AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 15 of 46  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subjectdown Text Attachments
  621   Thu Jun 1 08:49:39 2017 LHB, PVThursday 1 June Evening Shift16.44 DAQ stop BigRIPS, BRIKEN
      AIDA file RIBF127R1/R1_886
 27x 
  619   Wed May 31 16:48:54 2017 TDThursday 1 June 00.00-08.0000.48 BigRIPS DAQ now running

      BRIKEN start run 48
 42x 
  508   Wed Nov 30 21:26:52 2016 CG, DK, TDThursday 1 December00.51 BigRIPS data file 1112.

01.50 BigRIPS data file 1113.
 10x 
  298   Wed Jun 8 20:56:28 2016 CGThurs 9th June04.45 Lowered slow comp threshold on all FEEs
bar nnaida24 to 8 (nnaida24 @ 12).
      Fast comp thresh @ 6 on all nnaida.
 6x 
  643   Wed Jun 7 16:04:42 2017 ZL, DKThurs 8 June 0:00~8:0000:05  Shift change.
       Primary beam current ~4800 enA, 238U^86+
so 50 to 60 pnA.
 13x 
  40   Thu Feb 19 08:21:33 2015 CG, AE, TDThrus 19th Feb progress19/02/15
1000: Check system gives same resolution
as yesterday, removing only the Cu braiding
 39x 
  947   Tue Apr 1 15:34:16 2025 TD, MR, CUTests of new AIDA ASIC mezzanines - 2024 production batch
Tests of new AIDA ASIC mezzanines - 2024
production batch
 11x 
  805   Sun May 19 02:21:43 2019 CATests of low energy calibration on Alpha Data10.23 Low energy calibration program now produces
relative gain coefficients in a format that
can be used with AIDASort
 25x 
  845   Sun Jun 16 04:50:03 2019 CATests of calibration on beta dataAnalysis of RIBF148/R5_170_190, with 500 <
E < 1000 keV energy cut
 25x 
  111   Wed Jul 1 16:42:39 2015 Patrick Coleman-SmithTesting Version 8I have installed Version 8 of the AidaExec
program and FEE_GF_Feb15_6.bin for the VHDL
on the system in T9.
  
  891   Thu Aug 31 15:01:11 2023 TDTest of CAEN N1419B - T9, STFC DL
Noise test of CAEN N1419B in T9, STFC DL.
 7x 
  870   Fri Jul 7 10:52:34 2023 TD, PJCSTest of AIDA FEE64 d8:80:39:42:0d:0b ( aida03 ) - ASIC mezzanine replaced
Test of AIDA FEE64 d8:80:39:42:0d:0b ( aida03
) - ASIC mezzanine replaced
 16x 
  869   Fri Jul 7 10:15:09 2023 TDTest of AIDA FEE64 d8:80:39:41:f6:ee ( aida01 ) - HDMI connector replaced
Test of AIDA FEE64 d8:80:39:41:f6:ee ( aida01
) - HDMI connector replaced. Cooling plate
 17x 
  871   Fri Jul 7 11:59:06 2023 TDTest of AIDA FEE64 - summaryTest of AIDA FEE64s 

ISOL test station STFC DL, T9
 11x 
  890   Wed Aug 30 15:30:50 2023 TDTest of AIDA ASIC mezzanines with FEE64s - summaryTest of ( previously bench-tested OK ) AIDA
ASIC mezzanines using FEE64 nnlycca5 ( MAC
d8:80:39:41:d7:c3 )
 13x 
  943   Thu Mar 28 11:10:09 2024 TDTest of 4x FEE64s at AIDA test station, T9, STFC DLTest of 4x FEE64s at AIDA test station, T9,
STFC DL
 22x 
  918   Tue Nov 14 17:19:11 2023 TDTapeServer, Merger, NetVar etc status   Screenshot_from_2023-11-14_18-18-51.pngScreenshot_from_2023-11-14_18-18-45.pngScreenshot_from_2023-11-14_18-18-34.pngScreenshot_from_2023-11-14_18-18-29.png 
  293   Wed Jun 8 03:46:51 2016 TD & MLTapeServer compression disabled
CHnaged TapeServer configuration file to
disable data compression
  
  244   Sat May 28 07:31:07 2016 Saturday 8 May 2016TD, CG15.20 DAQ histogramming & data transfer #1
enabled
      Merger configured, started, input paused
 9x 
  532   Thu Feb 2 13:44:02 2017 OHT9 Test BenchT9 test setup at Daresbury was powered up
and noise levels were checked using a pulser
peak.
 nnaida114_10.pngnnaida11.pngnnaida114_7.png 
ELOG V3.1.3-7933898