AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 34 of 46  ELOG logo
Entry  Tue May 5 16:40:23 2015, JA, TD, AE, CG & JLT, Wednesday 6 May 2015 140.png
00.00 Degrader changed to 4mm + some of variable (need to confirm)
      Extra 1mm removed.
Entry  Thu May 7 01:32:39 2015, JA, TD, AE, CG & JLT, Thursday 7 May 2015 
09.25 R69 continues
      100Kr setting, degrader 4mm + 0.4mm (variable) Al
      DSSSD #1 off due to detector failure ( https://elog.ph.ed.ac.uk/AIDA/101 )
Entry  Fri May 8 01:05:18 2015, JA, TD, AE & CG, Friday 8 May 2015 150.png
08.50 FEE64 temperatures (attachment 1)

09.03 R70 ends OK
Entry  Mon Apr 27 01:48:59 2015, JA, LHB, TD, VP, AE & CG, Monday 27 April 2015 8x
DSSSD #1 +100V, +3.8uA
DSSSD #2 +100V, +5.5uA
Entry  Wed Apr 29 01:03:41 2015, JA, LHB, TD, AE, CG & VP, Wednesday 29 April 2015 16x
Overnight
      Beam tuning, PID tests - beam stopped in scintilator detector + 1" thick Pb bricks 
      DAQ ran OK (not to disk)
Entry  Thu Apr 30 16:20:54 2015, JA, LHB, TD, AE, CG & VP, Friday 1 May 2015 
      diode link threshold 0xca -> 0xb6
                           0x11 -> 0x2c 
Entry  Sat Apr 25 03:56:44 2015, JA, LHB, TD, AE & CG, Saturday 25 April 2015 IMG_2852.JPGIMG_2853.JPGIMG_2858.JPGIMG_2860.JPG

1130: Rotated forward water inlet connection to point towards rear of AIDA stand to remedy mechanical
      conflict with EURICA support frame - see attachments. During drain and re-fill of Julabo FL1106
Entry  Sun Apr 26 02:28:59 2015, JA, LHB, TD, AE & CG, Sunday 26 April 2015 33x

Upstream, 207Bi source
Entry  Tue Apr 28 06:25:13 2015, JA, LHB, TD, AE & CG, Tuesday 28th April progress 6x
28/04/15
1420: Carried out ASIC optimisation tests to find best shaping time. Chose system wide shaping time of 0x6.
           Waveforms of example FEEs/channels attachments 1-6.
Entry  Mon Feb 23 07:23:08 2015, J. Agramunt, H. Baba, A. Estrade, DAQ correlation test DAQcorrelation_diagram.pdfDAQsoftware.pdfcorrelation_25Hz.pngcorrelation_random.png
The attached figure shows the configuration used to test the synchronization of the DAQ systems using a
correlation scalar counted from a common clock signal (DAQcorrelation_diagram.pdf). 
Entry  Mon Jun 6 08:57:34 2016, GL,PW, YS, TD, ML, AIDA run 1112 - Sync problem 
After starting run 1112, we noticed that the merge program was waiting for a first sync. It then turned out that all syncs had disappeared. This required
an entire reboot of the AIDA DAQ. Consequently, AIDA run 1112 should not be used. 
Entry  Wed Mar 1 16:42:06 2023, Further results from Mezzanine bench tests, PJCS mezz_cap_gone_resized.jpgmezz_resistors_resized.jpg
Carried out some further work on failed mezzanine modules.

Inspected them externally and removed the copper block, internally with a bench microscope.

Found two obvious faults ..... broken components with scrambled pcb tracks.
Entry  Mon Mar 27 03:28:53 2017, DK, TD, JA, Clock settings at the waveform generator stage 
Clock settings for this experiment are slightly different than in the previous case.

Below are strictly the settings for the waveform generator itself.
Entry  Tue Nov 8 13:06:18 2016, DK, TD, CG, OH, NP1412 Run 1 14_JST_2016.png
AIDA run with Takechi experiment. 71~73 Ni beam setting

F5 carbon target is:    IN

F7 CH2 target is:        OUT
Entry  Sat Jun 11 17:24:11 2016, DK, TD, Sunday 12 June 2016 14x
Runs 41 and 42 are quite short.  Run 41 was interrupted by the beam dropping (operators called), and run 42 we are just trying to get EURICA to
synchronize with AIDA DAQ.
1:08 Started AIDA Run 43 for 60Ti beam (EURICA run 2027; BigRIPS run 2132; CAEN Run 3018)
Entry  Tue Nov 8 23:16:15 2016, DK, TD, NP1412 R11 R11_USB1.pngR11_USB2.png
Recovered AIDA after power cycle (unknown cause of crash from the end of R10)

Corresponding run in BRIKEN: 161109_0814_747576Ni_012

 
Entry  Tue Nov 8 23:36:56 2016, DK, TD, NP1412 R12 10x
Takechi team changes the condition: F5 carbon; F7 empty; F11 carbon

  F11 Plastic is 1.1kHz

BRIKEN: 161109_0828_747576Ni_013.dlt
Entry  Sat Nov 26 06:57:36 2016, DK, TD, Offline analysis of R7_37 100.png101.png102.pngK3MVQY.tmp

R7_37 3mm Pb + from 0 to 1.8mm W (+ up to 3mm Al, 1mm per W layer - 0.3mm W, 0.5mm W & 1.0 W))
Entry  Wed Mar 29 08:13:34 2017, DK, PV, JL, CG, Degrader, Pb wall opening 
16:21

Chris noticed that when the degraders that are at the beam right position when they are "out" may not be fully removed from the beamline.  It's difficult
Entry  Tue Jul 5 13:43:02 2016, DK, PV, Pulser Test Run after AIDA is moved 10x
Needed to run startx and start the TcLHttpd server on rpi
Following along here: https://elog.ph.ed.ac.uk/AIDA/242
Can now access http://nnrpi1:8015/AIDA/Rly16/
ELOG V3.1.3-7933898