AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 18 of 46  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
  ID Date Author Subjectdown Text Attachments
  826   Sun Jun 2 04:00:50 2019 TDSunday 2 June12.00 DAQ continues file May19/R15_169

      ASIC settings 2019May19-17.54.03
 21x 
  549   Sat Apr 1 16:16:05 2017 OH, CGSunday 2 April00:12 BigRips started run 0223 (Started at
00:12)
      AIDA file R20_344
 bias_020417_0146.pngbias_020417_0742.pngBigRIPSlogbias_020417_0922.png 
  733   Sun Jul 1 02:26:50 2018 OHSunday 1st July10:25 Bias and leakage currents ok - attachment
1
      FEE Temperatures ok
 180701_1025_bias.png 
  704   Sun Nov 19 01:46:10 2017 CB, TDSunday 19 November10.45 Detector biases & leakage currents OK
- see attachments 1
      FEE64 Temperatures OK - see attachment
 14x 
  806   Sun May 19 02:28:07 2019 OH, TD, CASunday 19 May10:28 DAQ Continues ok
      Alpha run continues - Currently on
file R7_5
 11x 
  668   Sun Jun 18 02:56:43 2017 TDSunday 18 June10.56 Detector biases & leakage currents OK
- see attachments 1 & 2
 11x 
  388   Sun Oct 16 03:14:41 2016 TDSunday 16 October11.12 DAQ start (R47)

      Detector bias and leakage currents
 16x 
  844   Sun Jun 16 04:09:40 2019 CA, CB, ML, TD, CGSunday 16 June noon-midnight12.10 DAQ continues OK file RIBF147/R2_145

      100Sn setting, no degrader
 16x 
  843   Sat Jun 15 16:53:22 2019 CB, OH, DK, MLSunday 16 June
00.30 AIDA file R2_26
      DTAS run 007
 37x 
  873   Sun Jul 16 14:20:31 2023 TDSunday 16 July contd.15.20 All ERNI pins of aida01 adaptor PCB
OK => FEE64 #1 ASIC #2 channel #5 issue faulty
test C? faulty ASIC channel?
 27x 
  566   Sun May 14 01:52:49 2017 TD, OHSunday 14 May09.54 DAQ continues OK 
      Current file May2017/R7_292
 16x 
  796   Mon May 13 03:43:08 2019 CA, TD, OHSunday 12 May
19.12 all system wide checks OK *except*
nnaida7 fails ADC calibration
 14x 
  311   Sun Jun 12 03:05:37 2016 TD, AE, CG, MASunday 12 June 2016 part 2
BigRIPS switched from 60Ti to 64V
 11x 
  310   Sat Jun 11 17:24:11 2016 DK, TDSunday 12 June 2016Runs 41 and 42 are quite short.  Run
41 was interrupted by the beam dropping (operators
called), and run 42 we are just trying to
 14x 
  774   Sat Nov 10 21:53:29 2018 CA, CB, TD, OHSunday 11 November06.53 DAQ continues OK - data transfer disabled

06.55 all system wide checks OK *except*
 21x 
  655   Sun Jun 11 08:23:23 2017 PVSunday 11 June 16:00-00:00 16:40 beam lost - stripper foil problem
      AIDA file RIBF128/R9_55
 21x 
  654   Sun Jun 11 00:07:24 2017 OHSunday 11 June 08:00-16:0008:10 BRIKEN and BigRIPS stops DAQs
      AIDA on file R7_1287
 25x 
  936   Sun Dec 10 13:06:27 2023 TDSunday 10 December14.05 S4 closed

Water flow and temperature ( gauges outside
 14x 
  895   Sun Oct 1 12:38:56 2023 TDSunday 1 October12.50 Power up

      All system wide checks OK
 13x 
  425   Sun Nov 6 01:34:15 2016 TD, OH, CGSun 6th November10:34 Detector Bias a leakage currents all
ok. (Attachments 1 and 2)
      Temperatures all ok (Attachment 3)
 18x 
ELOG V3.1.3-7933898