AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 34 of 46  ELOG logo
  ID Date Authordown Subject Text Attachments
  101   Tue May 5 16:40:23 2015 JA, TD, AE, CG & JLTWednesday 6 May 201500.00 Degrader changed to 4mm + some of variable
(need to confirm)
      Extra 1mm removed.
 140.png 
  102   Thu May 7 01:32:39 2015 JA, TD, AE, CG & JLTThursday 7 May 201509.25 R69 continues
      100Kr setting, degrader 4mm + 0.4mm
(variable) Al
  
  103   Fri May 8 01:05:18 2015 JA, TD, AE & CGFriday 8 May 201508.50 FEE64 temperatures (attachment 1)

09.03 R70 ends OK
 150.png 
  73   Mon Apr 27 01:48:59 2015 JA, LHB, TD, VP, AE & CGMonday 27 April 2015DSSSD #1 +100V, +3.8uA
DSSSD #2 +100V, +5.5uA
 8x 
  78   Wed Apr 29 01:03:41 2015 JA, LHB, TD, AE, CG & VPWednesday 29 April 2015Overnight
      Beam tuning, PID tests - beam stopped
in scintilator detector + 1" thick Pb bricks
 16x 
  87   Thu Apr 30 16:20:54 2015 JA, LHB, TD, AE, CG & VPFriday 1 May 2015      diode link threshold 0xca -> 0xb6
                           0x11 -> 0x2c 
  
  71   Sat Apr 25 03:56:44 2015 JA, LHB, TD, AE & CGSaturday 25 April 2015
1130: Rotated forward water inlet connection
to point towards rear of AIDA stand to remedy
 IMG_2852.JPGIMG_2853.JPGIMG_2858.JPGIMG_2860.JPG 
  72   Sun Apr 26 02:28:59 2015 JA, LHB, TD, AE & CGSunday 26 April 2015
Upstream, 207Bi source
 33x 
  76   Tue Apr 28 06:25:13 2015 JA, LHB, TD, AE & CGTuesday 28th April progress28/04/15
1420: Carried out ASIC optimisation
tests to find best shaping time. Chose system
 6x 
  46   Mon Feb 23 07:23:08 2015 J. Agramunt, H. Baba, A. EstradeDAQ correlation testThe attached figure shows the configuration
used to test the synchronization of the DAQ
systems using a
 DAQcorrelation_diagram.pdfDAQsoftware.pdfcorrelation_25Hz.pngcorrelation_random.png 
  280   Mon Jun 6 08:57:34 2016 GL,PW, YS, TD, MLAIDA run 1112 - Sync problemAfter starting run 1112, we noticed that
the merge program was waiting for a first
sync. It then turned out that all syncs had
  
  865   Wed Mar 1 16:42:06 2023 Further results from Mezzanine bench testsPJCSCarried out some further work on failed
mezzanine modules.

Inspected them externally and removed
 mezz_cap_gone_resized.jpgmezz_resistors_resized.jpg 
  536   Mon Mar 27 03:28:53 2017 DK, TD, JAClock settings at the waveform generator stageClock settings for this experiment are slightly
different than in the previous case.
  
  432   Tue Nov 8 13:06:18 2016 DK, TD, CG, OHNP1412 Run 1AIDA run with Takechi experiment. 71~73
Ni beam setting

F5 carbon target is:   
 14_JST_2016.png 
  310   Sat Jun 11 17:24:11 2016 DK, TDSunday 12 June 2016Runs 41 and 42 are quite short.  Run
41 was interrupted by the beam dropping (operators
called), and run 42 we are just trying to
 14x 
  440   Tue Nov 8 23:16:15 2016 DK, TDNP1412 R11Recovered AIDA after power cycle (unknown
cause of crash from the end of R10)

Corresponding run in BRIKEN: 161109_0814_747576Ni_012
 R11_USB1.pngR11_USB2.png 
  441   Tue Nov 8 23:36:56 2016 DK, TDNP1412 R12Takechi team changes the condition: F5
carbon; F7 empty; F11 carbon

  F11 Plastic is 1.1kHz
 10x 
  470   Sat Nov 26 06:57:36 2016 DK, TDOffline analysis of R7_37
R7_37 3mm Pb + from 0 to 1.8mm W (+ up to
3mm Al, 1mm per W layer - 0.3mm W, 0.5mm
 100.png101.png102.pngK3MVQY.tmp 
  542   Wed Mar 29 08:13:34 2017 DK, PV, JL, CGDegrader, Pb wall opening16:21

Chris noticed that when the degraders that
  
  324   Tue Jul 5 13:43:02 2016 DK, PVPulser Test Run after AIDA is movedNeeded to run startx and start the TcLHttpd
server on rpi
Following along here: https://elog.ph.ed.ac.uk/AIDA/242
 10x 
ELOG V3.1.3-7933898