Tue May 5 16:40:23 2015, JA, TD, AE, CG & JLT, Wednesday 6 May 2015
|
00.00 Degrader changed to 4mm + some of variable (need to confirm)
Extra 1mm removed.
|
Thu May 7 01:32:39 2015, JA, TD, AE, CG & JLT, Thursday 7 May 2015
|
09.25 R69 continues
100Kr setting, degrader 4mm + 0.4mm (variable) Al
DSSSD #1 off due to detector failure ( https://elog.ph.ed.ac.uk/AIDA/101 ) |
Fri May 8 01:05:18 2015, JA, TD, AE & CG, Friday 8 May 2015
|
08.50 FEE64 temperatures (attachment 1)
09.03 R70 ends OK
|
Mon Apr 27 01:48:59 2015, JA, LHB, TD, VP, AE & CG, Monday 27 April 2015 8x
|
DSSSD #1 +100V, +3.8uA
DSSSD #2 +100V, +5.5uA
|
Wed Apr 29 01:03:41 2015, JA, LHB, TD, AE, CG & VP, Wednesday 29 April 2015 16x
|
Overnight
Beam tuning, PID tests - beam stopped in scintilator detector + 1" thick Pb bricks
DAQ ran OK (not to disk)
|
Thu Apr 30 16:20:54 2015, JA, LHB, TD, AE, CG & VP, Friday 1 May 2015
|
diode link threshold 0xca -> 0xb6
0x11 -> 0x2c
|
Sat Apr 25 03:56:44 2015, JA, LHB, TD, AE & CG, Saturday 25 April 2015   
|
1130: Rotated forward water inlet connection to point towards rear of AIDA stand to remedy mechanical
conflict with EURICA support frame - see attachments. During drain and re-fill of Julabo FL1106
|
Sun Apr 26 02:28:59 2015, JA, LHB, TD, AE & CG, Sunday 26 April 2015 33x
|
Upstream, 207Bi source
|
Tue Apr 28 06:25:13 2015, JA, LHB, TD, AE & CG, Tuesday 28th April progress 6x
|
28/04/15
1420: Carried out ASIC optimisation tests to find best shaping time. Chose system wide shaping time of 0x6.
Waveforms of example FEEs/channels attachments 1-6. |
Mon Feb 23 07:23:08 2015, J. Agramunt, H. Baba, A. Estrade, DAQ correlation test   
|
The attached figure shows the configuration used to test the synchronization of the DAQ systems using a
correlation scalar counted from a common clock signal (DAQcorrelation_diagram.pdf).
|
Mon Jun 6 08:57:34 2016, GL,PW, YS, TD, ML, AIDA run 1112 - Sync problem
|
After starting run 1112, we noticed that the merge program was waiting for a first sync. It then turned out that all syncs had disappeared. This required
an entire reboot of the AIDA DAQ. Consequently, AIDA run 1112 should not be used. |
Wed Mar 1 16:42:06 2023, Further results from Mezzanine bench tests, PJCS 
|
Carried out some further work on failed mezzanine modules.
Inspected them externally and removed the copper block, internally with a bench microscope.
Found two obvious faults ..... broken components with scrambled pcb tracks. |
Mon Mar 27 03:28:53 2017, DK, TD, JA, Clock settings at the waveform generator stage
|
Clock settings for this experiment are slightly different than in the previous case.
Below are strictly the settings for the waveform generator itself.
|
Tue Nov 8 13:06:18 2016, DK, TD, CG, OH, NP1412 Run 1
|
AIDA run with Takechi experiment. 71~73 Ni beam setting
F5 carbon target is: IN
F7 CH2 target is: OUT |
Sat Jun 11 17:24:11 2016, DK, TD, Sunday 12 June 2016 14x
|
Runs 41 and 42 are quite short. Run 41 was interrupted by the beam dropping (operators called), and run 42 we are just trying to get EURICA to
synchronize with AIDA DAQ.
1:08 Started AIDA Run 43 for 60Ti beam (EURICA run 2027; BigRIPS run 2132; CAEN Run 3018) |
Tue Nov 8 23:16:15 2016, DK, TD, NP1412 R11 
|
Recovered AIDA after power cycle (unknown cause of crash from the end of R10)
Corresponding run in BRIKEN: 161109_0814_747576Ni_012
|
Tue Nov 8 23:36:56 2016, DK, TD, NP1412 R12 10x
|
Takechi team changes the condition: F5 carbon; F7 empty; F11 carbon
F11 Plastic is 1.1kHz
BRIKEN: 161109_0828_747576Ni_013.dlt |
Sat Nov 26 06:57:36 2016, DK, TD, Offline analysis of R7_37   
|
R7_37 3mm Pb + from 0 to 1.8mm W (+ up to 3mm Al, 1mm per W layer - 0.3mm W, 0.5mm W & 1.0 W))
|
Wed Mar 29 08:13:34 2017, DK, PV, JL, CG, Degrader, Pb wall opening
|
16:21
Chris noticed that when the degraders that are at the beam right position when they are "out" may not be fully removed from the beamline. It's difficult |
Tue Jul 5 13:43:02 2016, DK, PV, Pulser Test Run after AIDA is moved 10x
|
Needed to run startx and start the TcLHttpd server on rpi
Following along here: https://elog.ph.ed.ac.uk/AIDA/242
Can now access http://nnrpi1:8015/AIDA/Rly16/ |