
10x |
|
298
|
Wed Jun 8 20:56:28 2016 |
CG | Thurs 9th June | 04.45 Lowered slow comp threshold on all FEEs
bar nnaida24 to 8 (nnaida24 @ 12).
Fast comp thresh @ 6 on all nnaida.
|
6x |
|
643
|
Wed Jun 7 16:04:42 2017 |
ZL, DK | Thurs 8 June 0:00~8:00 | 00:05 Shift change.
Primary beam current ~4800 enA, 238U^86+
so 50 to 60 pnA.
|
13x |
|
40
|
Thu Feb 19 08:21:33 2015 |
CG, AE, TD | Thrus 19th Feb progress | 19/02/15
1000: Check system gives same resolution
as yesterday, removing only the Cu braiding |
39x |
|
947
|
Tue Apr 1 15:34:16 2025 |
TD, MR, CU | Tests of new AIDA ASIC mezzanines - 2024 production batch |
Tests of new AIDA ASIC mezzanines - 2024
production batch
|
11x |
|
805
|
Sun May 19 02:21:43 2019 |
CA | Tests of low energy calibration on Alpha Data | 10.23 Low energy calibration program now produces
relative gain coefficients in a format that
can be used with AIDASort
|
25x |
|
845
|
Sun Jun 16 04:50:03 2019 |
CA | Tests of calibration on beta data | Analysis of RIBF148/R5_170_190, with 500 <
E < 1000 keV energy cut
|
25x |
|
111
|
Wed Jul 1 16:42:39 2015 |
Patrick Coleman-Smith | Testing Version 8 | I have installed Version 8 of the AidaExec
program and FEE_GF_Feb15_6.bin for the VHDL
on the system in T9. |
|
|
891
|
Thu Aug 31 15:01:11 2023 |
TD | Test of CAEN N1419B - T9, STFC DL |
Noise test of CAEN N1419B in T9, STFC DL.
|
7x |
|
870
|
Fri Jul 7 10:52:34 2023 |
TD, PJCS | Test of AIDA FEE64 d8:80:39:42:0d:0b ( aida03 ) - ASIC mezzanine replaced |
Test of AIDA FEE64 d8:80:39:42:0d:0b ( aida03
) - ASIC mezzanine replaced
|
16x |
|
869
|
Fri Jul 7 10:15:09 2023 |
TD | Test of AIDA FEE64 d8:80:39:41:f6:ee ( aida01 ) - HDMI connector replaced |
Test of AIDA FEE64 d8:80:39:41:f6:ee ( aida01
) - HDMI connector replaced. Cooling plate |
17x |
|
871
|
Fri Jul 7 11:59:06 2023 |
TD | Test of AIDA FEE64 - summary | Test of AIDA FEE64s
ISOL test station STFC DL, T9
|
11x |
|
890
|
Wed Aug 30 15:30:50 2023 |
TD | Test of AIDA ASIC mezzanines with FEE64s - summary | Test of ( previously bench-tested OK ) AIDA
ASIC mezzanines using FEE64 nnlycca5 ( MAC
d8:80:39:41:d7:c3 )
|
13x |
|
943
|
Thu Mar 28 11:10:09 2024 |
TD | Test of 4x FEE64s at AIDA test station, T9, STFC DL | Test of 4x FEE64s at AIDA test station, T9,
STFC DL
|
22x |
|
918
|
Tue Nov 14 17:19:11 2023 |
TD | TapeServer, Merger, NetVar etc status | |
   |
|
293
|
Wed Jun 8 03:46:51 2016 |
TD & ML | TapeServer compression disabled |
CHnaged TapeServer configuration file to
disable data compression
|
|
|
244
|
Sat May 28 07:31:07 2016 |
Saturday 8 May 2016 | TD, CG | 15.20 DAQ histogramming & data transfer #1
enabled
Merger configured, started, input paused
|
9x |
|
532
|
Thu Feb 2 13:44:02 2017 |
OH | T9 Test Bench | T9 test setup at Daresbury was powered up
and noise levels were checked using a pulser
peak.
|
  |