| |
ID |
Date |
Author |
Subject |
Text |
 |
|
|
919
|
Wed Nov 15 10:37:00 2023 |
TD | Wednesday 15 November |
11.36 Water flow, pressure & temperature
( 19 deg C ) OK
|
27x |
|
|
928
|
Wed Nov 22 15:12:40 2023 |
TD | /tmp/log8015_error | |
|
|
|
936
|
Sun Dec 10 13:06:27 2023 |
TD | Sunday 10 December | 14.05 S4 closed
Water flow and temperature ( gauges outside |
14x |
|
|
937
|
Mon Dec 11 09:57:54 2023 |
TD | Monday 11 December | Water flow and temperature ( gauges outside
S4 entrance ) OK
|
27x |
|
|
938
|
Mon Dec 11 11:05:27 2023 |
TD | WR timestamp fail aida05 & aida07 |
MACB config
1x level 0
|
11x |
|
|
939
|
Mon Dec 11 23:56:36 2023 |
TD | Tuesday 12 December | 00.55 Observe high frequency noise in aida02
& aida04 ( n+n FEE64s ) - attachments 1-5
and aida05 ( p+n FEE64 )
|
18x |
|
|
943
|
Thu Mar 28 11:10:09 2024 |
TD | Test of 4x FEE64s at AIDA test station, T9, STFC DL | Test of 4x FEE64s at AIDA test station, T9,
STFC DL
|
22x |
|
|
944
|
Thu Mar 28 15:43:47 2024 |
TD | Unable to start MIDAS DAQ with 1x FEE64 ( aida04 ) |
At AIDA test station T9, STFC DL unable to
start MIDAS DAQ with 1x FEE64 ( aida04 ) |
  |
|
|
946
|
Wed Apr 10 16:45:59 2024 |
TD | AIDA interlock |
Honeywell HSS DPS sensor information https://elog.ph.ed.ac.uk/AIDA/932
|
|
|
|
948
|
Mon May 5 13:59:32 2025 |
TD | CARME NFS | -bash-3.2# nfsstat -v
Client packet stats:
packets udp tcp tcpconn
|
|
|
|
244
|
Sat May 28 07:31:07 2016 |
Saturday 8 May 2016 | TD, CG | 15.20 DAQ histogramming & data transfer #1
enabled
Merger configured, started, input paused
|
9x |
|
|
17
|
Fri Oct 24 15:05:28 2014 |
Patrick and Alfredo | new VHDL: FEE_Riken_Apr14_21.bin | New VHDL loaded in NNAIDA#11,#12,#13,#14:
/MIDAS/Aida/FEE_Riken_Apr14_21.bin
The code introduces |
|
|
|
15
|
Thu Oct 2 15:23:38 2014 |
Patrick Coleman-Smith and Chris Griffin | Trial with Filtered AIDA PSU | Assembled three more of the filter boards
and installed them in the AIDA PSU with the
first, wired to use the switchmode power |
|
|
|
7
|
Thu Sep 18 11:18:46 2014 |
Patrick Coleman-Smith | Trying the Liverpool HV supply | The SY1527 supply was delivered with three
modules.
A cable has been made with LEMO00 |
|
|
|
8
|
Mon Sep 22 09:34:37 2014 |
Patrick Coleman-Smith | Clue to difference between ASICs 1&2 and 3&4 | While investigating a VHDL conundrum I
have noticed that the Mux ADC serial readout
clock has a 'FAST' slew rate on ASICs 1&2 |
|
|
|
9
|
Thu Sep 25 11:35:18 2014 |
Patrick Coleman-Smith | Removing the MACB from the system | I have been wondering if the 0v path from
the FEE64s to the MACB where they are joined
is a possible problem. |
|
|
|
10
|
Thu Sep 25 11:53:34 2014 |
Patrick Coleman-Smith | Backup a step to check ASICs | Disconnected the adaptors with the detector.
Added the adaptors with the kapton
cables only attached. |
|
|
|
11
|
Wed Oct 1 13:28:03 2014 |
Patrick Coleman-Smith | Power supply filters | The new pcb for the power supply filter
arrived.
I assembled the components ( after |
 |
|
|
12
|
Wed Oct 1 15:15:32 2014 |
Patrick Coleman-Smith | Power supply filters | 2.0.L FWHM:14.26
2.15.L ( 270pF ) FWHM : 119.04
(ooops found the 'scope channel was |
14x |
|
|
13
|
Wed Oct 1 15:41:07 2014 |
Patrick Coleman-Smith | Power supply filters #3 | Measuring the signal at the FEE64
end.
+5v , -6v , +7v, +7v |
    |