AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 18 of 46  ELOG logo
Entry  Sun Jun 2 04:00:50 2019, TD, Sunday 2 June 21x
12.00 DAQ continues file May19/R15_169

      ASIC settings 2019May19-17.54.03
Entry  Sat Apr 1 16:16:05 2017, OH, CG, Sunday 2 April bias_020417_0146.pngbias_020417_0742.pngBigRIPSlogbias_020417_0922.png
00:12 BigRips started run 0223 (Started at 00:12)
      AIDA file R20_344
      System wide checks all ok
Entry  Sun Jul 1 02:26:50 2018, OH, Sunday 1st July 180701_1025_bias.png
10:25 Bias and leakage currents ok - attachment 1
      FEE Temperatures ok
      System wide checks ok
Entry  Sun Nov 19 01:46:10 2017, CB, TD, Sunday 19 November 14x
10.45 Detector biases & leakage currents OK - see attachments 1
      FEE64 Temperatures OK - see attachment 2
      DAQ statistics OK - note *all* slow comparators 0xa - see attachment 3
Entry  Sun May 19 02:28:07 2019, OH, TD, CA, Sunday 19 May 11x
10:28 DAQ Continues ok
      Alpha run continues - Currently on file R7_5
Entry  Sun Jun 18 02:56:43 2017, TD, Sunday 18 June 11x
10.56 Detector biases & leakage currents OK - see attachments 1 & 2

      USB-controlled ac mains relay input #1 fuse blown - replaced
Entry  Sun Oct 16 03:14:41 2016, TD, Sunday 16 October 16x
11.12 DAQ start (R47)

      Detector bias and leakage currents OK - see attachments 1 & 2
Entry  Sun Jun 16 04:09:40 2019, CA, CB, ML, TD, CG, Sunday 16 June noon-midnight 16x
12.10 DAQ continues OK file RIBF147/R2_145

      100Sn setting, no degrader
Entry  Sat Jun 15 16:53:22 2019, CB, OH, DK, ML, Sunday 16 June 37x

00.30 AIDA file R2_26
      DTAS run 007
Entry  Sun Jul 16 14:20:31 2023, TD, Sunday 16 July contd. 27x
15.20 All ERNI pins of aida01 adaptor PCB OK => FEE64 #1 ASIC #2 channel #5 issue faulty test C? faulty ASIC channel?

      Fitted drain wire from aida06 & aida08 adaptor PCBs to FEE64 cooling plates
Entry  Sun May 14 01:52:49 2017, TD, OH, Sunday 14 May 16x
09.54 DAQ continues OK 
      Current file May2017/R7_292
Entry  Mon May 13 03:43:08 2019, CA, TD, OH, Sunday 12 May 14x

19.12 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Sun Jun 12 03:05:37 2016, TD, AE, CG, MA, Sunday 12 June 2016 part 2 11x

BigRIPS switched from 60Ti to 64V
Entry  Sat Jun 11 17:24:11 2016, DK, TD, Sunday 12 June 2016 14x
Runs 41 and 42 are quite short.  Run 41 was interrupted by the beam dropping (operators called), and run 42 we are just trying to get EURICA to
synchronize with AIDA DAQ.
1:08 Started AIDA Run 43 for 60Ti beam (EURICA run 2027; BigRIPS run 2132; CAEN Run 3018)
Entry  Sat Nov 10 21:53:29 2018, CA, CB, TD, OH, Sunday 11 November 21x
06.53 DAQ continues OK - data transfer disabled

06.55 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Sun Jun 11 08:23:23 2017, PV, Sunday 11 June 16:00-00:00  21x
16:40 beam lost - stripper foil problem
      AIDA file RIBF128/R9_55
Entry  Sun Jun 11 00:07:24 2017, OH, Sunday 11 June 08:00-16:00 25x
08:10 BRIKEN and BigRIPS stops DAQs
      AIDA on file R7_1287
Entry  Sun Dec 10 13:06:27 2023, TD, Sunday 10 December 14x
14.05 S4 closed

Water flow and temperature ( gauges outside S4 entrance ) OK
Entry  Sun Oct 1 12:38:56 2023, TD, Sunday 1 October 13x
12.50 Power up

      All system wide checks OK
Entry  Sun Nov 6 01:34:15 2016, TD, OH, CG, Sun 6th November 18x
10:34 Detector Bias a leakage currents all ok. (Attachments 1 and 2)
      Temperatures all ok (Attachment 3)
      All system wide checks ok other than clock status see attachment 4
ELOG V3.1.3-7933898