Mon Nov 14 05:51:36 2016, TD, Monday 14 November  
|
14.51 DSSSD bias & leakage currents OK - see attachments 1 & 2
Ambient temperature +24.8 deg C, d.p. +7.2 deg C, RH 32.6%
|
Mon May 13 03:23:58 2019, CA, TD, OH, Monday 13 May 18x
|
09.55 all system wide checks OK *except* nnaida7 fails ADC calibration
|
Mon Jun 13 03:45:15 2016, TD, Monday 13 June 2016 20x
|
10.20 AIDA62 found stalled - no SYNCs, no data transfer
All FEE64s pass all system-wide tests *except* nnaida3 & nnaida8 which fail ADC calibration
Data files indicate DAQ stopped c. 06.56
|
Mon Nov 12 08:59:43 2018, LS, CA, TD, Monday 12 November 6pm onwards 28x
|
17:59 DAQ continues OK
|
Sun Nov 11 21:35:42 2018, CB, OH, CA, LS, Monday 12 November 20x
|
06:35 DAQ Continues ok
Stats ok - attachment 1
FEE Temps ok - attachment 2
|
Mon Jun 12 08:02:01 2017, TD, Monday 12 June 16.00-24.00 26x
|
16.01 DAQ continues
16.01 Detector biases & leakage currents OK - see attachments 1 & 2
|
Sun Jun 11 16:04:12 2017, DK, Monday 12 June 0:00 ~ 8:00 10x
|
0:04 Biases and leak currents shown as attachment #1, 12JunBias1.png
System-wide checks: nnaida13 fails ADC calib, all others okay
Temperatures shown as attachment #2, 12JunTemp1.png
|
Mon Jun 12 00:31:29 2017, ZLiu, TD, OH, Monday 12 June 08:00-16:00 11x
|
09:00 Stop DAQ to tune the Sm beam, may need 3 hours
AIDA file RIBF128/R9_319
|
Mon Dec 11 09:57:54 2023, TD, Monday 11 December 27x
|
Water flow and temperature ( gauges outside S4 entrance ) OK
BNC PB-5 pulser connected to p+n FEE64s by diasy chain of test + inputs
|
Mon Oct 10 03:15:59 2016, CG & TD, Monday 10 October 25x
|
10.30 DAQ found stopped
|
Mon Jun 10 01:43:16 2019, CA, CB, TD, CG, OH, DK, Monday 10 June 19x
|
09:45 DAQ continues ok
all system wide checks OK *except* nnaida7 fails ADC calibration
|
Mon Oct 1 01:10:57 2018, OH, TD, Monday 1 October 10x
|
09.10 DAQ continues OK - current file Sep18/R2_16
09.15 all system wide checks OK *except* nnaida7 fails ADC calibration
|
Mon Jun 17 08:03:37 2019, CA, CB, TD, OH, Mon Jun 17 16:00-24:00 19x
|
16:04 DAQ continues running OK
All system-wide checks OK except nnaida7 ADC calibration fails
FEE64 temperatures OK - attach 1
|
Mon Oct 23 11:50:09 2017, TD, OH, Mon 23 Oct - further information please.
|
> 10:18 Leakage and bias ok - Attachment 1
> FEE temperatures ok - Attachment 2
> Statistics - Attachment 3
|
Mon Dec 14 19:25:35 2015, AE, CG ,Phong, Merger/TapeServer trouble report    
|
Sat. 12/12/15
Working with a 8-FEE setup (as in https://elog.ph.ed.ac.uk/AIDA/133). We could open a file with the
|
Sun Jun 5 01:20:39 2016, DK, AE, GL, PJW, Merger wants first SYNC
|
Trying to start the AIDA DAQ now that the RI beam is (nearly) ready. However, we cannot get merging to work. But the merger status has "Merge
State = GOing : paused : xfer enabled :
want first SYNC" but the last part ought to show "output paused" or after merge begins, "ready for SYNC". We restarted |
Mon May 29 07:05:06 2017, TD, Merger error messages and SEGV   
|
Overnight and earlier today Obtained the following Merger error messages
|
Wed May 31 16:43:52 2017, TD, Merger & TapeServer server startup scripts modified 
|
aidas1> cd /MIDAS/Merger/AIDA
aidas1> ls
|
Wed Apr 22 07:28:25 2015, AE (PM), Mechanical setup instructions: AIDA+EURICA at F11
|
Attached are Paul Morrall's instructions on how to move new AIDA support table into place, for a setup with
EURICA at F11 (March 2015). |
Sun Jun 12 19:19:22 2016, DK, Machine Time End
|
3:13 operators call to tell us the machine time is over. No more EURICA!
AIDA62_23 ought to be the last file with legitimate physics data
We will leave the DAQ running overnight as a b/g run. |