AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 35 of 46  ELOG logo
ID Dateup Author Subject Text Attachments
  700   Fri Nov 17 10:03:25 2017 CB, TDFriday 17 November19.03 DAQ started OK - data transfer not enabled

      BNC PB-4
 32x 
  701   Sat Nov 18 03:37:46 2017 TDOffline analysis RIBF128/R5_124-R5_148, Oct17/R17_31-R17_34 and Nov17/R2_8-R2_16 dataOffline analysis of

AIDA RIBF128/R5_124 to R5_148 data "130Ag
 100.png101.png102.png103.png 
  702   Sat Nov 18 03:53:43 2017 TDOffline analysis Nov17/R2_8-R2_16 data MIDASsort offline analysis Nov17/R2_8-R2_16
data
 22x 
  703   Sat Nov 18 04:25:16 2017 CB, TDSaturday 18 November
13.27 Detector biases & leakage currents
OK - see attachments 1 & 2
 19x 
  704   Sun Nov 19 01:46:10 2017 CB, TDSunday 19 November10.45 Detector biases & leakage currents OK
- see attachments 1
      FEE64 Temperatures OK - see attachment
 14x 
  706   Mon Nov 20 00:53:27 2017 TD, CBMonday 20 November09.50 Detector biases & leakage currents OK
- see attachments 1 & 2
      FEE64 Temperatures OK - see attachment
 9x 
  707   Tue Nov 21 00:30:31 2017 TD, CBTuesday 21 November09.27 Detector biases & leakage currents OK
- see attachments 1 & 2
      FEE64 Temperatures OK - see attachment
 20x 
  708   Thu Nov 23 00:41:43 2017 TD, CBThursday 23 November 09.33 Detector biases & leakage currents OK
- see attachments 1 & 2
      FEE64 Temperatures OK - see attachment
 10x 
  710   Thu Nov 23 01:10:43 2017 TD, CBDetector bias & leakage currents - October & November 2017https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=282765719  AIDA_leakage_current(16).xlsx 
  712   Thu Nov 23 01:12:33 2017 TD, CBAIDA to safe shutdown state10.11 Detector bias OFF
      FEE64 power OFF
      BNC PB-4 OFF
  
  713   Tue Jun 19 06:08:03 2018 TDTuesday 19 June 201813.00

Julabo FL11006 chiller
  
  715   Wed Jun 20 03:33:06 2018 TDWednesday 20 June 11.09 Julabo FL11006 recirculating chiller
- ON - water level OK (75%)
      Tektronix AFG3102 - CH2 ON - amplitude
 14x 
  716   Thu Jun 21 02:31:49 2018 TD, OHThursday 21 June10.20 DAQ continues OK

10.29 DAQ stop June18/R1
 30.png31.png32.png33.png34.png 
  717   Thu Jun 21 05:23:16 2018 TD, OHOffline analysis R1 - alpha background
Analysis of overnight alpha background run
(June18/R1_0 ... _2) indicates that all FEE64s
 8x 
  718   Thu Jun 21 06:48:22 2018 TD, OHDSSSD HV cablingThe DSSSD HV cabling has been changed in preparation
for configuration change
from 6x DSSSDs to 8x DSSSDs as follows:
 50.png51.png 
  719   Fri Jun 22 02:50:37 2018 OH, TDFriday 22 June 201810:50 Yesterday 4 FEE modules installed for
FEE64s 25-32
      dhcpd.conf updated to reflect MAC addresses
 60.png70.png71.pngstartup.tcldhcpd.conf 
  720   Sat Jun 23 02:28:13 2018 TD, OHNew fuses fitted to USB-controlled ac mains relay
The input fuses of the USB-controlled ac
mains relay have been changed from 2x 5x20mm
 2290195.pdf 
  721   Sat Jun 23 02:44:36 2018 OH, TDSaturday 23 June 2018
      DSSSD stack dismounted yesterday to
change configuration from 6x to 8x DSSSDs.
 16x 
  722   Sun Jun 24 01:40:08 2018 OH, TDSunday 24 June 2018
09.38 DAQ continues OK
 15x 
  723   Sun Jun 24 09:08:03 2018 3OH, TDJune 2018 New Stack ConfigurationStack has been changed in configuration from
a 6 DSSD stack to 8 DSSD stack.
What was detectors 1-6 are now 3-8 with 2
 IMG_20180623_104349.jpgIMG_20180623_113315.jpg 
ELOG V3.1.4-unknown