AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 30 of 44  ELOG logo
Entry  Thu Jun 16 08:18:50 2016, TD, AIDA photographs - May 2016  IMG_5751.JPGIMG_5721.JPG
 
Entry  Thu Jun 16 08:12:51 2016, TD, AIDA photographs - June 2016 - 3 IMG_5849.JPGIMG_5850.JPGIMG_5851.JPG
 
Entry  Thu Jun 16 08:07:37 2016, TD, AIDA photographs - June 2016 - 2 IMG_5842.JPGIMG_5843.JPGIMG_5846.JPGIMG_5847.JPG
 
Entry  Thu Jun 16 08:00:10 2016, TD, AIDA photographs - June 2016 - 1 IMG_5838.JPGIMG_5839.JPGIMG_5840.JPGIMG_5841.JPG
 
Entry  Thu Jun 16 03:40:43 2016, TD, Thursday 16 June 2016 70.png71.png72.png74.png75.png
10.40 DAQ stalled AIDA75_30 c. 01.36

      SYNC errors since baseline (start of AIDA75) - attachment 1
Entry  Wed Jun 15 01:43:47 2016, TD, Wednesday 15 June 2016 6x
09.19 DAQ stalled AIDA72_87 c. 01.25

      SYNC errors since baseline (start of AIDA72) - attachment 1
Entry  Tue Jun 14 01:42:56 2016, TD, Tuesday 14 June 2016 7x
09.35 AIDA67 stalled AIDA67_43 (c. 01.27)
      DAQ stopped and file closed 09.32
Entry  Mon Jun 13 03:45:15 2016, TD, Monday 13 June 2016 20x
10.20 AIDA62 found stalled - no SYNCs, no data transfer
      All FEE64s pass all system-wide tests *except* nnaida3 & nnaida8 which fail ADC calibration
      Data files indicate DAQ stopped c. 06.56
Entry  Sun Jun 12 19:19:22 2016, DK, Machine Time End 
3:13 operators call to tell us the machine time is over.  No more EURICA!
          AIDA62_23 ought to be the last file with legitimate physics data
          We will leave the DAQ running overnight as a b/g run.
Entry  Sun Jun 12 03:05:37 2016, TD, AE, CG, MA, Sunday 12 June 2016 part 2 11x

BigRIPS switched from 60Ti to 64V
Entry  Sat Jun 11 17:24:11 2016, DK, TD, Sunday 12 June 2016 14x
Runs 41 and 42 are quite short.  Run 41 was interrupted by the beam dropping (operators called), and run 42 we are just trying to get EURICA to
synchronize with AIDA DAQ.
1:08 Started AIDA Run 43 for 60Ti beam (EURICA run 2027; BigRIPS run 2132; CAEN Run 3018)
Entry  Sat Jun 11 16:06:16 2016, TD, [How To] Monitor per FEE64 Activity 

Launch terminal and enter commands
Entry  Sat Jun 11 15:48:49 2016, TD, [How To] Monitor Pause-Resume Times 
The basic GREAT data format analyser will report per FEE cumulative
pause-resume times which should be << timestamp elapsed time (which
is time taken to write the data file analysed).
Entry  Sat Jun 11 13:57:09 2016, laura, How to monitor and check synchronisation of FEES eg1.pngeg2.pngeg3.pngeg4.png
Alfredo has written a program to check the synchronisation of the FEES, which need to be checked regularly
 
To do this:
Entry  Sat Jun 11 10:29:16 2016, AE, TD, LHB, synchronization between different FEEs AIDA10_20_pulser_allign.pngAIDA10_40_pulser_allign.pngAIDA34_puls_alignm.png
file AIDA10_20: stopped on June 10, 14:59
file AIDA10_40: stopped on June 10, 16:16
Entry  Fri Jun 10 21:07:52 2016, AE, DK, TD, ML, MA, Saturday 11 June 2016 8x
04.51 Start run AIDA18.  Beam is back from the operators.
      Scalers are shown as attachment 1
      Leak currents seem okay (all < 5 uA), shown as attachments 2 and 3.
Entry  Fri Jun 10 14:14:56 2016, TD, nnaida19 4.png5.png6.png

See attachments 1 and 2 and spot the difference ...
Entry  Fri Jun 10 14:02:17 2016, TD (courtesy VFEP), [How to] Avoid Power-Cycling/Rebooting FEE64s 

If you obtain the 'unable to connect' from one, or more, of the FEE64s try the
following procedure *before* power-cycling/rebooting all of the FEE64s. 
Entry  Fri Jun 10 12:51:19 2016, TD, ADC offsets - pass 1 -18.15 3 June 2016 offsets.dat

Column order:
Entry  Fri Jun 10 08:04:11 2016, YS, Leakage Currents Spread Sheet AIDA_leakage_current.ods44.png
Leakage Currents Spread Sheet and Chart
ELOG V3.1.4-unknown